METHOD AND DEVICE FOR TURBO GENERATOR COOLING
    1.
    发明申请
    METHOD AND DEVICE FOR TURBO GENERATOR COOLING 有权
    用于涡轮发电机冷却的方法和装置

    公开(公告)号:US20120216546A1

    公开(公告)日:2012-08-30

    申请号:US13407168

    申请日:2012-02-28

    IPC分类号: F02C7/18

    摘要: A method and apparatus for the operation of a gas turbine unit with an evaporative intake air cooling system in the intake air pathway, wherein the return water flow of the evaporative intake air cooling system is used for the cooling of components of the gas turbine unit and/or of a generator coupled to the gas turbine unit and/or of another element coupled to the gas turbine unit, and a gas turbine unit adapted to be operated using this method.

    摘要翻译: 一种用于在进气通道中具有蒸发进气冷却系统的燃气轮机单元的操作的方法和装置,其中所述蒸发进气冷却系统的回水流被用于冷却所述燃气轮机单元的部件, 耦合到燃气涡轮机单元和/或耦合到燃气涡轮机单元的另一个元件的发电机,以及适于使用该方法操作的燃气轮机单元。

    Method for controlling a gas turbine in a power plant and power plant for carrying out the method
    3.
    发明授权
    Method for controlling a gas turbine in a power plant and power plant for carrying out the method 有权
    控制发电厂和发电厂燃气轮机执行方法的方法

    公开(公告)号:US08843293B2

    公开(公告)日:2014-09-23

    申请号:US12330154

    申请日:2008-12-08

    IPC分类号: F02C9/00 F02C9/54

    摘要: With a method for controlling a gas turbine in a power plant, a multiplicity of operating lines for the gas turbine for different gas turbine inlet temperatures TIT or gas turbine exhaust temperatures TAT and positions of the compressor inlet guide vane cascade VIGV are specified as a function of the load. For minimizing the electricity production costs during operation switching can be optionally carried out between different operating lines during constant or varying power output of the power plant.

    摘要翻译: 利用用于控制发电厂中的燃气轮机的方法,指定用于不同燃气轮机入口温度TIT或燃气轮机排气温度TAT的燃气轮机的多条操作管线和压缩机入口导叶叶栅级联VIGV的位置作为功能 的负载。 为了最小化操作期间的电力生产成本,可以可选地在发电厂的恒定或变化的功率输出期间在不同的操作线之间进行切换。

    METHOD FOR CONTROLLING A GAS TURBINE IN A POWER PLANT AND POWER PLANT FOR CARRYING OUT THE METHOD
    4.
    发明申请
    METHOD FOR CONTROLLING A GAS TURBINE IN A POWER PLANT AND POWER PLANT FOR CARRYING OUT THE METHOD 有权
    用于控制发电厂和动力装置中的气体涡轮机的方法

    公开(公告)号:US20090150040A1

    公开(公告)日:2009-06-11

    申请号:US12330154

    申请日:2008-12-08

    IPC分类号: F02C9/00

    摘要: With a method for controlling a gas turbine in a power plant, a multiplicity of operating lines for the gas turbine for different gas turbine inlet temperatures TIT or gas turbine exhaust temperatures TAT and positions of the compressor inlet guide vane cascade VIGV are specified as a function of the load. For minimizing the electricity production costs during operation switching can be optionally carried out between different operating lines during constant or varying power output of the power plant.

    摘要翻译: 利用用于控制发电厂中的燃气轮机的方法,指定用于不同燃气轮机入口温度TIT或燃气轮机排气温度TAT的燃气轮机的多条操作管线和压缩机入口导叶叶栅级联VIGV的位置作为功能 的负载。 为了最小化操作期间的电力生产成本,可以可选地在发电厂的恒定或变化的功率输出期间在不同的操作线之间进行切换。

    Method for determination of the temperature, mass-averaged over a flow cross-section, of a gas flow in a gas turbine
    5.
    发明授权
    Method for determination of the temperature, mass-averaged over a flow cross-section, of a gas flow in a gas turbine 有权
    用于确定燃气轮机中的气体流量的流量横截面上的质量平均值的方法

    公开(公告)号:US07617686B2

    公开(公告)日:2009-11-17

    申请号:US11269675

    申请日:2005-11-09

    IPC分类号: F02C1/00 G01K1/00 G01M15/00

    摘要: The invention relates to a method for determination of a temperature, mass-averaged over a flow cross-section, of a gas flow in a gas turbine or the like, particularly during partial load operation of the gas turbine. The invention also relates to a control apparatus, which can be operated using the method according to the invention, for controlling a gas turbine installation.The method according to the invention comprising the steps of the temperature value of the gas flow being detected by a sensor or sensors at at least one position in the gas flow in the area of the flow cross-section, of determination of a correction value for correction of the temperature value for compensation for non-uniformities in the temperature profile of the gas flow across the flow cross-section as a function of at least one operating-point-specific parameter, and of correcting the temperature value, which is recorded by a sensor or sensors, by the correction value.

    摘要翻译: 本发明涉及一种用于确定燃气轮机等中的气流的流动横截面上的质量平均值的方法,特别是在燃气轮机的部分负载操作期间。 本发明还涉及一种可以使用根据本发明的方法操作的用于控制燃气轮机安装的控制装置。 根据本发明的方法包括以下步骤:由流量截面区域中的气流中的至少一个位置处的传感器或传感器检测气流的温度值,确定校正值的校正值 校正温度值,用于补偿横截面上的气流的温度分布中的不均匀性,作为至少一个操作点特定参数的函数,以及校正由温度值记录的温度值 传感器或传感器,通过校正值。

    Method for determination of the temperature, mass-averaged over a flow cross-section, of a gas flow in a gas turbine

    公开(公告)号:US20060096292A1

    公开(公告)日:2006-05-11

    申请号:US11269675

    申请日:2005-11-09

    IPC分类号: F02C7/00

    摘要: The invention relates to a method for determination of a temperature, mass-averaged over a flow cross-section, of a gas flow in a gas turbine or the like, particularly during partial load operation of the gas turbine. The invention also relates to a control apparatus, which can be operated using the method according to the invention, for controlling a gas turbine installation. The method according to the invention comprising the steps of the temperature value of the gas flow being detected by a sensor or sensors at at least one position in the gas flow in the area of the flow cross-section, of determination of a correction value for correction of the temperature value for compensation for non-uniformities in the temperature profile of the gas flow across the flow cross-section as a function of at least one operating-point-specific parameter, and of correcting the temperature value, which is recorded by a sensor or sensors, by the correction value.