Abstract:
This invention relates to a method and a power plant controller arranged to carry out the method. The method is on an intelligent dispatching of the power production to wind turbines and optional compensation equipment of a wind power plant, as the power producing units of a wind power plant. The invention relates to a case where the requested produced power (both active and reactive) is less than the total capacity of the power plant, and the invention relates to utilizing this situation to dispatch set points to the wind turbines and the compensation equipment based on correction factors relating to the operating conditions of the wind park. This method may increase the wind turbines' life time, help in scheduling maintenance and expand the electrical operating range of the wind power plant.
Abstract:
To identify abnormal behavior in a turbine blade, a failure detection system generates a “fingerprint” for each blade on a turbine. The fingerprint may be a grouping a dynamic, physical characteristics of the blade such as its mass, strain ratio, damping ratio, and the like. While the turbine is operating, the failure detection system receives updated sensor information that is used to determine the current characteristics of the blade. If the current characteristics deviate from the characteristics in the blade's fingerprint, the failure detection system may compare the characteristics of the blade that deviates from the fingerprint to characteristics of another blade on the turbine. If the current characteristics of the blade are different from the characteristics of the other blade, the failure detection system may change the operational mode of the turbine such as disconnecting the turbine from the utility grid or stopping the rotor.
Abstract:
This invention relates to a method and a power plant controller arranged to carry out the method. The method is on an intelligent dispatching of the power production to wind turbines and optional compensation equipment of a wind power plant, as the power producing units of a wind power plant. The invention relates to a case where the requested produced power is less than the total capacity of the power plant, and the invention relates to utilizing this situation to dispatch set points to the wind turbines and the compensation equipment in a flexible way. This flexibility may increase the wind turbines' life time, help in scheduling maintenance and expand the electrical operating range of the wind power plant. The determination of the set points on active and reactive power is a combined determination of both set points for each of the energy producing units of the wind power plant.
Abstract:
This invention relates to a method and a power plant controller arranged to carry out the method. The method is on an intelligent dispatching of the power production to wind turbines and optional compensation equipment of a wind power plant, as the power producing units of a wind power plant. The invention relates to a case where the requested produced power is less than the total capacity of the power plant, and the invention relates to utilizing this situation to dispatch set points to the wind turbines and the compensation equipment in a flexible way. This flexibility may increase the wind turbines' life time, help in scheduling maintenance and expand the electrical operating range of the wind power plant. The determination of the set points on active and reactive power is a combined determination of both set points for each of the energy producing units of the wind power plant.