-
公开(公告)号:US08525103B2
公开(公告)日:2013-09-03
申请号:US13033775
申请日:2011-02-24
申请人: David M. Chace , Rafay Z. Ansari , Elton Frost, Jr. , Feyzi Inanc , W. Allen Gilchrist, Jr. , Randy L. Evans
发明人: David M. Chace , Rafay Z. Ansari , Elton Frost, Jr. , Feyzi Inanc , W. Allen Gilchrist, Jr. , Randy L. Evans
IPC分类号: G01V5/10
CPC分类号: G01V5/04
摘要: A method for estimating a property of an earth formation, the method includes: conveying a carrier through a borehole penetrating the earth formation; irradiating the formation with neutrons from a neutron source disposed at the carrier; detecting a first signal from the formation due to the irradiating using a first radiation detector, the first signal being related to a saturation of a fluid in the formation; detecting a second signal from an element in the formation due to the irradiating using a second radiation detector, the second signal being related to an element emitting the second signal in the formation; and estimating the property from the first signal and the second signal.
摘要翻译: 一种用于估计地层的性质的方法,所述方法包括:通过穿过所述地层的钻孔输送载体; 用设置在载体上的中子源用中子照射地层; 由于使用第一辐射检测器的照射,检测来自地层的第一信号,第一信号与地层中的流体饱和有关; 由于使用第二辐射检测器的照射,从地层中的元件检测第二信号,所述第二信号与在地层中发射第二信号的元件有关; 以及从第一信号和第二信号估计特性。
-
公开(公告)号:US20120091329A1
公开(公告)日:2012-04-19
申请号:US13033775
申请日:2011-02-24
申请人: David M. Chace , Rafay Z. Ansari , Elton Frost, JR. , Feyzi Inanc , W. Allen Gilchrist, JR. , Randy L. Evans
发明人: David M. Chace , Rafay Z. Ansari , Elton Frost, JR. , Feyzi Inanc , W. Allen Gilchrist, JR. , Randy L. Evans
IPC分类号: G01V5/10
CPC分类号: G01V5/04
摘要: A method for estimating a property of an earth formation, the method includes: conveying a carrier through a borehole penetrating the earth formation; irradiating the formation with neutrons from a neutron source disposed at the carrier; detecting a first signal from the formation due to the irradiating using a first radiation detector, the first signal being related to a saturation of a fluid in the formation; detecting a second signal from an element in the formation due to the irradiating using a second radiation detector, the second signal being related to an element emitting the second signal in the formation; and estimating the property from the first signal and the second signal.
摘要翻译: 一种用于估计地层的性质的方法,所述方法包括:通过穿过所述地层的钻孔输送载体; 用设置在载体上的中子源用中子照射地层; 由于使用第一辐射检测器的照射,检测来自地层的第一信号,第一信号与地层中的流体饱和有关; 由于使用第二辐射检测器的照射,从地层中的元件检测第二信号,所述第二信号与在地层中发射第二信号的元件有关; 以及从第一信号和第二信号估计特性。
-
公开(公告)号:US08074737B2
公开(公告)日:2011-12-13
申请号:US11841062
申请日:2007-08-20
IPC分类号: E21B43/116 , F42D3/00
CPC分类号: E21B43/1185 , E21B43/11852 , E21B47/12
摘要: A perforating system and method for wellbore perforating. The system comprises a perforating string having a perforating gun with shaped charges, a communication module for receiving detonation signals, and a controller associated with each perforating gun. The module receives surface signals for gun detonation and wirelessly transmits the signals to selected guns via the associated controllers.
