-
公开(公告)号:US11536864B1
公开(公告)日:2022-12-27
申请号:US17855697
申请日:2022-06-30
Inventor: Yu Zou , Songfeng Guo , Shengwen Qi , Xiaolin Huang , Bowen Zheng
Abstract: A method for establishing a geostress field distribution of slopes in canyon areas includes: obtaining a persistence ratio of a fracture surface based on a structural plane trace length and a rock bridge length of the fracture surface, and then obtaining a fracture stage of a crack according to progressive failure characteristics of rock mass, combining a character of the fracture surface to obtain magnitude and direction of a maximum principal stress, and establishing the geostress field distribution. The method is simple to operate, does not need to carry out geostress testing, does not need a large amount of manpower and material resources, does not need redundant fund investment, and can simply and effectively obtain geostress field data. Moreover, combining with the geostress field inversion technology, a large-scale geostress field distribution condition can be obtained, which can provide a basis for engineering site selection and engineering rock mass stability determination.
-
公开(公告)号:US11268383B2
公开(公告)日:2022-03-08
申请号:US17167363
申请日:2021-02-04
Inventor: Songfeng Guo , Shengwen Qi , Shishu Zhang , Xingdong Ma , Guoqing Yuan , Xiuhua Wang , Bowen Zheng , Yu Zou , Xiaolin Huang , Ning Liang , Hang Li , Yubo Liu , Jianxian He , Xianglong Yao , Daping Tai , Guangming Luo
IPC: E21D21/00
Abstract: The present invention discloses a type of energy-absorbing rock bolt device with umbrella-shaped structure, which consists of a body of bolt, and one end of the said body of bolt is equipped with a preloaded system, as well as the other end of the said body of bolt is equipped with the first support system, in addition, the said body of bolt is equipped with several second support systems, and the said second support system is located between the said preloaded system and the said first support system; meanwhile, the said second support system consists of the first umbrella-shaped support system and the second umbrella support system.
-
公开(公告)号:US20220010681A1
公开(公告)日:2022-01-13
申请号:US17167363
申请日:2021-02-04
Inventor: Songfeng Guo , Shengwen Qi , Shishu Zhang , Xingdong Ma , Guoqing Yuan , Xiuhua Wang , Bowen Zheng , Yu Zou , Xiaolin Huang , Ning Liang , Hang Li , Yubo Liu , Jianxian He , Xianglong Yao , Daping Tai , Guangming Luo
IPC: E21D21/00
Abstract: The present invention discloses a type of energy-absorbing rock bolt device with umbrella-shaped structure, which consists of a body of bolt, and one end of the said body of bolt is equipped with a preloaded system, as well as the other end of the said body of bolt is equipped with the first support system, in addition, the said body of bolt is equipped with several second support systems, and the said second support system is located between the said preloaded system and the said first support system; meanwhile, the said second support system consists of the first umbrella-shaped support system and the second umbrella support system.
-
4.
公开(公告)号:US11215543B1
公开(公告)日:2022-01-04
申请号:US17361332
申请日:2021-06-29
Inventor: Shengwen Qi , Bowen Zheng , Xiaolin Huang , Songfeng Guo , Ning Liang , Yu Zou , Guangming Luo , Luqing Zhang , Haijun Zhao , Lei Xue , Zhiqing Li , Jie Guo , Libo Jiang , Xin Wang
IPC: G01N3/24 , G01N3/06 , G01N23/046 , G01N23/06 , G01N33/24
Abstract: A rock mass shear test system for high-energy accelerator computed tomography (CT) scanning includes double horizontal loading devices, a first bearing device for bearing a static shear box, a second bearing device for bearing a dynamic shear box, and a normal loading device, etc. In the test, the double horizontal loading devices simultaneously apply an identical loading force to the rock mass, and the normal loading device applies a shear force to the rock mass. The double horizontal loading devices are provided in parallel and spaced apart, a loading force is applied in the horizontal direction, and a shear force is applied in the vertical direction, so that the loading cylinder and the rock mass sample are effectively prevented from interfering with each other during the accurate scanning process of the shearing progressive failure process of the rock mass.
-
公开(公告)号:US11085859B1
公开(公告)日:2021-08-10
申请号:US17226116
申请日:2021-04-09
Inventor: Yu Zou , Guangming Luo , Bowen Zheng , Shengwen Qi , Hui Zhou , Manchao He
Abstract: An experimental system for simulating the effect of a fault stick-slip displacement on a tunnel engineering includes a model box system and a stick-slip loading system. The model box system is configured to simulate an interaction between two walls of a fault. The stick-slip loading system includes a first loading assembly, a second loading assembly and a bearing assembly. The first loading assembly includes a first loading device, and a first sample frame configured to place a main loading rock mass sample. The bearing assembly is arranged on two sides of the first sample frame. Sub-loading rock mass samples borne by the bearing assembly are configured to abut against the main loading rock mass sample under the action of the second loading assembly. A method for simulating the effect of a fault stick-slip displacement on a tunnel engineering based on the above system is further provided.
