公开(公告)号:US20240015080A1
公开(公告)日:2024-01-11
申请号:US18037964
申请日:2020-12-21
Applicant: Intel Corporation
Inventor: Rameshkumar Illikkal , Anna Drewek-Ossowicka , Dharmisha Doshi , Qian Li , Andrzej Kuriata , Andrew J. Herdrich , Teck Joo Goh , Daniel Richins , Slawomir Putyrski , Wenhui Shu , Long Cui , Jinshi Chen , Mihal Daniel Dodan
IPC: H04L41/5019 , G06F9/50
CPC classification number: H04L41/5019 , G06F9/5011
Abstract: Various approaches to efficiently allocating and utilizing hardware resources in data centers while maintaining compliance with a service level objective (SLO) specified for a computational workload is translated into a hardware-level SLO to facilitate direct enforcement by the hardware processor, e.g., using a feedback control loop or model-based mapping of the hardware-level SLO to allocations of microarchitecture resources of the processor. In some embodiments, a computational model of the hardware behavior under resource contention is used to predict the application performance (e.g., as measured in terms of the hardware-level SLO) to be expected under certain contention scenarios. Scheduling of workloads among the compute nodes within the data center may be based on such predictions. In further embodiments, configurations of microservices are optimized to minimize hardware resources while meeting a specified performance goal.
-
公开(公告)号:US11320884B2
公开(公告)日:2022-05-03
申请号:US16967091
申请日:2018-07-20
Applicant: INTEL CORPORATION
Inventor: Xiaoguo Liang , Haifeng Gong , Wenhui Shu , Chuan Song , Xiang Zhou
IPC: G06F1/30 , G06F1/3206 , H04J3/16
Abstract: In some examples, a control unit is configured to control a computer server rack having a first grid power source, a second grid power source, and a battery backup system. The control unit is adapted to monitor a failed status of one or more power supply units in the computer server rack, to determine location information relating to the one or more power supply units having the failed status, to determine input power of the one or more power supply units having the failed status, to adjust an input power of the first grid power source based on the determined input power, and to adjust an input power of the second grid power source based on the determined input power.
-
公开(公告)号:US20210208863A1
公开(公告)日:2021-07-08
申请号:US17133015
申请日:2020-12-23
Applicant: Intel Corporation
Inventor: Andrzej Kuriata , Mihai-Daniel Dodan , Wenhui Shu , Long Cui , Jinshi Chen , Rameshkumar Illikkal , Teck Joo Goh
Abstract: Methods, apparatus, systems, and articles of manufacture for loading of a container image are disclosed. An example apparatus includes a prioritizer to determine a priority level at which a container is to be executed. A container controller is to determine a first expected location for a first set of layers of the container, the container controller to determine a second expected location for a second set of layers of the container, the first expected location and the second expected location determined based on the determined priority level, the second set of layers separated from the first set of layers in an image by a landmark. A container loader is to mount the first set of layers from the first expected location. A container executor is to initiate execution of the container based on the mounted first set of layers.
-
公开(公告)号:US12231304B2
公开(公告)日:2025-02-18
申请号:US18037964
申请日:2020-12-21
Applicant: Intel Corporation
Inventor: Rameshkumar Illikkal , Anna Drewek-Ossowicka , Dharmisha Ketankumar Doshi , Qian Li , Andrzej Kuriata , Andrew J. Herdrich , Teck Joo Goh , Daniel Richins , Slawomir Putyrski , Wenhui Shu , Long Cui , Jinshi Chen , Mihai Daniel Dodan
IPC: H04L41/5019 , G06F9/50
Abstract: Various approaches to efficiently allocating and utilizing hardware resources in data centers while maintaining compliance with a service level objective (SLO) specified for a computational workload is translated into a hardware-level SLO to facilitate direct enforcement by the hardware processor, e.g., using a feedback control loop or model-based mapping of the hardware-level SLO to allocations of microarchitecture resources of the processor. In some embodiments, a computational model of the hardware behavior under resource contention is used to predict the application performance (e.g., as measured in terms of the hardware-level SLO) to be expected under certain contention scenarios. Scheduling of workloads among the compute nodes within the data center may be based on such predictions. In further embodiments, configurations of microservices are optimized to minimize hardware resources while meeting a specified performance goal.
-
公开(公告)号:US11726910B2
公开(公告)日:2023-08-15
申请号:US16816779
申请日:2020-03-12
Applicant: Intel Corporation
Inventor: Ian M. Steiner , Andrew J. Herdrich , Wenhui Shu , Ripan Das , Dianjun Sun , Nikhil Gupta , Shruthi Venugopal
CPC classification number: G06F12/0646 , G06F11/3037 , G06F11/3495 , G06F2212/1044
Abstract: Examples include a computing system for receiving memory class of service parameters; setting performance monitoring configuration parameters, based at least in part on the memory class of service parameters, for use by a performance monitor of a memory controller to generate performance monitoring statistics by monitoring performance of one or more workloads by a plurality of processor cores based at least in part on the performance monitoring configuration parameters; receiving the performance monitoring statistics from the performance monitor; and generating, based at least in part on the performance monitoring statistics, a plurality of memory bandwidth settings to be applied by a memory bandwidth allocator to the plurality of processor cores to dynamically adjust priorities of memory bandwidth allocated for the one or more workloads to be processed by the plurality of processor cores.
-
公开(公告)号:US20210068292A1
公开(公告)日:2021-03-04
申请号:US16967091
申请日:2018-07-20
Applicant: INTEL CORPORATION
Inventor: Xiaoguo Liang , Haifeng Gong , Wenhui Shu , Chuan Song , Xiang Zhou
IPC: H05K7/14 , H05K7/20 , G06F1/3206
Abstract: In some examples, a control unit is configured to control a computer server rack having a first grid power source, a second grid power source, and a battery backup system. The control unit is adapted to monitor a failed status of one or more power supply units in the computer server rack, to determine location information relating to the one or more power supply units having the failed status, to determine input power of the one or more power supply units having the failed status, to adjust an input power of the first grid power source based on the determined input power, and to adjust an input power of the second grid power source based on the determined input power.
-
-
-
-
-