摘要翻译: 用于井眼穿孔的穿孔系统和方法。 该系统包括具有成形电荷的穿孔枪的穿孔线,用于接收爆震信号的通信模块和与每个射孔枪相关联的控制器。 该模块接收喷枪爆震的表面信号,并通过相关的控制器将信号无线传输到选定的枪。
-
公开(公告)号:US20090050322A1
公开(公告)日:2009-02-26
申请号:US11841062
申请日:2007-08-20
IPC分类号: E21B43/116 , E21B43/11
CPC分类号: E21B43/1185 , E21B43/11852 , E21B47/12
摘要: A perforating system and method for wellbore perforating. The system comprises a perforating string having a perforating gun with shaped charges, a communication module for receiving detonation signals, and a controller associated with each perforating gun. The module receives surface signals for gun detonation and wirelessly transmits the signals to selected guns via the associated controllers.
摘要翻译: 用于井眼穿孔的穿孔系统和方法。 该系统包括具有成形电荷的穿孔枪的穿孔线,用于接收爆震信号的通信模块和与每个射孔枪相关联的控制器。 该模块接收喷枪爆震的表面信号,并通过相关的控制器将信号无线传输到选定的枪。
-
公开(公告)号:US20100276144A1
公开(公告)日:2010-11-04
申请号:US12773675
申请日:2010-05-04
申请人: Avigdor Hetz , Randy L. Evans
发明人: Avigdor Hetz , Randy L. Evans
IPC分类号: E21B43/11
CPC分类号: E21B43/116
摘要: A perforating system having a perforating gun with a gun body formed from a ductile material. The gun body deforms under pressure while maintaining sufficient structural integrity to remain intact, and without rupturing or leaking. A flowable material can be inserted within the gun body that provides additional support to the gun body.
摘要翻译: 一种具有穿孔枪的射孔系统,其具有由延性材料形成的枪体。 枪体在压力下变形,同时保持足够的结构完整性以保持完整,并且不破裂或泄漏。 可流动的材料可以插入枪体内,为枪体提供额外的支撑。
-
公开(公告)号:US07757767B2
公开(公告)日:2010-07-20
申请号:US12043542
申请日:2008-03-06
申请人: Freeman L. Hill , Randy L. Evans , Mark L. Sloan
发明人: Freeman L. Hill , Randy L. Evans , Mark L. Sloan
IPC分类号: E21B23/00
CPC分类号: E21B43/119 , E21B23/01
摘要: A lock for a perforating gun system comprising, a housing, a cylinder formed in the housing, a piston assembly disposed within the cylinder, and anchoring arms coupled with the piston assembly. Detonation of the shaped charges of an associated perforating gun produces a pressure surge which is communicated to a surface of the piston assembly. Appropriate movement of the piston assembly outwardly rotates the anchoring arms into anchoring engagement with an associated tubular. Thus the pressure from the detonation event will anchor a perforating system within its associated tubular.
摘要翻译: 一种用于射孔枪系统的锁,包括壳体,形成在壳体中的气缸,设置在气缸内的活塞组件以及与活塞组件联接的锚定臂。 相关联的射孔枪的成形电荷的爆震产生压力浪涌,其被传递到活塞组件的表面。 活塞组件的适当运动将锚定臂向外转动成与相关联的管状物的固定接合。 因此,来自引爆事件的压力将将穿孔系统锚定在其相关管状体内。
-
7.
公开(公告)号:US08286697B2
公开(公告)日:2012-10-16
申请号:US12773664
申请日:2010-05-04
IPC分类号: E21B43/117
CPC分类号: E21B43/117 , E21B43/11 , E21B43/119
摘要: A perforating system having a perforating gun with a high pressure gun body. The gun body can be thickened so that no empty space is present between it and a corresponding gun tube. Alternatively, the gun body could be a solid cylinder with slots radially formed therein to receive a shaped charge. In another embodiment, a flowable material, such as foam, fluid, sand, ceramic beads, eutectic metal, and combinations thereof, is provided in the space between the gun body and gun tube.
