Brazing furnace
    2.
    发明授权
    Brazing furnace 有权
    钎焊炉

    公开(公告)号:US07399180B2

    公开(公告)日:2008-07-15

    申请号:US11443033

    申请日:2006-05-31

    IPC分类号: F27B9/02

    摘要: The object of this invention is to have shorter sealing chambers (preheating chamber and gradual cooling chamber) located before and after the brazing atmospheric chamber, to make higher sealing of the atmosphere, and to prevent the scratch caused by the conventional curtains made of metal or others. In order for that, the structures made of steel or graphite are installed standing perpendicular to the moving direction on the conveyor belt which is circulating through the atmospheric furnace. And the bendable or flexible sealing materials are installed on the ceiling and on the right and left side walls of the sealing chambers (preheating chamber and gradual cooling chamber), which are located before and after the atmospheric furnace, into the above two chambers, and making these bendable or flexible sealing materials have rubbing contact with the above mentioned structures.

    摘要翻译: 本发明的目的是在钎焊大气室之前和之后具有较短的密封室(预热室和逐渐冷却室),以使气氛更高密封,并防止由金属制成的传统窗帘 其他。 为此,在循环通过大气炉的传送带上,将由钢或石墨制成的结构安装成垂直于移动方向。 并且可弯曲或柔性的密封材料安装在位于大气炉前后的密封室(预热室和逐渐冷却室)的天花板和左右侧壁上进入上述两个室,以及 使得这些可弯曲或柔性的密封材料与上述结构具有摩擦接触。

    Brazing furnace
    3.
    发明申请
    Brazing furnace 有权
    钎焊炉

    公开(公告)号:US20060292516A1

    公开(公告)日:2006-12-28

    申请号:US11443033

    申请日:2006-05-31

    IPC分类号: F27D15/02

    摘要: The object of this invention is to have shorter sealing chambers (preheating chamber and gradual cooling chamber) located before and after the brazing atmospheric chamber, to make higher sealing of the atmosphere, and to prevent the scratch caused by the conventional curtains made of metal or others. In order for that, the structures made of steel or graphite are installed standing perpendicular to the moving direction on the conveyor belt which is circulating through the atmospheric furnace. And the bendable or flexible sealing materials are installed on the ceiling and on the right and left side walls of the sealing chambers (preheating chamber and gradual cooling chamber), which are located before and after the atmospheric furnace, into the above two chambers, and making these bendable or flexible sealing materials have rubbing contact with the above mentioned structures.

    摘要翻译: 本发明的目的是在钎焊大气室之前和之后具有较短的密封室(预热室和逐渐冷却室),以使气氛更高密封,并防止由金属制成的传统窗帘 其他。 为此,在循环通过大气炉的传送带上,将由钢或石墨制成的结构安装成垂直于移动方向。 并且可弯曲或柔性的密封材料安装在位于大气炉前后的密封室(预热室和逐渐冷却室)的天花板和左右侧壁上进入上述两个室,以及 使得这些可弯曲或柔性的密封材料与上述结构具有摩擦接触。