Decentralized generator control
    3.
    发明授权

    公开(公告)号:US09912158B2

    公开(公告)日:2018-03-06

    申请号:US15071514

    申请日:2016-03-16

    CPC classification number: H02J3/381 G05B15/02 H02J3/46

    Abstract: The present disclosure pertains to distributed controllers configured to control a plurality of electrical generators in an electrical generation and distribution system. In one embodiment, a distributed controller consistent with the present disclosure may include a communication subsystem configured to communicate via a network. The communication system may receive a first plurality of time-stamped electrical parameter measurements associated with a first electrical generator. A measurement analysis subsystem may detect a change caused by an event in the measurements associated with the first electrical generator, and may detect a change in a second plurality of time-stamped electrical parameter measurements associated with a second electrical generator. A magnitude of the event may be determined based on the first and second plurality of time-stamped electrical parameter measurements. A load sharing dispatch subsystem may adjust an electrical output of the second electrical generator based on the magnitude of the event.

    Decentralized Generator Control
    4.
    发明申请

    公开(公告)号:US20170271872A1

    公开(公告)日:2017-09-21

    申请号:US15071514

    申请日:2016-03-16

    CPC classification number: H02J3/381 G05B15/02 H02J3/46

    Abstract: The present disclosure pertains to distributed controllers configured to control a plurality of electrical generators in an electrical generation and distribution system. In one embodiment, a distributed controller consistent with the present disclosure may include a communication subsystem configured to communicate via a network. The communication system may receive a first plurality of time-stamped electrical parameter measurements associated with a first electrical generator. A measurement analysis subsystem may detect a change caused by an event in the measurements associated with the first electrical generator, and may detect a change in a second plurality of time-stamped electrical parameter measurements associated with a second electrical generator. A magnitude of the event may be determined based on the first and second plurality of time-stamped electrical parameter measurements. A load sharing dispatch subsystem may adjust an electrical output of the second electrical generator based on the magnitude of the event.

    Decentralized generator control
    6.
    发明授权

    公开(公告)号:US09906041B2

    公开(公告)日:2018-02-27

    申请号:US15071512

    申请日:2016-03-16

    CPC classification number: H02J3/46 G05B15/02 H02J3/381 H02J3/42

    Abstract: The present disclosure pertains to distributed controllers configured to control a plurality of electrical generators in an electrical generation and distribution system. In one embodiment, a distributed controller consistent with the present disclosure may include a communication subsystem to obtain a first plurality of time-stamped electrical parameter measurements from a first node. A measurement analysis subsystem may compare the first plurality of time-stamped electrical parameter measurements and the second plurality of time-stamped electrical parameter measurements. The first node and the second node may be associated in an electrical island by a topology detection subsystem based on the correlation. A control subsystem may be configured to implement a control action based on the association of the first node and the second node in the electrical island.

    Decentralized Generator Control
    7.
    发明申请

    公开(公告)号:US20170271882A1

    公开(公告)日:2017-09-21

    申请号:US15071512

    申请日:2016-03-16

    CPC classification number: H02J3/46 G05B15/02 H02J3/381 H02J3/42

    Abstract: The present disclosure pertains to distributed controllers configured to control a plurality of electrical generators in an electrical generation and distribution system. In one embodiment, a distributed controller consistent with the present disclosure may include a communication subsystem to obtain a first plurality of time-stamped electrical parameter measurements from a first node. A measurement analysis subsystem may compare the first plurality of time-stamped electrical parameter measurements and the second plurality of time-stamped electrical parameter measurements. The first node and the second node may be associated in an electrical island by a topology detection subsystem based on the correlation. A control subsystem may be configured to implement a control action based on the association of the first node and the second node in the electrical island.