摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Deadlock is avoided by controlling the entry of trains into congested areas, and may be automatically implemented by the use of traffic flow analysis algorithms.
摘要:
A method of planning the movement of plural trains through a rail network using a database of dynamic planning attributes reflecting the current conditions of the train and rail network.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Alternative routes through congested areas are automatically selected using congestion prediction metrics.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Alternative routes through congested areas are automatically selected using congestion prediction metrics.
摘要:
A scheduling system and method for moving plural objects through a system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Train location reports used in the automatic updating of the movement plans are selectively disabled for individual trains as a function of the activity scheduled for that train.
摘要:
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Similar movement planners exist for moving trains in yards or terminals. Coordination is achieved and system efficiency improved by interfacing the line of road and yard planners.
摘要:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.
摘要:
A system and method for controlling the movement of plural trains over a rail network, where the rail network is divided into at least one control area with a dispatcher assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.