公开(公告)号:US09018782B2
公开(公告)日:2015-04-28
申请号:US13876068
申请日:2011-09-30
申请人: Ian Couchman , Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
发明人: Ian Couchman , Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
CPC分类号: H02P9/02 , F03D7/028 , F03D7/042 , F05B2240/96 , F05B2270/1033 , F05B2270/335 , Y02E10/723
摘要: Wind turbines of a wind power plant may be selectively over-rated by measuring the difference between the nominal and actual power plant outputs and deriving an over-rating request signal based on that difference which is sent to each turbine. The same value may be sent to each turbine. Alternatively, each turbine may be given its own over-rating amount based on an optimization of the turbine. Over-rating may also be used when external economic factors such as energy costs are sufficiently high to out-weigh any potential harmful effect of over-rating. The fatigue lifetime of turbines and their critical components may also be taken into account when deciding whether and to what extent to implement an over-rating command.
摘要翻译: 风力发电厂的风力涡轮机可以通过测量标称电力和实际发电厂输出之间的差异来选择性地过度评估,并且基于发送到每个涡轮机的差异导出过高额定值请求信号。 相同的值可以发送到每个涡轮机。 或者,基于涡轮机的优化,每个涡轮机可以被给予其自己的超额定量。 当外部经济因素如能源成本足够高以超出任何潜在的超额评估有害影响时,也可能会使用过高评级。 在决定是否以及在多大程度上实施过度评估命令时,也可以考虑涡轮机及其关键部件的疲劳寿命。
-
公开(公告)号:US20130257051A1
公开(公告)日:2013-10-03
申请号:US13876430
申请日:2011-09-30
申请人: Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
发明人: Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
IPC分类号: H02P9/00
CPC分类号: F03D7/028 , F03D7/048 , F05B2270/1033 , H02P9/008 , Y02E10/723
摘要: A wind turbine power plant comprises a plurality of wind turbines, each having a rated output and under the control of a power plant controller. The power plant also has a rated output which may be over-rated in response to one or more electricity pricing data, power plant age and operator demand. This may comprise a schedule of output set point changes which effect seasonal or intraday changes in electricity prices or which reflect aging of the power plant. It may also reflect the price of electricity on spot or futures markets. Once the over-rating of the power plant has been set, the output may be increased by over-rating individual turbines or operating turbines at rated power if the sum of the rated outputs of the turbines exceeds or is equal to the new power plant output set point.
摘要翻译: 风力涡轮机发电厂包括多个风力涡轮机,每个风力涡轮机具有额定输出并且在发电厂控制器的控制下。 发电厂还有一个额定输出,可能会响应一个或多个电价定价数据,发电厂年龄和运营商的需求而被高估。 这可能包括产生设定点变化的时间表,其影响电价的季节性或日内变化,或反映电厂的老化。 也可能反映现货或期货市场的电价。 一旦设定了电厂的额定值,如果涡轮机的额定输出的总和超过或等于新的发电厂输出,则可以通过以额定功率对各个涡轮机或运行涡轮机进行过高评估来增加输出。 设定点。
-
公开(公告)号:US09599096B2
公开(公告)日:2017-03-21
申请号:US13876430
申请日:2011-09-30
申请人: Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
发明人: Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
CPC分类号: F03D7/028 , F03D7/048 , F05B2270/1033 , H02P9/008 , Y02E10/723
摘要: A wind turbine power plant comprises a plurality of wind turbines, each having a rated output and under the control of a power plant controller. The power plant also has a rated output which may be over-rated in response to one or more electricity pricing data, power plant age and operator demand. This may comprise a schedule of output set point changes which effect seasonal or intraday changes in electricity prices or which reflect aging of the power plant. It may also reflect the price of electricity on spot or futures markets. Once the over-rating of the power plant has been set, the output may be increased by over-rating individual turbines or operating turbines at rated power if the sum of the rated outputs of the turbines exceeds or is equal to the new power plant output set point.
-
公开(公告)号:US20130270827A1
公开(公告)日:2013-10-17
申请号:US13876068
申请日:2011-09-30
申请人: Ian Couchman , Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
发明人: Ian Couchman , Christopher Spruce , Judith Turner , Martin Evans , Robert Bowyer
IPC分类号: H02P9/02
CPC分类号: H02P9/02 , F03D7/028 , F03D7/042 , F05B2240/96 , F05B2270/1033 , F05B2270/335 , Y02E10/723
摘要: Wind turbines of a wind power plant may be selectively over-rated by measuring the difference between the nominal and actual power plant outputs and deriving an over-rating request signal based on that difference which is sent to each turbine. The same value may be sent to each turbine. Alternatively, each turbine may be given its own over-rating amount based on an optimisation of the turbine. Over-rating may also be used when external economic factors such as energy costs are sufficiently high to out-weigh any potential harmful effect of over-rating. The fatigue lifetime of turbines and their critical components may also be taken into account when deciding whether and to what extent to implement an over-rating command.
摘要翻译: 风力发电厂的风力涡轮机可以通过测量标称电力和实际发电厂输出之间的差异来选择性地过度评估,并且基于发送到每个涡轮机的差异导出过高额定值请求信号。 相同的值可以发送到每个涡轮机。 或者,基于涡轮机的优化,每个涡轮机可以被给予其自己的超额定量。 当外部经济因素如能源成本足够高以超出任何潜在的超额评估有害影响时,也可能会使用过高评级。 在决定是否以及在多大程度上实施过度评估命令时,也可以考虑涡轮机及其关键部件的疲劳寿命。
-
公开(公告)号:US20060130576A1
公开(公告)日:2006-06-22
申请号:US10752272
申请日:2004-01-06
申请人: William Turner , Warren Turner , Judith Turner
发明人: William Turner , Warren Turner , Judith Turner
CPC分类号: G01M1/24
摘要: An improved and simplified balancing machine comprising upright supports devices to hold the workpiece to be balanced, a motor and mount to spin the workpiece, and a system to detect and measure imbalance in the workpiece when it is rotated at speed. Said machine configured to be attached to a machine tool or work table without losing functional integrity, thereby eliminating the need for a massive base. Specific preferred structural embodiments are disclosed.
摘要翻译: 一种改进和简化的平衡机,其包括用于保持待平衡的工件的直立支撑装置,用于旋转工件的电动机和安装件,以及当其以速度旋转时检测和测量工件的不平衡的系统。 所述机器被配置为附接到机床或工作台而不失去功能完整性,从而不需要大量基座。 公开了具体的优选结构实施例。
-
-
-
-