Modular power conversion system
    3.
    发明授权

    公开(公告)号:US10110010B2

    公开(公告)日:2018-10-23

    申请号:US14211339

    申请日:2014-03-14

    摘要: A method for determining when a connection of a power system to a grid has been disconnected. The method includes the power system supplying a first amount of reactive power to the grid to which the power system is connected, and the power system determining if there is a frequency change within the grid. This includes if the frequency change does not exceed a predetermined threshold, the power system supplying a second amount of reactive power to the grid, and if the frequency exceeds a predetermined threshold, the power system supplying a first amount of reactive power to the grid.

    Modular Power Conversion System
    8.
    发明申请

    公开(公告)号:US20210305813A1

    公开(公告)日:2021-09-30

    申请号:US17236783

    申请日:2021-04-21

    IPC分类号: H02J3/18 H02J3/46 H02J3/38

    摘要: A method for determining when a connection of a power system to a grid has been disconnected. The method includes the power system supplying a first amount of reactive power to the grid to which the power system is connected, and the power system determining if there is a frequency change within the grid. This includes if the frequency change does not exceed a predetermined threshold, the power system supplying a second amount of reactive power to the grid, and if the frequency exceeds a predetermined threshold, the power system supplying a first amount of reactive power to the grid.

    Modular Power Conversion System
    10.
    发明申请

    公开(公告)号:US20190052083A1

    公开(公告)日:2019-02-14

    申请号:US16164311

    申请日:2018-10-18

    IPC分类号: H02J3/18 H02J3/46 H02J3/32

    摘要: A method for determining when a connection of a power system to a grid has been disconnected. The method includes the power system supplying a first amount of reactive power to the grid to which the power system is connected, and the power system determining if there is a frequency change within the grid. This includes if the frequency change does not exceed a predetermined threshold, the power system supplying a second amount of reactive power to the grid, and if the frequency exceeds a predetermined threshold, the power system supplying a first amount of reactive power to the grid.