MAXIMIZING SERVER UTILIZATION WITHIN A DATACENTER
    3.
    发明申请
    MAXIMIZING SERVER UTILIZATION WITHIN A DATACENTER 有权
    最大化服务器在DATACENTER中的使用

    公开(公告)号:US20140040474A1

    公开(公告)日:2014-02-06

    申请号:US13562764

    申请日:2012-07-31

    IPC分类号: G06F15/173

    摘要: A method of maximizing server utilization within a datacenter comprising collocating a number of workloads to a subset of a number of physical servers within a datacenter, adjusting access to resources by critical and non-critical workloads, isolating a number of critical workloads that share resources to the subset of resource instances, and controlling resource utilization of the collocated workloads. A system for collocating workloads in a datacenter, the system comprising a number of servers communicatively coupled to each other and a collocation module that receives information from each server and decides whether to leave a workload running on one of any of the servers on that server, or migrate a workload running on one of the number of servers to another server.

    摘要翻译: 一种使数据中心内的服务器利用率最大化的方法,包括将若干工作负载并入数据中心内的多个物理服务器的子集,通过关键和非关键工作负载调整对资源的访问,将共享资源的多个关键工作负载隔离 资源实例的子集,以及控制并置工作负载的资源利用。 一种用于将数据中心中的工作负载并置的系统,所述系统包括彼此通信耦合的多个服务器以及从每个服务器接收信息并决定是否在该服务器上的任何服务器之一上运行工作负载的并置模块, 或将运行在其中一个服务器上的工作负载迁移到另一个服务器。

    Maximizing server utilization within a datacenter
    5.
    发明授权
    Maximizing server utilization within a datacenter 有权
    最大化数据中心内的服务器利用率

    公开(公告)号:US09104498B2

    公开(公告)日:2015-08-11

    申请号:US13562764

    申请日:2012-07-31

    IPC分类号: G06F15/173 G06F9/50

    摘要: A method of maximizing server utilization within a datacenter comprising collocating a number of workloads to a subset of a number of physical servers within a datacenter, adjusting access to resources by critical and non-critical workloads, isolating a number of critical workloads that share resources to the subset of resource instances, and controlling resource utilization of the collocated workloads. A system for collocating workloads in a datacenter, the system comprising a number of servers communicatively coupled to each other and a collocation module that receives information from each server and decides whether to leave a workload running on one of any of the servers on that server, or migrate a workload running on one of the number of servers to another server.

    摘要翻译: 一种使数据中心内的服务器利用率最大化的方法,包括将若干工作负载并入数据中心内的多个物理服务器的子集,通过关键和非关键工作负载调整对资源的访问,将共享资源的多个关键工作负载隔离 资源实例的子集,以及控制并置工作负载的资源利用。 一种用于将数据中心中的工作负载并置的系统,所述系统包括彼此通信耦合的多个服务器以及从每个服务器接收信息并决定是否在该服务器上的任何服务器之一上运行工作负载的并置模块, 或将运行在其中一个服务器上的工作负载迁移到另一个服务器。

    Managing computer resources
    6.
    发明授权
    Managing computer resources 有权
    管理电脑资源

    公开(公告)号:US09003003B1

    公开(公告)日:2015-04-07

    申请号:US12559849

    申请日:2009-09-15

    IPC分类号: H04L15/16 H04L29/06

    摘要: Managing computer resources. Workload state information associated with one or more servers in a data center is accessed by a computer, the workload state information comprises workload placement on one or more servers, cooling conditions of the one or more servers, and performance requirements associated with a data center. Cooling state information of cooling resources associated with the one or more servers are accessed by the computer, the cooling state information comprises cooling conditions of the cooling resources. The workload state information and the cooling state information are compared by the computer. Based on the comparing, the computer generates workload repositioning instructions that instruct repositioning of workload on the one or more servers to meet the performance requirements.

