-
公开(公告)号:US20070107684A1
公开(公告)日:2007-05-17
申请号:US11599396
申请日:2006-11-15
申请人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaoko , Jun Yamada
发明人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaoko , Jun Yamada
IPC分类号: F01L1/34
CPC分类号: F01L1/3442 , F01L1/022 , F01L2001/34426 , F01L2001/34469
摘要: A valve timing adjusting apparatus has a housing and a vane rotor to form multiple fluid chambers, and a relative position of the vane rotor to the housing is adjusted by the fluid pressure supplied into the fluid chambers. A check valve is provided in a branched passage portion, so that working fluid may not be pushed out from an advancing fluid chamber to a low pressure side, even when the working fluid in the advancing fluid chamber is temporally compressed to increase its fluid pressure due to a torque change applied from a cam shaft to the vane rotor.
-
公开(公告)号:US07931000B2
公开(公告)日:2011-04-26
申请号:US11783002
申请日:2007-04-05
申请人: Masayasu Ushida , Kinya Takahashi , Takao Nojiri , Seiji Yaoko , Jun Yamada
发明人: Masayasu Ushida , Kinya Takahashi , Takao Nojiri , Seiji Yaoko , Jun Yamada
IPC分类号: F01L1/34
CPC分类号: F01L1/3442 , F01L2001/3443 , F01L2001/34453 , F01L2001/34469
摘要: A first one-way valve is provided in a first advance passage connecting a hydraulic pump to a control advance chamber. A second one-way valve is provided in a first retard passage connecting the hydraulic pump to a control retard chamber. A first control valve is provided in a second advance passage to bypass the first one-way valve for communication of the first advance passage. A second control valve is provided in a second retard passage to bypass the second one-way valve for communication of the first retard passage. The first control valve operates by the pilot pressure to close the second advance passage at advance controlling and opening it at retard controlling. The second control valve operates by the pilot pressure to close the second retard passage at retard controlling and open it at advance controlling.
摘要翻译: 第一单向阀设置在将液压泵连接到控制前进室的第一前进通道中。 在将液压泵连接到控制延迟室的第一延迟通道中设置有第二单向阀。 第一控制阀设置在第二前进通道中以绕过用于第一前进通道的连通的第一单向阀。 第二控制阀设置在第二延迟通道中以绕过用于第一延迟通道的连通的第二单向阀。 第一控制阀通过先导压力操作,以预先控制并打开延迟控制来关闭第二前进通道。 第二控制阀通过先导压力操作,以在延迟控制下关闭第二延迟通道,并且在预先控制下打开它。
-
公开(公告)号:US20100251980A1
公开(公告)日:2010-10-07
申请号:US11783002
申请日:2007-04-05
申请人: Masayasu Ushida , Kinya Takahashi , Takao Nojiri , Seiji Yaoko , Jun Yamada
发明人: Masayasu Ushida , Kinya Takahashi , Takao Nojiri , Seiji Yaoko , Jun Yamada
CPC分类号: F01L1/3442 , F01L2001/3443 , F01L2001/34453 , F01L2001/34469
摘要: A first one-way valve is provided in a first advance passage connecting a hydraulic pump to a control advance chamber. A second one-way valve is provided in a first retard passage connecting the hydraulic pump to a control retard chamber. A first control valve is provided in a second advance passage to bypass the first one-way valve for communication of the first advance passage. A second control valve is provided in a second retard passage to bypass the second one-way valve for communication of the first retard passage. The first control valve operates by the pilot pressure to close the second advance passage at advance controlling and opening it at retard controlling. The second control valve operates by the pilot pressure to close the second retard passage at retard controlling and open it at advance controlling.
摘要翻译: 第一单向阀设置在将液压泵连接到控制前进室的第一前进通道中。 在将液压泵连接到控制延迟室的第一延迟通道中设置有第二单向阀。 第一控制阀设置在第二前进通道中以绕过用于第一前进通道的连通的第一单向阀。 第二控制阀设置在第二延迟通道中以绕过用于第一延迟通道的连通的第二单向阀。 第一控制阀通过先导压力操作,以预先控制并打开延迟控制来关闭第二前进通道。 第二控制阀通过先导压力操作,以在延迟控制下关闭第二延迟通道,并且在预先控制下打开它。
-
公开(公告)号:US07290510B2
公开(公告)日:2007-11-06
申请号:US11599396
申请日:2006-11-15
申请人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaoko , Jun Yamada
发明人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaoko , Jun Yamada
IPC分类号: F01L1/34
CPC分类号: F01L1/3442 , F01L1/022 , F01L2001/34426 , F01L2001/34469
摘要: A valve timing adjusting apparatus has a housing and a vane rotor to form multiple fluid chambers, and a relative position of the vane rotor to the housing is adjusted by the fluid pressure supplied into the fluid chambers. A check valve is provided in a branched passage portion, so that working fluid may not be pushed out from an advancing fluid chamber to a low pressure side, even when the working fluid in the advancing fluid chamber is temporally compressed to increase its fluid pressure due to a torque change applied from a cam shaft to the vane rotor.
