-
公开(公告)号:US12159322B2
公开(公告)日:2024-12-03
申请号:US17758024
申请日:2020-12-25
Applicant: KYOCERA CORPORATION
Inventor: Kazuhide Toda , Yasuhiro Nakamura , Yusuke Kishina , Noriyasu Kawakita , Takashi Inoue , Tomoya Shimomura , Kenji Ikeuchi , Hiroshi Yoshida
IPC: G06Q50/06 , G06F1/3206 , G06F9/50 , G06Q10/063 , H02J3/00 , H02J3/38
Abstract: A power management system including a management apparatus configured to assign divided computation processing constituting at least a part of predetermined computation processing to a distributed computing device placed in a facility, wherein the management apparatus includes a receiver configured to receive a message including an information element indicating a type of corresponding computation processing that the distributed computing device is capable of handling, and a controller configured to perform assignment processing to assign the divided computation processing to the distributed computing device based on the type of the corresponding computation processing.
-
公开(公告)号:US20140261643A1
公开(公告)日:2014-09-18
申请号:US14353757
申请日:2012-10-24
Applicant: KYOCERA Corporation
Inventor: Takahiro Kitano , Kazuhide Toda
IPC: H01L31/042
CPC classification number: H02S20/23 , F24S25/20 , F24S25/33 , F24S25/67 , F24S2080/09 , H02S30/10 , Y02B10/12 , Y02E10/47
Abstract: A solar cell module includes a solar cell panel with first and second surfaces includes first and second side portions at different side surfaces, a first holding member which holds the first side portion, a second holding member which holds the second side portion and an elongated reinforcement member disposed on a second surface side. At least one of the first and second holding member includes a first extension portion which protrudes in a direction from the first surface to the second surface, and a second extension portion bent in an inner direction along the second surface and provided with a notch portion. A first end portion of one end of the reinforcement member is inserted into the notch portion, and a second end portion of the one end located closer to the solar cell panel than the first end portion is fixed to the first extension portion.
Abstract translation: 太阳能电池模块包括具有第一和第二表面的太阳能电池板,其包括在不同侧表面处的第一和第二侧部,保持第一侧部的第一保持构件,保持第二侧部的第二保持构件和细长加强件 构件设置在第二表面侧。 第一保持构件和第二保持构件中的至少一个包括沿从第一表面到第二表面的方向突出的第一延伸部分和沿着第二表面沿内部方向弯曲并设置有切口部分的第二延伸部分。 加强构件的一端的第一端部插入到切口部分中,并且位于比第一端部更靠近太阳能电池板的一端的第二端部固定到第一延伸部。
-
公开(公告)号:US12230960B2
公开(公告)日:2025-02-18
申请号:US17758025
申请日:2020-12-25
Applicant: KYOCERA CORPORATION
Inventor: Kazuhide Toda , Yasuhiro Nakamura , Yusuke Kishina , Noriyasu Kawakita , Takashi Inoue , Tomoya Shimomura , Kenji Ikeuchi , Hiroshi Yoshida
IPC: H02J13/00 , G05B19/042
Abstract: A power management system including a management apparatus configured to assign divided computation processing constituting at least a part of predetermined computation processing to a distributed computing device placed in a facility, wherein the management apparatus includes a receiver configured to receive a message including an information element indicating executability of computation processing by the distributed computing device, and a controller configured to perform assignment processing configured to assign the divided computation processing to the distributed computing device based on the executability of the computation processing.
-
公开(公告)号:US12149088B2
公开(公告)日:2024-11-19
申请号:US17758022
申请日:2020-12-25
Applicant: KYOCERA CORPORATION
Inventor: Kazuhide Toda , Yasuhiro Nakamura , Yusuke Kishina , Noriyasu Kawakita , Takashi Inoue , Tomoya Shimomura , Kenji Ikeuchi , Hiroshi Yoshida
Abstract: A power management system including a management apparatus configured to assign divided computation processing constituting at least a part of predetermined computation processing to a distributed computing device placed in a facility, wherein the management apparatus includes a controller configured to perform assignment processing configured to assign the divided computation processing to the distributed computing device based on at least one of a prediction value of an output power of a distributed power supply placed in the facility, a prediction value of power consumption of the facility, and a prediction value of a surplus power of the facility.
-
-
-