Offloading Traffic of a User Equipment Communication Session from a Cellular Communication Network to a Wireless Local Area Network (WLAN)
    2.
    发明申请
    Offloading Traffic of a User Equipment Communication Session from a Cellular Communication Network to a Wireless Local Area Network (WLAN) 审中-公开
    将用户设备通信会话的流量从蜂窝通信网络卸载到无线局域网(WLAN)

    公开(公告)号:US20160198364A1

    公开(公告)日:2016-07-07

    申请号:US14911096

    申请日:2013-08-09

    CPC classification number: H04W28/08 H04W36/14 H04W36/22 H04W84/12 H04W88/06

    Abstract: A User Equipment including at least one processor, and at least one memory for storing instructions to be executed by the processor, wherein the at least one memory and the instructions are configured to, with the at least one processor, cause the User Equipment at least: to conduct a processing for deciding whether or not it is acceptable to divert at least a part of a communication traffic of a communication currently conducted by the User Equipment with a first communication network to a second communication network, in case the decision is that it is not acceptable, to prepare a report indicating that the diversion of the communication traffic to the second communication network is not conducted, and to cause a transmission of the report to the first communication network.

    Abstract translation: 包括至少一个处理器的用户设备和用于存储要由处理器执行的指令的至少一个存储器,其中所述至少一个存储器和指令被配置为与所述至少一个处理器一起使得所述用户设备至少 :进行用于决定是否可接受的处理,以将当前由用户设备进行的通信的至少一部分通信具有第一通信网络转移到第二通信网络,如果该决定是 不能准备报告,指示不进行通信业务的转移到第二通信网络,并且将报告发送到第一通信网络。

    Control of Resources
    3.
    发明申请
    Control of Resources 审中-公开
    资源控制

    公开(公告)号:US20160150502A1

    公开(公告)日:2016-05-26

    申请号:US14899657

    申请日:2013-06-25

    Abstract: A method including receiving information at an apparatus; and using said information for configuration of a radio resource control connection of said apparatus with a first node controlling a first cell and a second node controlling a second cell; and wherein said configuration of a radio resource control connection is made in dependence on a capability of said apparatus.

    Abstract translation: 一种方法,包括在设备处接收信息; 以及使用所述信息来配置所述设备的无线电资源控制连接与控制第一小区的第一节点和控制第二小区的第二节点; 并且其中根据所述装置的能力进行无线电资源控制连接的所述配置。

Patent Agency Ranking