公开(公告)号:US20050145681A1
公开(公告)日:2005-07-07
申请号:US10504842
申请日:2003-07-16
IPC分类号: F28F21/08 , B23K1/008 , B23K1/012 , B23K1/19 , B23K1/20 , B23K31/02 , B23K101/14 , B23K103/10 , F27B9/04 , F27B9/06 , F27B9/12 , F27B9/24 , F27D1/00 , F27D7/04 , F27D7/06 , F27D19/00
CPC分类号: B23K1/20 , B23K1/008 , B23K1/012 , B23K2103/10 , F27B9/045 , F27B9/047 , F27B9/068 , F27B9/243 , F27D1/0006 , F27D19/00 , F27D2007/045 , F27D2019/0003 , F27D2019/0012
摘要: When aluminium products are preheated in a preheating furnace up to about 500° C. before they are brazed with a flux in a heating furnace, a nitrogen atmosphere in the preheating furnace is made convectional by fans for improving heating efficiencies and also for having the oxygen which is brought into the preheating furnace as a disturbance thereof and scattered about in the nitrogen atmosphere, contacted to furnace inner walls of the preheating furnace which are made from carbonaceous materials, and reacted therewith so as to be changed to CO, resulting in keeping the oxygen concentration of nitrogen atmosphere low, whereby when the aluminium products are brazed by heating them in a continuous atmosphere furnace including said preheating furnace and said heating furnace, heating time thereof is shorten and the brazing is made more economically than before.
摘要翻译: 当铝制品在预热炉中预热至高达约500℃,然后在加热炉中用助熔剂钎焊之前,预热炉中的氮气氛被风扇对流,以提高加热效率,并且还具有氧气 将其作为其干扰物引入预热炉中并在氮气氛中散落,与由碳质材料制成的预热炉的炉内壁接触,并与其反应以变为CO,从而保持 氮气氛的氧浓度低,由此当通过在包括所述预热炉和所述加热炉的连续气氛炉中加热将铝产品钎焊时,其加热时间缩短,钎焊比以前更经济。
-
公开(公告)号:US07399180B2
公开(公告)日:2008-07-15
申请号:US11443033
申请日:2006-05-31
IPC分类号: F27B9/02
摘要: The object of this invention is to have shorter sealing chambers (preheating chamber and gradual cooling chamber) located before and after the brazing atmospheric chamber, to make higher sealing of the atmosphere, and to prevent the scratch caused by the conventional curtains made of metal or others. In order for that, the structures made of steel or graphite are installed standing perpendicular to the moving direction on the conveyor belt which is circulating through the atmospheric furnace. And the bendable or flexible sealing materials are installed on the ceiling and on the right and left side walls of the sealing chambers (preheating chamber and gradual cooling chamber), which are located before and after the atmospheric furnace, into the above two chambers, and making these bendable or flexible sealing materials have rubbing contact with the above mentioned structures.
摘要翻译: 本发明的目的是在钎焊大气室之前和之后具有较短的密封室(预热室和逐渐冷却室),以使气氛更高密封,并防止由金属制成的传统窗帘 其他。 为此,在循环通过大气炉的传送带上,将由钢或石墨制成的结构安装成垂直于移动方向。 并且可弯曲或柔性的密封材料安装在位于大气炉前后的密封室(预热室和逐渐冷却室)的天花板和左右侧壁上进入上述两个室,以及 使得这些可弯曲或柔性的密封材料与上述结构具有摩擦接触。
-
公开(公告)号:US20060292516A1
公开(公告)日:2006-12-28
申请号:US11443033
申请日:2006-05-31
IPC分类号: F27D15/02
摘要: The object of this invention is to have shorter sealing chambers (preheating chamber and gradual cooling chamber) located before and after the brazing atmospheric chamber, to make higher sealing of the atmosphere, and to prevent the scratch caused by the conventional curtains made of metal or others. In order for that, the structures made of steel or graphite are installed standing perpendicular to the moving direction on the conveyor belt which is circulating through the atmospheric furnace. And the bendable or flexible sealing materials are installed on the ceiling and on the right and left side walls of the sealing chambers (preheating chamber and gradual cooling chamber), which are located before and after the atmospheric furnace, into the above two chambers, and making these bendable or flexible sealing materials have rubbing contact with the above mentioned structures.
摘要翻译: 本发明的目的是在钎焊大气室之前和之后具有较短的密封室(预热室和逐渐冷却室),以使气氛更高密封,并防止由金属制成的传统窗帘 其他。 为此,在循环通过大气炉的传送带上,将由钢或石墨制成的结构安装成垂直于移动方向。 并且可弯曲或柔性的密封材料安装在位于大气炉前后的密封室(预热室和逐渐冷却室)的天花板和左右侧壁上进入上述两个室,以及 使得这些可弯曲或柔性的密封材料与上述结构具有摩擦接触。
-
-