Abstract:
A device implementing signal validation for secure ranging includes at least one processor configured to obtain a channel estimate based at least in part on a signal received from an other device over a channel. The at least one processor may be further configured to determine an average noise level of a beginning portion of the channel estimate and establish a direct path signal acceptance level for the channel estimate based at least in part on the average noise level. The at least one processor may further configured to identify a candidate direct path signal for the channel in a remaining portion of the channel estimate and validate the candidate direct path signal as a direct path signal for the channel when a signal level corresponding to the candidate direct path signal satisfies the direct path signal acceptance level, otherwise reject the candidate direct path signal as the direct path signal for the channel.
Abstract:
A method for controlling transmission power in accordance with a total transmission power limit in a multi-radio wireless communication device including a master radio and a slave radio is provided. The method can include the wireless communication device determining, at the master radio, a transmission power of the master radio. The method can further include the wireless communication device providing information indicative of the transmission power of the master radio from the master radio to the slave radio. The method can additionally include determining, at the slave radio, an allowable transmission power for the slave radio. A sum of the allowable transmission power and the transmission power of the master radio may not exceed the total transmission power limit.
Abstract:
A method for controlling transmission power in accordance with a total transmission power limit in a multi-radio wireless communication device including a master radio and a slave radio is provided. The method can include the wireless communication device determining, at the master radio, a transmission power of the master radio. The method can further include the wireless communication device providing information indicative of the transmission power of the master radio from the master radio to the slave radio. The method can additionally include determining, at the slave radio, an allowable transmission power for the slave radio. A sum of the allowable transmission power and the transmission power of the master radio may not exceed the total transmission power limit.
Abstract:
A test system may include a master test station and slave test stations. The test stations may receive devices under test such as portable wireless electronic devices. Each test station may have adjustable antenna structures coupled to test equipment. The adjustable antenna structures may include antenna support structures on which test antennas are mounted and rail along which the antenna support structures and test antennas are moved by a pneumatic positioner. A rotatable platform may be provided in each test station to support the device under test in that test station. By making a series of over-the-air test measurements in the master test station while adjusting the antenna system and device positioning system, a satisfactory location for the active test antenna and device position may be identified. This configuration may then be used in performing single-point over-the-air tests in the slave test stations.
Abstract:
A test system may include a master test station and slave test stations. The test stations may receive devices under test such as portable wireless electronic devices. Each test station may have adjustable antenna structures coupled to test equipment. The adjustable antenna structures may include antenna support structures on which test antennas are mounted and rail along which the antenna support structures and test antennas are moved by a pneumatic positioner. A rotatable platform may be provided in each test station to support the device under test in that test station. By making a series of over-the-air test measurements in the master test station while adjusting the antenna system and device positioning system, a satisfactory location for the active test antenna and device position may be identified. This configuration may then be used in performing single-point over-the-air tests in the slave test stations.