摘要:
In one embodiment, a method includes receiving at a protocol translator a first message from a first endpoint to a second endpoint. The first message includes a list of media capabilities of the first endpoint. The method also includes transmitting from the protocol translator a second message to the second endpoint including a media capabilities request header and receiving at the protocol translator a response message from the second endpoint. The response message includes a response header including a list of the media capabilities of the second endpoint.
摘要:
In one embodiment, a method includes receiving at a protocol translator a first message from a first endpoint to a second endpoint. The first message includes a list of media capabilities of the first endpoint. The method also includes transmitting from the protocol translator a second message to the second endpoint including a media capabilities request header and receiving at the protocol translator a response message from the second endpoint. The response message includes a response header including a list of the media capabilities of the second endpoint.
摘要:
A method and apparatus is described to convert DTMF packets at a network node in an IP network. The method may comprise receiving an Internet Protocol (IP) packet at the network node connected via a first IP network link to a first network device, and connected via a second IP network link to a second network device. The method may determine a first DTMF packet format for the first IP network link and a second DTMF packet format for the second IP network link and detect that only one of the first or second DTMF packet formats is in-band voice DTMF. Thereafter, the method may convert the received IP packet from the first DTMF packet format to the second DTMF packet format.
摘要:
A control system for a production process having a plurality of operations. A plurality of time constraints exist between the operations. The control system includes a control module that defines a plurality of sub-time constraints between each two operations, generates a plurality of equations according to the time constraints and the sub-time constraints, and calculates the sub-time constraints using the equations. The control module then determines whether a status for each operation defined according to a Work-In-Process (WIP) quantity between a first operation and a checked operation and a throughput rate thereof violates sub-time constraints between the first operation and the checked operation, and releases a lot into the production line if the status for each operation satisfies the corresponding sum of the sub-time constraints.
摘要:
A systematic approach for generating a work release plan that considers both demand and supply variables. The approach comprises prioritizing scheduled lots in order of their critical ratios, estimating an initial daily release quota for the scheduled lots based on both pull and push requirements, and determining detailed capacity constraints for the manufacturing system. The approach further comprises testing whether the initial daily release quota complies with the detailed capacity constraints, and, if the detailed capacity constraints are violated, rearranging the lots in the initial daily release quota so that the detailed capacity constraints are met.
摘要:
Within a method for approximating a cycle time for fabricating a microelectronic fabrication within a microelectronic fabrication facility there is first determined from historic data for fabrication of the microelectronic fabrication within the microelectronic fabrication facility a constant which correlates previous microelectronic fabrication loadings and cycle times within the microelectronic fabrication facility. The correlating constant may then be employed for approximating a cycle time for a future work in process (WIP) quantity of the microelectronic fabrication within the microelectronic fabrication facility.
摘要:
A control system for a production process having a plurality of operations. A plurality of time constraints exist between the operations. The control system includes a control module that defines a plurality of sub-time constraints between each two operations, generates a plurality of equations according to the time constraints and the sub-time constraints, and calculates the sub-time constraints using the equations. The control module then determines whether a status for each operation defined according to a Work-In-Process (WIP) quantity between a first operation and a checked operation and a throughput rate thereof violates sub-time constraints between the first operation and the checked operation, and releases a lot into the production line if the status for each operation satisfies the corresponding sum of the sub-time constraints.
摘要:
A method and system for determining which machine tools to turn off during slow periods to achieve maximum cost savings with minimum cycle time increase. It uses a product demand forecast and a simplified approach to the X-factor theory to provide an objective, analytical model showing the cost savings of potentially turning off different quantities and types of machine tools versus the resulting impact on increased cycle time. This model, which can be visually plotted into a graph, can aid management decision as to the optimum machine tools to turn off while fine-tuning the marginal machine choices can keep cycle time under a predetermined acceptable maximum.
摘要:
In a data-replication system including a plurality of computers in communication with at least one network, each of said computers maintaining a substantially similar database thereon, a method and system applicable for filtering requests is disclosed. The method comprises the steps of capturing each of the requests, determining the consequences of the request, and precluding storing the consequences of the request when said request matches known criteria.