-
公开(公告)号:US11834949B2
公开(公告)日:2023-12-05
申请号:US18178385
申请日:2023-03-03
发明人: Weiyao Guo , Lexin Chen , Yan Tan , Yunliang Tan , Tongbin Zhao
摘要: A collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting provided by the disclosure includes the following steps: step 1, driving into a coal seam to release pressure; step 2, low roof pre-splitting during driving process; step 3, supporting of roadway surrounding rock and support reinforcement; step 4, floor destressing of the roadway; step 5, high roof pre-splitting before mining; step 6, destressing and supporting of the advanced roadway surrounding rock during the mining process of the working face. The collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting, and to carry out local pressure relief, roof pre-splitting and reinforcement support construction in the whole cycle of the coal working face in a progressive manner, so as to achieve the prevention and control of rock burst in the working face.
-
公开(公告)号:US11821874B1
公开(公告)日:2023-11-21
申请号:US18308753
申请日:2023-04-28
发明人: Xufei Gong , Lexin Chen , Yueying Zhang , Weiyao Guo , Chengguo Zhang , Yulong Zhang
CPC分类号: G01N3/04 , G01N3/24 , G01N2203/0025 , G01N2203/0098 , G01N2203/0226
摘要: A dynamic load shearing test device and method based on a hopkinson bar system are provided in this disclosure, which relates to the technical field of rock detection tests. The device according to the disclosure includes a bearing frame, a carriage, a sample holding unit, a pressure environment generating unit, a sample switching unit, an incident bar and a transmission bar, and the test method includes following steps: test device assembly, device leveling, pre-test preparation, test conducting, sample angle switching and test device resetting. The disclosure has advantages that the cylindrical sample can be quickly fixed, a required temperature environment can be well maintained, the cylindrical sample can be better fixed in a high-pressure environment, rotation of the cylindrical sample is not hindered in a low-pressure environment, switching of test positions is facilitated, and test efficiency can be accelerated.
-
公开(公告)号:US11860135B2
公开(公告)日:2024-01-02
申请号:US18317198
申请日:2023-05-15
发明人: Weiyao Guo , Yueying Zhang , Lexin Chen , Dongxiao Zhang , Yunliang Tan , Tongbin Zhao
摘要: A three-dimensional dynamic and static load test system for simulating deep roadway excavation and a method thereof are provided, which relates to the technical field of indoor simulation testing in underground engineering. The system includes a mobile platform, a box body, a support frame, a roadway excavation device, and a data monitoring unit. The system and method of the disclosure can reproduce the whole process of roadway excavation, simulate the multi-directional loading of deep roadway, and restore the real stress state of deep roadway under the influence of dynamic and static load superimposed disturbance. The problem of insufficient research under the condition of unidirectional static loading and lack of multi-directional dynamic and static loading in current large-scale experimental devices has been solved, and the stress and deformation of the surrounding rock of the roadway are reflected in real-time through the data monitoring unit.
-
-