摘要:
A paint conduit has a jacket surrounding an interior and a hose arranged in the interior of the jacket. At least one end member is attached to a first end of the jacket and secures a first end of the hose in the jacket. The at least one end member has an end member section inserted between the jacket and the hose. The first end of the hose is at least as long as the jacket within the at least one end member. The hose extends through the at least one end member and an insert is inserted into the first end of the hose and presses the hose radially against the at least one end member.
摘要:
A paint conduit has a jacket surrounding an interior and a hose arranged in the interior of the jacket. At least one end member is attached to a first end of the jacket and secures a first end of the hose in the jacket. The at least one end member has an end member section inserted between the jacket and the hose. The first end of the hose is at least as long as the jacket within the at least one end member. The hose extends through the at least one end member and an insert is inserted into the first end of the hose and presses the hose radially against the at least one end member.
摘要:
A varnishing installation includes a varnish line with an inlet end, an outlet end and an auxiliary device. The auxiliary device is connected through a valve arrangement to the varnishing line and the valve arrangement is scrapeable.
摘要:
A color changer has a valve block for connecting a plurality of coating material lines to an application device. The valve block has a parallelepiped housing. The housing has a central color channel with an axial direction and contains valve bores for receiving valves and a length of a central color channel is as short as possible with a simultaneous supply of many paint feed lines. A first number of parallel valve bores open into the color channel at first openings, a second number of parallel valve bores open into the color channel at second openings on the opposite side of the color channel and offset in the axial direction with respect to the first number of valve bores. A third number of parallel valve bores open into the color channel at third openings and a fourth number of parallel valve bores open into the color channel at fourth openings.
摘要:
A metering pump for varnish or laquer includes a housing in which are arranged a first gear wheel and a second gear wheel which is in engagement with the first gear wheel. At least the first gear wheel is mounted with a shaft in the housing. The pump further has a sealing device provided for the first gear wheel, wherein each gear wheel has a conveying area formed by a toothing, and wherein the sealing device is arranged between the conveying area and an end face area of the gear wheel. The sealing device is sealed in the housing by a radial sealing device.
摘要:
The paint-spraying apparatus exhibits a supply line 7 for coating material, extending from the color changer to the atomizer. Cut-off valves 26, 27 installed in the supply line delimit an insulating section 25 of said supply line, which insulating section is associated with means 28 to 32 for emptying and flushing said insulating section 25. A voltage divider 16 is connected in parallel to said insulating section 25. When colors are changed, the residual coating material present in said voltage divider 16 can be moved into the empty insulating section 25, after which it is forced by means of slugs back through the entire supply line 7 to the color changer 1, and is thus reclaimed.
摘要:
A voltage isolating device selectively electrically isolates from each other two points (13 and 15) of an electrically conductive flow medium having different electrical potentials along a flow path. The electrically conductive flow medium is conveyed in the inner space (18′) of a freely protruding carrier (17′) having at least one discharge opening (29). The carrier (17′) moves back and forth between a first isolating position and a second docking position to allow a transfer flow. The discharge opening (29) is closed until the docking position has been reached, wherein the discharge opening is opened, and is closed again when the carrier is moved out of the docking position.
摘要:
In a method of cleaning a paint application system when switching between two different types or colors of paint, at least a predominant portion of the first paint (35) remaining in a paint line (3) is caused to flow back into its paint supply container (5). Then the entire paint line is flushed out using a flushing medium, before supplying the second paint through the paint line. In this manner, the paint remaining in the painting system at the end of a painting cycle is not wasted, but rather is saved to later be reused. A paint application apparatus includes a paint supply switching device (4), at least two paint supply containers (5 to 8), a paint spray nozzle (2), and a paint line (3) connecting the color switching device (4) to the spray nozzle (2). Two receiver stations (28) and (31) are interposed in the paint line (3), and a shuttle element in the form of a pipe cleaner swab (29) is arranged in the paint line (3) so as to be able to shuttle back and forth between the two receiver stations. A pressure medium or flushing medium can be introduced into the paint line (3) between the first receiver station (28) and the spraying nozzle (2), so as to push the pipe cleaner swab (29) through the paint line (3) to the second receiver station (31). Thereby, the paint remaining in the paint line (3) is pushed back into the paint supply container.
摘要:
A process for coating, in particular for painting, individual objects or small-series batches with a small quantity of paint uses a plurality of atomizers 2, 3, 4 connected one behind the other to a main supply line 5, at one end/start 6 of which a paint-supply unit 7 is arranged. Only the quantity of paint which is required for the painting job and an additional minimal residual quantity are introduced into the main supply line 5, irrespective of the length and the actual capacity of the main supply line 5, e.g. a paint quantity less than the volume capacity of the main supply line. The contents of the main supply line 5 are forced, by at least one pig 32, which is pushed through the line 5 by a pushing medium, to the atomizers 2, 3, 4, and the contents are then at least substantially completely discharged there.
摘要:
An apparatus and method for painting a workpiece while switching paint colors between successive painting cycles includes a paint supply switching device, a paint feed line connected to the paint supply switching device, a separating element adapted to move back and forth in at least a portion of the paint feed line, first and second receiver stations adapted to receive the separating element at the end positions of its travel in the paint feed line, and a paint spray nozzle at a terminal end of the paint feed line. The separating element is actively held in the first receiver station while paint of a first color is supplied through the paint feed line and sprayed from the nozzle onto a workpiece. To switch to a paint of a second color, the supply of the first paint is terminated, the separating element is released from the first receiver station, and a pushing medium pushes the separating element through the paint feed line, while residual paint is pushed from the paint feed line out through the spray nozzle. The separating element forms a sealing barrier between the pushing medium and the residual paint. Sensors detect the arrival of the separating element in the second receiver station, and the flow of pushing medium is terminated to avoid spraying the pushing medium out through the spray nozzle. Then a pushing medium pushes the separating element back into the first receiver station.