    摘要翻译: 管理电脑资源 与数据中心中的一个或多个服务器相关联的工作负载状态信息由计算机访问,工作负载状态信息包括一个或多个服务器上的工作负载布置,一个或多个服务器的冷却条件以及与数据中心相关联的性能要求。 与该一个以上的服务器相关联的冷却资源的冷却状态信息由计算机访问,冷却状态信息包括冷却资源的冷却条件。 计算机对工作负载状态信息和冷却状态信息进行比较。 基于比较,计算机生成工作负载重新定位指令,指示重新定位一个或多个服务器上的工作负载以满足性能要求。

    Estimating Business Service Responsiveness
    8.
    发明申请
    Estimating Business Service Responsiveness 审中-公开
    估计业务服务响应

    公开(公告)号:US20120221373A1

    公开(公告)日:2012-08-30

    申请号:US13036466

    申请日:2011-02-28

    IPC分类号: G06Q10/00

    CPC分类号: G06Q10/04 G06Q10/067

    摘要: An embodiment includes gathering input data including observed utilizations of allocations and business service response times. The input data is partitioned into a plurality of data sets that include at least one training data set and at least one test data set. A model is generated that predicts responsiveness using the at least one training data set. The model is evaluated using the at least one test data set, and a business service response time distribution is predicted using the model. An embodiment may use a trace-based capacity planning methodology to estimate the impact of planning alternatives on business service responsiveness.

    摘要翻译: 一个实施例包括收集输入数据,包括观察到的分配利用率和业务服务响应时间。 输入数据被分割成包括至少一个训练数据集和至少一个测试数据集的多个数据集。 生成使用至少一个训练数据集来预测响应性的模型。 使用至少一个测试数据集评估该模型,并使用模型预测业务服务响应时间分布。 一个实施例可以使用基于跟踪的容量规划方法来估计替代方案对业务服务响应性的影响。

    GENERATING A RESOURCE MANAGEMENT PLAN FOR AN INFRASTRUCTURE
    9.
    发明申请
    GENERATING A RESOURCE MANAGEMENT PLAN FOR AN INFRASTRUCTURE 审中-公开
    生成基础设施的资源管理计划

    公开(公告)号:US20120109619A1

    公开(公告)日:2012-05-03

    申请号:US12916292

    申请日:2010-10-29

    IPC分类号: G06G7/62

    CPC分类号: G06Q10/06 G06Q10/067

    摘要: In a method for generating a resource management plan for an infrastructure, a resource supply available from a combination of resource sources is determined, an operation of the infrastructure in performing an objective using the determined supply of resources is simulated, in which the simulation is to simulate resource demand of a plurality of infrastructure components in performing the objective, a metric(s) associated with operating the infrastructure based upon the simulation is determined, a determination as to whether the metric(s) satisfies a predetermined goal(s) is made, the resources supplied and/or the simulation of the resource demand of the plurality of infrastructure components is modified in response to the at least one metric failing to satisfy the predetermined goal(s), and a resource management plan for the infrastructure that has been determined to result in the metric(s) satisfying the predetermined goal(s) is generated.

    摘要翻译: 在用于生成基础设施的资源管理计划的方法中,确定从资源的组合可获得的资源供应,模拟使用所确定的资源供应来执行目标的基础设施的运行,其中模拟是 在执行目标时模拟多个基础设施组件的资源需求,确定与基于仿真操作基础设施相关联的度量,确定该度量是否满足预定目标 响应于至少一个不满足预定目标的度量而修改了提供的资源和/或对多个基础设施组件的资源需求的模拟,以及用于已经被用于基础设施的资源管理计划 确定导致满足预定目标的度量。

    MANAGING AN INFRASTRUCTURE
    10.
    发明申请
    MANAGING AN INFRASTRUCTURE 有权
    管理基础设施

    公开(公告)号:US20120109605A1

    公开(公告)日:2012-05-03

    申请号:US12915212

    申请日:2010-10-29

    IPC分类号: G06G7/48

    CPC分类号: G06Q10/0631

    摘要: In a method for managing an infrastructure, a utilization of a plurality of infrastructure components in performing an objective is simulated. In addition, a resource demand for the infrastructure associated with the simulated utilization of the infrastructure components is determined and a supply of resources by a plurality of available sources to meet the determined resource demand is simulated. Moreover, at least one metric associated with the determined resource demand and the simulated supply of resources by the plurality of available sources is determined.

    摘要翻译: 在用于管理基础设施的方法中,模拟多个基础设施组件在执行目标中的利用。 此外,确定与基础设施组件的模拟利用相关联的基础设施的资源需求,并且模拟多个可用源的资源供应以满足确定的资源需求。 此外,确定与确定的资源需求相关联的至少一个度量和由多个可用源的模拟资源供应。