公开(公告)号:US5930763A
公开(公告)日:1999-07-27
申请号:US286843
申请日:1994-08-05
IPC分类号: G06Q30/06 , B65G61/00 , G05B19/418 , G06Q10/08 , G06Q50/00 , G06Q50/04 , G06Q50/28 , G06F17/60
CPC分类号: G06Q10/06 , G06Q10/06315
摘要: An order amount of parts can be calculated from an actually used amount of the parts, so that the used parts can be resupplied subsequently. An order amount can also be calculated form a production plan, so that the parts necessary to meet the plan can be delivered.In this technique, an order amount is calculated by the equation "W1.multidot.X1+W2.multidot.X2", where X1 is the order amount calculated in a subsequently resupplying way, X2 is the order amount calculated in a plan correspondence way, W1 is an actual weight, and W2 is a plan weight. The actual weight W1 becomes high and the plan weight W2 becomes low when the subsequently resupplying way is suitable, and vice versa. The actual weight W1 and the plan weight W2 can be calculated from experience or system analysis.
摘要翻译: 可以从实际使用的零件数量计算零件的订单量,以便随后可以重新使用旧零件。 也可以从生产计划中计算订单金额,以便能够交付满足计划所需的部件。 在该技术中,通过等式“W1xX1 + W2xX2”计算订单量,其中X1是以后续补给方式计算的订单量,X2是以计划对应方式计算的订单量,W1为实际权重, W2是计划重量。 当后续补给方式适合时,实际重量W1变高,平均重量W2变低,反之亦然。 实际重量W1和平均重量W2可以根据经验或系统分析计算。
-
公开(公告)号:US5327340A
公开(公告)日:1994-07-05
申请号:US987084
申请日:1992-12-07
申请人: Kuniya Kaneko , Harumichi Wakiyama , Tadasi Naito
发明人: Kuniya Kaneko , Harumichi Wakiyama , Tadasi Naito
CPC分类号: G06Q10/06
摘要: A method for controlling a production apparatus includes steps of providing production information in the form of a specified production time period with respect to a plurality of product types, calculating a production expectation value for each specified production time period, summing the production expectation values for each specified production time period for all the product types and then integer-processing the total number of product portions to be produced each day, providing each day with as many production orders as the integer-processed number of product portions to be produced on that day, and then determining by an average process what product type should be produced in each production order.
摘要翻译: 一种用于控制生产设备的方法包括以关于多个产品类型的指定生产时间段的形式提供生产信息的步骤,计算每个指定生产时间段的生产期望值,将每个生产期的生产期望值相加 指定所有产品类型的生产时间段,然后对每天生产的产品部分的总数进行整数处理,每天提供与当天要生产的整数处理的产品部分一样多的生产订单, 然后通过平均进程确定在每个生产订单中应该生成哪种产品类型。
-
公开(公告)号:US4958292A
公开(公告)日:1990-09-18
申请号:US183704
申请日:1988-04-19
IPC分类号: B62D65/00 , B23Q41/08 , G05B19/418 , G06Q50/00 , G06Q50/04
CPC分类号: G06Q10/06 , G05B19/41865 , G06Q10/0875 , Y02P90/04 , Y02P90/20 , Y02P90/28
摘要: The present invention provides a production control system of enhanced efficiency which is adapted to a mixed production line wherein products having different specifications are mass produced by assembling different parts on a common assembly line. This system is used in a factory wherein different products are required for steps of production. As a result, a production control plan can be scheduled in consideration of part transport times between production factories. To this end, the production control system corrects for the required number, transport time, and final production plan schedule. The final production plane schedule is adapted to establish a production ratio that is an integral number in each of feed cycles in a revolution of the assembly line. To this end, unreserved areas are provided in the feed cycles.
摘要翻译: 本发明提供了一种提高效率的生产控制系统,其适用于混合生产线,其中通过在不同的装配线上组装不同部件来批量生产具有不同规格的产品。 该系统用于在生产步骤中需要不同产品的工厂。 因此,可以考虑生产工厂之间的零件运输时间安排生产控制计划。 为此,生产控制系统校正所需数量,运输时间和最终生产计划进度。 最终的生产计划表适合于在组装线的转动中的每个进给循环中建立一个整数。 为此,在进料循环中提供了未保留的区域。
-
公开(公告)号:US5278750A
公开(公告)日:1994-01-11
申请号:US747297
申请日:1991-08-19
申请人: Kuniya Kaneko , Harumichi Wakiyama , Tadasi Naito
发明人: Kuniya Kaneko , Harumichi Wakiyama , Tadasi Naito
CPC分类号: G06Q10/06 , G06Q10/0631 , G06Q10/0633 , G06Q10/06395 , Y02P90/04 , Y02P90/20
摘要: A method for making a production schedule of an instant process which produces a plurality types of products and supplies the products to a plurality of following processes by trucks. A truck delivery schedule including a number of truck deliveries and times is taken into account when the production schedule of the instant process is made. On the production schedule, a production order of the products is determined, and a stocking schedule also is made on the production order schedule.