摘要翻译: 气门正时调节装置具有壳体和叶片转子以形成多个流体室,并且通过供应到流体室中的流体压力来调节叶片转子与壳体的相对位置。 止回阀设置在分支通道部分中,使得即使在前进流体室中的工作流体被时间压缩以增加其流体压力时,工作流体也可能不会从前进流体室被推出到低压侧 到从凸轮轴施加到叶片转子的扭矩变化。
-
公开(公告)号:US07182052B2
公开(公告)日:2007-02-27
申请号:US11165311
申请日:2005-06-24
申请人: Seiji Yaoko , Jun Yamada , Kinya Takahashi , Masayasu Ushida , Mitomu Mohri , Takao Nojiri
发明人: Seiji Yaoko , Jun Yamada , Kinya Takahashi , Masayasu Ushida , Mitomu Mohri , Takao Nojiri
IPC分类号: F01L1/34
CPC分类号: F01L1/3442 , F01L2001/34426 , F01L2001/34456 , F01L2001/34469 , F01L2001/34479
摘要: A shoe housing receives a driving force from a crankshaft and a vane rotor rotates with a camshaft in combination. The vane rotor is received in the shoe housing in such a way as to freely turn. Each of the vanes of the vane rotor partitions each of three receiving chambers into a retard hydraulic chamber and an advance hydraulic chamber. A check valve is disposed in an advance supply passage. The check valve allows a working oil to flow from an oil pump through the advance supply passage to the advance hydraulic chamber and prohibits the working oil from flowing back from the advance hydraulic chamber through the advance supply passage to a drain.
摘要翻译: 靴壳承受来自曲轴的驱动力,叶片转子与凸轮轴组合地旋转。 叶片转子以可自由转动的方式容纳在鞋壳中。 叶片转子的每个叶片将三个接收室中的每一个分隔成延迟液压室和前进液压室。 止回阀设置在提前供给通道内。 止回阀允许工作油从油泵通过提前供给通道流到前进液压室,并且禁止工作油从提前液压室通过提前供给通道回流到排水管。
-
公开(公告)号:US20050284433A1
公开(公告)日:2005-12-29
申请号:US11165311
申请日:2005-06-24
申请人: Seiji Yaoko , Jun Yamada , Kinya Takahashi , Masayasu Ushida , Mitomu Mohri , Takao Nojiri
发明人: Seiji Yaoko , Jun Yamada , Kinya Takahashi , Masayasu Ushida , Mitomu Mohri , Takao Nojiri
CPC分类号: F01L1/3442 , F01L2001/34426 , F01L2001/34456 , F01L2001/34469 , F01L2001/34479
摘要: A shoe housing receives a driving force from a crankshaft and a vane rotor rotates with a camshaft in combination. The vane rotor is received in the shoe housing in such a way as to freely turn. Each of the vanes of the vane rotor partitions each of three receiving chambers into a retard hydraulic chamber and an advance hydraulic chamber. A check valve is disposed in an advance supply passage. The check valve allows a working oil to flow from an oil pump through the advance supply passage to the advance hydraulic chamber and prohibits the working oil from flowing back from the advance hydraulic chamber through the advance supply passage to a drain.
摘要翻译: 靴壳承受来自曲轴的驱动力,叶片转子与凸轮轴组合地旋转。 叶片转子以可自由转动的方式容纳在鞋壳中。 叶片转子的每个叶片将三个接收室中的每一个分隔成延迟液压室和前进液压室。 止回阀设置在提前供给通道内。 止回阀允许工作油从油泵通过提前供给通道流到前进液压室,并且禁止工作油从提前液压室通过提前供给通道回流到排水管。
-
公开(公告)号:US20080257288A1
公开(公告)日:2008-10-23
申请号:US11854337
申请日:2007-09-12
申请人: Kinya TAKAHASHI , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
发明人: Kinya TAKAHASHI , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
IPC分类号: F01L1/344
CPC分类号: F01L1/3442 , F01L2001/34423 , F01L2001/34426 , F01L2001/3444 , F01L2001/34453 , F01L2001/34469
摘要: A first-side check valve prevents a hydraulic fluid from being discharged out of a retard chamber, and a second-side check valve prevents the hydraulic fluid from being discharged out of an advance chamber. A first-side control valve opens or closes a first-side discharge passage by a pilot pressure received through a retard pilot passage. A second-side control valve opens or closes a second-side discharge passage by the pilot pressure received through an advance pilot passage. Another check valve is disposed in a supply passage between a phase switch valve and a branch point, at which a supply passage is branched.