-
公开(公告)号:US11598210B1
公开(公告)日:2023-03-07
申请号:US17889407
申请日:2022-08-17
Inventor: Bowen Zheng , Shengwen Qi , Yongshuang Zhang , Songfeng Guo , Manchao He , Hui Zhou
IPC: E21D11/05
Abstract: Disclosed is a tunnel protection structure suitable for active fault areas and high ground stress areas, and relates to the technical field of tunnel engineering construction. The tunnel protection structure comprises at least one protection unit, wherein a plurality of protection units are sequentially connected and distributed along the axial direction of a tunnel, and the protection units comprise a radial protection ring and two axial protection rings which are fixedly arranged between a lining structure and surrounding rock and are distributed along the axial direction of the tunnel; the radial protection ring comprises a plurality of radial buffer energy consumption layers which are sequentially sleeved along the radial direction of the tunnel; and the axial protection ring comprises a plurality of axial buffer energy consumption layers which are sequentially and fixedly connected along the axial direction of the tunnel.
-
公开(公告)号:US11371921B1
公开(公告)日:2022-06-28
申请号:US17533876
申请日:2021-11-23
Inventor: Bowen Zheng , Shengwen Qi , Songfeng Guo , Xiaolin Huang , Ning Liang , Guangming Luo , Yu Zou , Shuaihua Song , Zhendong Cui , Lei Xue , Guoliang Li , Tianming Huang , Yiman Li , Yanhui Dong , Liheng Wang , Guiyang Ren , Qingze Hao , Libo Jiang , Xin Wang , Wenjiao Xiao
Abstract: A clamp and a shear test device are provided, and relate to the technical field of rock mass mechanics tests. The clamp comprises a box body, wherein an opening is formed in one side of the box body, two clamping structures are oppositely arranged in the box body, a sample is arranged between the two clamping structures, each clamping structure comprises an adjusting mechanism, and a distance between the two clamping structures is adjusted through adjusting mechanisms of the two clamping structures. According to the clamp, real-time dynamic adjustment is conveniently and rapidly achieved, the stability of sample clamping is ensured, and therefore the requirement that the shear load can be truly and effectively transmitted to the sample through the box body is met.
-
8.
公开(公告)号:US12216239B1
公开(公告)日:2025-02-04
申请号:US18764288
申请日:2024-07-04
Inventor: Xueliang Wang , Mengmeng Ban , Mengjie Zhang , Shengwen Qi , Lihui Li , Bowen Zheng
IPC: G01V20/00
Abstract: Disclosed is a mapping method of landslide threat range based on equivalent friction coefficient and trend analysis, which includes the following steps: obtaining physical parameters of a landslide, and obtaining a volume of the landslide according to an area in the physical parameters; selecting relevant parameters based on a rock type in the physical parameters, and obtaining the equivalent friction coefficient according to the relevant parameters and the volume; obtaining a landslide runout distance according to the equivalent friction coefficient, determining coordinate points of a hyperbola and a front edge boundary range according to the landslide runout distance, and performing a hyperbolic fitting on two side boundaries of the landslide according to the coordinate points to obtain a side boundary range; generating the landslide threat range based on the front edge boundary range and the side boundary range.
-
9.
公开(公告)号:US12117370B1
公开(公告)日:2024-10-15
申请号:US18739342
申请日:2024-06-11
Inventor: Yu Zou , Chunling Liu , Guangming Luo , Shengwen Qi , Songfeng Guo , Bowen Zheng , Yongchao Li
CPC classification number: G01M5/00 , G01N3/08 , G01N2203/0246
Abstract: A physical simulation test system for studying a tunnel structure under active fault movements includes: a simulation box, a loading frame, a first loading mechanism, a second loading mechanism and a third loading mechanism. The simulation box is a hollow and open box structure including a first box and a second box that can slide relative to each other. The loading frame includes a crossbeam, a first bracket, a second bracket, and a third bracket. The simulation box is located below the crossbeam, between the first bracket and the second bracket, and in front of the third bracket. The first loading mechanism is disposed on the first bracket, the second loading mechanism is located below the first box, and the third loading mechanism is disposed on the third bracket. The three loading mechanisms are configured to provide loading forces in three different directions to the first box.
-
公开(公告)号:US11655595B1
公开(公告)日:2023-05-23
申请号:US17894346
申请日:2022-08-24
Inventor: Songfeng Guo , Shengwen Qi , Manchao He , Hui Zhou , Yu Zou , Zhiqing Li , Lihui Li , Bowen Zheng , Jinxuan Li , Guangming Luo , Fengjiao Tang , Weiluan Wen
IPC: E01B9/66
CPC classification number: E01B9/66
Abstract: An adjustable device for railway to cross active faults is provided to fix a rail and a sleeper, including: a fastener mounting base, disposed between the rail and sleeper; clamping pipes, disposed between the fastener mounting base and the sleeper, the sleeper is provided with a through groove, and the clamping pipes are detachably fixed inside the through groove; control parts, disposed on an inner wall of the clamping pipes, each of the control parts is configured to detect lateral pressures between the fastener mounting base and corresponding one of the clamping pipes, thereby to separate the corresponding one of the clamping pipes from the through groove, the device ensures that the rail will not produce bending deformations after the lateral dislocation of the bottom layer during earthquake events, and ensure that a train or rail repair vehicle can pass at a low speed after earthquake.
-
-
-
-
-
-
-
-
-