摘要:
The process for assembling long sections (11) of booms of support legs of an oil platform comprises machining an inclined flat surface (15) on the whole of the length of each main face of a rectangular plate (12), machining a groove behind each flat surface (15), machining an inclined chamfer on longitudinal edges of a stiffener (13), placing a stiffener (13) on each main face of the rectangular plate (12), welding each stiffener (13) to the rectangular plate (12), under a vacuum from the exterior by means of an electron beam, in the region of the chamfers and the flat surfaces so as to produce a section (11), and heat treating the section (11).
摘要:
The locking device for a self-raising oil platform comprising a shell (1) mounted to be movable along legs (2) by means of raising mechanisms comprising output gear pinions cooperative with racks (3) mounted on at least a part of the length of the legs (2), comprises a toothed member (6) forming a counter-rack (6a) mounted on the shell of the platform, means (7) for shifting the toothed member (6) transversely of the direction of the rack with which the device is associated for engaging the teeth of the toothed member in the teeth of the rack (3) or for disengaging them from the teeth of the rack, clamping plates (13) connected to the toothed member and clamping counter-plates (15) connected to the platform, and means (20) for clamping the plates and counter-plates together so as to lock the toothed member (6) in position in the rack.
摘要:
The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
摘要:
The present disclosure provides an improved system and method for increasing an anchoring force on a pile. The concepts regarding the pile can apply whether the pile is degraded and no longer able to support its intended load, or a load on the pile has increased to a level that may overstress the pile. A sleeve can be installed even in subsea conditions over the pile and can be used to provide an additional securing force to the existing pile. The sleeve may include its own padeye for coupling an anchor line or other coupling member to a structure to be secured. The sleeve may also include an assembly of rings coupled together with at least one longitudinal member. The assembly with the rings spaced a distance away from each other may help reduce an installation friction on the sleeve, as it is installed into the sea floor.
摘要:
An installation for manufacturing a wound rigid tubular pipe intended to be installed by a laying ship. An assembly unit for assembling a plurality of rigid tubes end to end to obtain lengths and for assembling the lengths to form the rigid tubular pipe which is intended to be wound onto a storage reel situated on the laying ship. An intermediate winding and deforming apparatus arranged on a first float distinct from the laying ship in order to plastically deform the rigid tubular pipe and wind it onto the intermediate winding apparatus after the rigid tubular pipe has been formed. A connector connecting together the first float and the assembly unit.
摘要:
An installation for producing oil from an off-shore deposit has a semi-submersible platform, at least one riser connecting the platform to the sea bed, and devices for tensioning the riser. The tensioning devices include, for each riser, at least one submerged float connected to a point on the main run of the riser for hauling it towards the surface, and a mechanism for hauling the riser. The mechanism is installed on the platform and applied to the top end of the riser.
摘要:
Apparatus for transporting and installing a deck of an offshore oil production comprises a floating barge (10) adapted to support the deck (1) and provided with devices for moving the deck (1). The apparatus includes a support framework (11) for the deck (1) adapted to be placed on the barge (10) and including the devices for moving the deck (1) in the form of at least one rack (21) that can be moved vertically by drive mechanisms (20).
摘要:
The structure (10) for transporting and installing or retrieving underwater equipment comprises a floating hull (11) equipped with legs (20) that can be moved vertically relative to the floating hull (11), a platform (60) carried by shuttles (30) each associated with a leg (20) and able to be moved vertically relative to the hull (11) by said legs (20), means of temporarily anchoring the equipment to the underside of the platform (60) and means (65, 66) of moving said equipment in the water between a first position pressed against the anchoring means and a second position away from said means.
摘要:
The present disclosure relates to a method of assembling and installing a very large floating barge (1) and includes manufacturing each side portion (10) and each connection portion (15) separately, placing each side portion (10) on the water, moving the connection portions (15) between the side portions (10), moving the connection portions (15) vertically, fixing the connection portions (10) to the side portions (15) and taking the barge (1) to the operation site.
摘要:
The invention relates to a complementary locking system for locking legs to the deck of a jack-up offshore drilling platform. The inventive system comprises the following elements at each leg, namely: at least one assembly comprising plates forming two counter-racks which are intended to be engaged with a leg rack and, on one side of the plates, at least one internal element for connecting the internal edges of the plates, at least one external element for connecting the external edges of the plates and at least one intermediate member for connecting said at least one internal element to said at least one external element. The invention also relates to methods of installing said complementary locking system on the legs of a jack-up offshore drilling platform.