-
公开(公告)号:US20200227938A1
公开(公告)日:2020-07-16
申请号:US16744601
申请日:2020-01-16
发明人: Brendan Pancheri , Greg Wischstadt , Robert lles , Andy Phillips , Taesik Yu , Sungmin Lee
摘要: A load shed module configured to be connected in series between a power supply and a load is disclosed. A separate load shed module is connected in series between each load and the power supply. The load shed module determines the frequency of the voltage supplied from the power supply. Based on the frequency, the load shed module determines if utility power is connected or if a generator is connected. If the generator is connected and the frequency of the voltage goes outside of a desired operating range for a preset time, the load shed module disconnects the load from the power supply. Each load shed module includes a priority setting and reconnects its corresponding load after a predetermined time corresponding to the priority setting.
-
公开(公告)号:US20160204651A1
公开(公告)日:2016-07-14
申请号:US14593058
申请日:2015-01-09
发明人: Brendan Pancheri , Greg Wischstadt , Robert lles , Andy Phillips , Taesik Yu , Sungmin Lee
CPC分类号: H02J9/061 , G01R11/04 , G01R11/06 , H02J3/14 , H02J2003/143 , Y02B70/3225 , Y02B70/3291 , Y04S20/222 , Y04S20/248
摘要: A load shed module configured to be connected in series between a power supply and a load is disclosed. A separate load shed module is connected in series between each load and the power supply. The load shed module determines the frequency of the voltage supplied from the power supply. Based on the frequency, the load shed module determines if utility power is connected or if a generator is connected. If the generator is connected and the frequency of the voltage goes outside of a desired operating range for a preset time, the load shed module disconnects the load from the power supply. Each load shed module includes a priority setting and reconnects its corresponding load after a predetermined time corresponding to the priority setting.
摘要翻译: 公开了一种被配置为在电源和负载之间串联连接的负载棚模块。 每个负载和电源之间串联连接一个独立的负载棚模块。 负载棚模块确定从电源供应的电压的频率。 根据频率,负载棚模块确定公用电源是连接还是连接发电机。 如果发电机连接并且电压的频率在预定时间内超出所需的工作范围,则负载脱落模块将负载从电源断开。 每个负载棚模块包括优先级设置,并且在与优先级设置相对应的预定时间之后重新连接其对应的负载。
-