摘要翻译: 第一侧止回阀防止液压流体从延迟室排出,并且第二侧止回阀防止液压流体从提前室排出。 第一侧控制阀通过延迟引导通道接收的先导压力来打开或关闭第一侧排出通道。 第二侧控制阀通过先导先导通路接收的先导压力打开或关闭第二侧排出通道。 另一止回阀设置在相切换阀和分支点之间的供给通道中,在该分支点处供应通道分支。
-
公开(公告)号:US07506622B2
公开(公告)日:2009-03-24
申请号:US11854249
申请日:2007-09-12
申请人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
发明人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
IPC分类号: F01L1/34
CPC分类号: F01L1/3442 , F01L2001/34453 , F01L2001/34469 , Y10T74/2102
摘要: One of retard passages, which supplies working fluid to one of retard chambers, is a dedicated passage. The other remaining retard passages, which supply the working fluid to the other remaining retard chambers, are branch passages, which are branched from a retard passage that serves as a supply passage. With this construction, a flow quantity of working fluid per unit time supplied from the one of retard passages to the one of retard chambers becomes larger than a flow quantity of working fluid per unit time supplied from the other remaining retard passages to the other remaining retard chambers. Thus, the one of retard chambers can be filled with the working fluid earlier than the other remaining retard chambers.
摘要翻译: 一个延迟通道,其将工作流体供应到一个延迟室中,是专用通道。 向另一个滞留室供给工作流体的另一个滞留通道是从用作供给通道的延迟通道分支的分支通道。 利用这种结构,从延迟通道中的一个延迟室提供的每单位时间的工作流体的流量变得比从另一个剩余延迟通道提供给另一个剩余延迟的每单位时间的工作流体的流量大 房间。 因此,延迟室之一可以比其它剩余的延迟室更早地填充工作流体。
-
公开(公告)号:US07506621B2
公开(公告)日:2009-03-24
申请号:US11854156
申请日:2007-09-12
申请人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
发明人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
IPC分类号: F01L1/34
CPC分类号: F01L1/3442 , F01L1/022 , F01L1/024 , F01L2001/34426 , F01L2001/34433 , F01L2001/34459 , F01L2001/34469 , F01L2101/00 , Y10T74/2102
摘要: A phase control valve, which supplies a drive hydraulic pressure to an advance chamber or a retard chamber, is integrated with a drain switch valve, which controls opening and closing of an advance drain control valve and opening and closing of a retard drain control valve, to form a solenoid spool valve. The advance drain control valve is provided in an advance check valve bypass passage, which bypasses an advance check valve, and is driven by a pilot hydraulic pressure to open and close the advance check valve bypass passage. The retard drain control valve is provided in a retard check valve bypass passage, which bypasses a retard check valve, and is driven by a pilot hydraulic pressure to open and close the retard check valve bypass passage.
摘要翻译: 向前进室或延迟室供给驱动液压的相位控制阀与排水开关阀一体化,排水开关阀控制提前排水控制阀的打开和关闭以及减速排放控制阀的打开和关闭, 形成电磁滑阀。 前进排水控制阀设置在提前止回阀旁通通道中,旁通先进止回阀,并由先导液压驱动,以打开和关闭提前止回阀旁通通道。 延迟排放控制阀设置在旁通止回阀的延迟止回阀旁通通道中,并且由先导液压驱动,以打开和关闭延迟止回阀旁路通道。
-
公开(公告)号:US20080060471A1
公开(公告)日:2008-03-13
申请号:US11854249
申请日:2007-09-12
申请人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
发明人: Kinya Takahashi , Masayasu Ushida , Takao Nojiri , Seiji Yaokou , Jun Yamada
IPC分类号: F16H53/04
CPC分类号: F01L1/3442 , F01L2001/34453 , F01L2001/34469 , Y10T74/2102
摘要: One of retard passages, which supplies working fluid to one of retard chambers, is a dedicated passage. The other remaining retard passages, which supply the working fluid to the other remaining retard chambers, are branch passages, which are branched from a retard passage that serves as a supply passage. With this construction, a flow quantity of working fluid per unit time supplied from the one of retard passages to the one of retard chambers becomes larger than a flow quantity of working fluid per unit time supplied from the other remaining retard passages to the other remaining retard chambers. Thus, the one of retard chambers can be filled with the working fluid earlier than the other remaining retard chambers.
摘要翻译: 一个延迟通道,其将工作流体供应到一个延迟室中,是专用通道。 向另一个滞留室供给工作流体的另一个滞留通道是从用作供给通道的延迟通道分支的分支通道。 利用这种结构,从延迟通道中的一个延迟室提供的每单位时间的工作流体的流量变得比从另一个剩余延迟通道提供给另一个剩余延迟的每单位时间的工作流体的流量大 房间。 因此,延迟室之一可以比其它剩余的延迟室更早地填充工作流体。
-
-
-
-
-
-
-
-
-