摘要翻译: 一种穿孔系统,其具有带有高压枪体的穿孔枪。 枪体可以加厚,使得它与相应的枪管之间不存在空的空间。 或者,枪体可以是其中径向形成有槽的实心圆柱体,以接收成形的电荷。 在另一个实施例中,在枪身和枪管之间的空间中设置有可流动的材料,例如泡沫,流体,砂,陶瓷珠,共晶金属及其组合。
-
公开(公告)号:US20090090507A1
公开(公告)日:2009-04-09
申请号:US11867502
申请日:2007-10-04
IPC分类号: E21B43/04
摘要: A modular wellbore treatment system having a reservoir for holding wellbore/reservoir treatment material, a pump for pressurizing and delivering the wellbore/reservoir treatment fluid, and a sealing section for creating a localized pressurized zone proximate to a region of a formation to be treated. The wellbore treatment fluid includes permeability modifiers, gel, acids, stimulation fluids, epoxy type substances, void fillers, gravel pack fixing compounds, brine, reactive fluids to water, oil, and gas, and alcohol.
摘要翻译: 具有用于保持井眼/储层处理材料的储存器的模块化井筒处理系统,用于加压和输送井筒/储存器处理流体的泵以及用于在靠近待处理地层的区域产生局部加压区域的密封段。 井眼处理流体包括渗透性改进剂,凝胶,酸,刺激流体,环氧类物质,空隙填料,砾石填充物固定化合物,盐水,对水,油和气体的反应性流体和醇。
-
公开(公告)号:US08127846B2
公开(公告)日:2012-03-06
申请号:US12394598
申请日:2009-02-27
申请人: Freeman L. Hill , Randy L. Evans , John H. Clark , Mark L. Sloan , William D. Myers, Jr. , Joseph Gregory Barolak , George Patton
发明人: Freeman L. Hill , Randy L. Evans , John H. Clark , Mark L. Sloan , William D. Myers, Jr. , Joseph Gregory Barolak , George Patton
IPC分类号: E21B33/10
摘要: A method and system for cementing and perforating a wellbore in a single step by coupling a perforating gun with a wiper plug. The method includes injecting cement in a wellbore having casing therein and an annulus between the casing and wellbore. A wiper plug is dropped on the cement having a perforating gun attached to the wiper plug. The plug is forced downward pulling the perforating gun along. The downward motion of the plug in turn pushes the cement out the bottom end of the casing and into the annulus. The cement in the annulus is allowed to set and the perforating gun is activated.
摘要翻译: 一种通过将穿孔枪与雨刷连接起来,在一个步骤中固井和穿孔井的方法和系统。 该方法包括在具有壳体的井眼中注入水泥,并且在壳体和井眼之间注入环状物。 刮水器塞子掉落在具有连接到雨刷塞上的穿孔枪的水泥上。 插头被迫向下拉动穿孔枪。 插头的向下运动反过来将水泥推出壳体的底端并进入环形空间。 允许环形中的水泥固化,并且穿孔枪被激活。
-
公开(公告)号:US20120048539A1
公开(公告)日:2012-03-01
申请号:US13215379
申请日:2011-08-23
IPC分类号: E21B47/06
CPC分类号: E21B47/06
摘要: A method of completing a wellbore that includes providing wellbore casing having shaped charges and permanent pressure gauges on an outer surface of the casing. In an example of use, the casing is inserted into the wellbore and cement is injected into an annulus formed between the casing and wellbore. The shaped charges are strategically deployed on the casing so they aim towards a wall of the wellbore and are spaced apart along the casing. Thus detonating the shaped charges creates perforations into a formation around the wellbore and places the pressure gauges into pressure communication with the formation. Pressure readings are delivered to the surface from the pressure gauges in the form of signals.
摘要翻译: 一种完成井筒的方法,其包括在壳体的外表面上提供具有成形装料和永久压力计的井眼套管。 在使用的示例中,将壳体插入井眼中,并且将水泥注入形成在壳体和井筒之间的环形空间中。 成形的装料战略性地部署在壳体上,因此它们朝向井眼的壁并且沿着壳体间隔开。 因此引爆成形的电荷会在井筒周围的地层中产生穿孔,并将压力表与地层压力连通。 压力读数以信号的形式从压力表输送到表面。
-
-
-
-
-
-
-
-
-