Order entry apparatus for automatic estimation and its method
    1.
    发明授权
    Order entry apparatus for automatic estimation and its method 失效
    自动估算订单输入装置及其方法

    公开(公告)号:US5307260A

    公开(公告)日:1994-04-26

    申请号:US619618

    申请日:1990-11-29

    CPC分类号: G06Q10/087 G06Q10/0875

    摘要: Order entry apparatus for automatic estimation a transformation model comprising a pattern composed of a plurality of parameters representing custom product specifications, production line conditions and factors for composing the estimates for production cost and completion date. The parameters of this transformation model are specified by learning, leading to estimation for the requested product specifications, in broad consideration of conditions such as those of the production line. The use of a neural network model as this pattern transformation model makes pattern transformation more flexible and pattern learning more efficient. Estimation accuracy is also increased by entering values of predicted charges in production line conditions such as loads or stock obtained from resource requirements planning, process design, capacity requirements planning, etc.

    摘要翻译: 用于自动估计的订单输入装置,包括由表示定制产品规格,生产线条件以及用于构成生产成本估计和完成日期的因素的多个参数组成的图案。 该变换模型的参数通过学习来指定,从而在广泛考虑了生产线条件的条件下,对所要求的产品规格进行估计。 使用神经网络模型作为这种模式转换模型,使得模式转换更加灵活,模式学习更有效率。 通过在生产线条件(如从资源需求计划,过程设计,能力需求计划等)获得的负载或库存中输入预计费用的值,还可以提高估算精度。

    Manufacturing planning system
    3.
    发明授权
    Manufacturing planning system 失效
    制造规划系统

    公开(公告)号:US5231567A

    公开(公告)日:1993-07-27

    申请号:US796850

    申请日:1991-11-25

    摘要: A manufacturing planning system has lead time estimating function, MRP executing function, work demand calculating function, problem analyzing function, capacity adjusting function, product completion data adjusting function, and alternative shop designating function for planning a production schedule by calculating successively lead time in consideration of amount of work demanded and capacity for production, analyzing problems in the production schedule and performing relevant adjustments for solving the problems. An on-line display function is provided for simultaneous display of the problems and load/capacity states of production shops in association with solution of the problems and various adjustment together with the results thereof.

    摘要翻译: 制造计划系统通过计算连续提前时间来计划生产计划,具有前置时间估计功能,MRP执行功能,工作需求计算功能,问题分析功能,容量调整功能,产品完成数据调整功能,以及替代车间指定功能 要求的工作量和生产能力,分析生产计划中的问题,并对解决问题进行相关调整。 提供在线显示功能,用于同时显示生产车间的问题和负载/容量状态,同时解决问题和各种调整以及其结果。

    Production planning system
    4.
    发明授权
    Production planning system 失效
    生产计划制度

    公开(公告)号:US5479343A

    公开(公告)日:1995-12-26

    申请号:US59227

    申请日:1993-05-10

    CPC分类号: G06Q10/06 G05B19/41865

    摘要: In a production planning system, the explosion of a product to parts is performed by a specification check device and a design passage judgement device. An MRP calculation control device, a leadtime forecasting device, an MRP explosion calculation device, a work load calculation device and a data input/output device cooperate to estimate a shop load and to calculate a leadtime with a work load and a production capacity taken into consideration, thereby drawing up a production plan. A problem area analysis device analyzes a problematical area in the production plan to display it by graphics of the data input/output device. Various adjustment devices carry out the adjustment of the production plan through a graphic interface.

    摘要翻译: 在生产计划系统中,产品对部件的爆炸是由规格检查装置和设计通过判断装置执行的。 MRP计算控制装置,前置时间预测装置,MRP爆炸计算装置,工作负载计算装置和数据输入/输出装置协同估计车间负载并计算工作负荷和生产能力的进场时间 考虑,从而制定生产计划。 问题区域分析设备分析生产计划中的问题区域以通过数据输入/输出设备的图形显示。 各种调整装置通过图形界面进行生产计划的调整。

    Teaching apparatus for robot
    6.
    发明授权
    Teaching apparatus for robot 失效
    机器人教学仪器

    公开(公告)号:US4831548A

    公开(公告)日:1989-05-16

    申请号:US922454

    申请日:1986-10-23

    摘要: Disclosed is a teaching apparatus for a robot comprising a graphic display capable of displaying characters, symbols, and figures, a pointing device capable of indicating any point on the display screen, a storage for storing character, symbol, and graphic information, and an arithmetic and logic unit for taking in three dimensional data and data of hand coordinates system stored in the storage, calculating a conversion matrix t.sub.v for conversion to data of hand coordinates system and a conversion matrix T.sub.p for projection to the hand coordinates system, converting three dimensional data to two dimensional data according to the thus calculated conversion matrices T.sub.v and T.sub.p, and allowing a display of surroundings viewed from a view point of the robot in motion or at rest to be made on the graphic display.

    摘要翻译: 公开了一种用于机器人的教学装置,其包括能够显示字符,符号和图形的图形显示器,能够指示显示屏幕上的任何点的指示设备,用于存储字符,符号和图形信息的存储器,以及算术 以及用于获取存储在存储器中的手坐标系的三维数据和数据的逻辑单元,计算用于转换为手坐标系数据的转换矩阵tv和用于投影到手坐标系的转换矩阵Tp,将三维数据 根据如此计算出的转换矩阵Tv和Tp的二维数据,并且允许从机器人的运动或静止的视点观看的环境的显示在图形显示器上进行。

    Method and device for computing material requirements
    7.
    发明授权
    Method and device for computing material requirements 失效
    计算材料要求的方法和装置

    公开(公告)号:US6122560A

    公开(公告)日:2000-09-19

    申请号:US923069

    申请日:1997-09-03

    CPC分类号: G06Q10/06 G06Q10/0875

    摘要: A method or device for computing material requirements which calculates various parts and materials necessary for products to be produced when a production plan is input, in order to reduce the processing time for a material requirements computation. In order to establish the object, the method or device of computing material requirements is provided, which can perform a parallel process without using conventional low level codes. Parts computing means are respectively assigned to items. When the lower parts computing means receives the computation result of the upper parts computing means, it independently executes the computing process if the computation result is sufficient for the parts computation. The process rate of the material requirements computation can be improved by performing the load distribution under a fixed rule, including that to which computer the data of an item is loaded or by which computer an item is processed, when the material requirements are computed in parallel process using plural computers.

    摘要翻译: 一种用于计算材料需求的方法或装置,其计算当输入生产计划时要产生的产品所需的各种部件和材料,以便减少材料需求计算的处理时间。 为了建立对象,提供了计算材料要求的方法或装置,其可以在不使用常规低级代码的情况下执行并行处理。 零件计算装置分别分配给项目。 当下部计算装置接收上位计算装置的计算结果时,如果计算结果足以用于零件计算,则它独立地执行计算处理。 物料需求计算的过程速度可以通过在固定规则下执行负载分配,包括对物料的数据加载到哪个计算机或处理哪个计算机的物料,当材料需求并行计算时 使用多台计算机的过程。