摘要:
A method of planning the movement of plural trains over a train network utilizing route protection for the route immediately ahead of a train to avoid undesirable changes to the planned route of the train.
摘要:
A method of planning the movement of plural trains over a train network utilizing route protection for the route immediately ahead of a train to avoid undesirable changes to the planned route of the train.
摘要:
A method of planning the movement of plural trains through a rail network using a database of dynamic planning attributes reflecting the current conditions of the train and rail network.
摘要:
A method of planning the movement of plural trains through a rail network using a database of dynamic planning attributes reflecting the current conditions of the train and rail network.
摘要:
A scheduling system and method for moving plural objects through a system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. The estimation of the location of trains in track warranty locations where track sensor and GPS indications are not available is made based on the movement planners and the form-based movement authorities issued to each trains. Certain user interactions are interpreted as a specific train location.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Deadlock is avoided by controlling the entry of trains into congested areas, and may be automatically implemented by the use of traffic flow analysis algorithms.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Deadlock is avoided by controlling the entry of trains into congested areas, and may be automatically implemented by the use of traffic flow analysis algorithms.
摘要:
A method of optimizing the movement of plural trains using a front end cost function that evaluates the costs of each railcar in the consist of a train.
摘要:
A method of scheduling network resources in a first domain by transforming the problem to a second domain, solving the problem and transforming back to the first domain.
摘要:
A method of scheduling the movement of trains using the creation and the pre-allocation of virtual resources in order to develop an optimized schedule of actual train movement.