摘要翻译: 一种用于制造即时过程的生产计划的方法,该方法产生多种类型的产品,并通过卡车将产品供应到多个以下过程。 当即时处理的生产计划进行时,将考虑包括多个卡车运输和时间的卡车运输计划。 在生产进度表中,确定产品的生产订单,并根据生产订单时间表编制库存安排。
-
公开(公告)号:US07668743B2
公开(公告)日:2010-02-23
申请号:US09729800
申请日:2000-12-06
申请人: Kuniya Kaneko , Hidetsugu Kojima , Hayaaki Fujiyoshi , Toshihiro Nakamura , Motohisa Kondo , Hirosumi Suzuki , Kentaro Otokubo
发明人: Kuniya Kaneko , Hidetsugu Kojima , Hayaaki Fujiyoshi , Toshihiro Nakamura , Motohisa Kondo , Hirosumi Suzuki , Kentaro Otokubo
IPC分类号: G06F9/46
CPC分类号: G06Q10/06 , G06Q10/0631 , G06Q10/06315 , G06Q10/06316 , G06Q10/0637 , G06Q10/06375 , G06Q10/087 , G06Q30/0201
摘要: An apparatus for planning a demand-supply scheme of a supply chain so as to increase the corporate profit. A demand-supply scheme including order receipt, order placement, purchase and supply in the unit of a month of each step of a supply chain that includes various steps, such as product sales steps, product-producing steps, steps of producing parts for producing products, etc. is set so that the order placement to each producing step becomes within an order receivable range that is calculated from the equipment, the manpower, the number of times of operation, etc. of the producing step. Furthermore, a demand-supply scheme is planned and changed so as to maximize a profitability index that is calculated by using a cost regarding the production of a product that includes a material cost, a manpower cost, and an equipment cost, a stock management cost, a transportation cost, etc.
摘要翻译: 一种用于规划供应链供需计划以提高企业利润的设备。 供应方案包括订单收货,订单放置,供应链每一个月的采购和供应,包括各种步骤,如产品销售步骤,产品生产步骤,生产零件生产步骤 产品等被设置为使得每个生产步骤的订单放置在从生产步骤的设备,人力,操作次数等计算的订单可接收范围内。 此外,计划和改变需求供给方案,以便最大化通过使用包括材料成本,人力成本和设备成本的产品的生产成本计算出的利润率指数,库存管理成本 运输费用等
-
公开(公告)号:US5214588A
公开(公告)日:1993-05-25
申请号:US517044
申请日:1990-05-01
申请人: Kuniya Kaneko , Tsunezi Suzuki , Tadashi Naito
发明人: Kuniya Kaneko , Tsunezi Suzuki , Tadashi Naito
IPC分类号: B23Q41/02 , B65G43/00 , G05B15/02 , G05B19/418
CPC分类号: G05B19/41895 , G05B2219/32252 , G05B2219/41302 , Y02P90/18 , Y02P90/20 , Y02P90/285
摘要: A control apparatus provided for an FMS line having a robot for carrying a workpiece and an AGV for carrying a jig to be coupled to the workpiece. The control apparatus generally includes a production instruction device and an AGV movement control device. The production instruction device determines a schedule for supplying jigs on the basis of a work supply order schedule. The AGV movement control device causes an AGV to skip an unavailable station and to move to an available station in accordance with the presence or absence of a workpiece and/or a jig and a kind of a cell to which the AGV is to be moved. The robot operates continuously in the order of the disposition of cells. According to the structure, simplification and cost reduction of the control apparatus are attained.
摘要翻译: 一种用于FMS线的控制装置,其具有用于承载工件的机器人和用于承载要联接到工件的夹具的AGV。 控制装置通常包括生产指示装置和AGV运动控制装置。 生产指导装置基于工作供给订单调度确定供给夹具的时间表。 AGV移动控制装置使AGV跳过不可用站并根据工件和/或夹具的存在或不存在以及AGV要移动的单元的种类移动到可用站。 机器人按照单元的配置顺序运行。 根据该结构,能够实现控制装置的简化和成本降低。
-
-
-
-
-