摘要:
A post-installed sleeve device is provided for compensating loss of shear capacity of a concrete slab due to a hole drilled in the concrete slab. The sleeve device includes a hollow member of, for example, a cylindrical shape, and a lower sandwich member and an upper sandwich member shaped, for example, as ring members. The hollow member is inserted into the drilled hole such that an upper section of the hollow member extends above a top surface of the concrete slab. The lower sandwich member includes an inner edge rigidly attached to a bottom edge of the hollow member. The upper sandwich member includes an inner edge engageably connected to the upper section of the hollow member. The upper sandwich member and the lower sandwich member sandwich the concrete slab surrounding the drilled hole therebetween for compensating the lost shear capacity of the concrete slab due to the drilled hole.
摘要:
The induced macro-cell corrosion prevention method includes the step of replacing a corroded or chloride-contaminated section of a steel reinforcement or rebar in steel-reinforced concrete with a new rebar section free of chloride. A non-conductive insulating buffer is placed between the end sections of the new rebar and the corresponding end sections of adjacent chloride-contaminated rebar sections in order to form a non-conductive layer between the new steel and the old steel. This prevents or substantially reduces formation of a macro-cell that would cause a galvanic reaction to occur and increase corrosion potential.
摘要:
A method and system for covering industrial wood plank or wood block floors that can be installed quickly without creating a hazardous environment or hazardous wastes and without the necessity of removing installed equipment. Sand is swept over the wood to fill voids and cracks. Next metal lath is stapled to the wood. A first layer of epoxy is poured onto the metal lath. After this is dry, a second coat of finish epoxy, possibly colored as desired, can be installed on the first epoxy layer. When this dries, the job is done and operations can be restarted. The epoxy material used can be self-leveling for ease of application and the final floor is approximately level. In a particular embodiment, a layer of plastic can be placed over the floor before the lath is installed, and in another embodiment, the second layer of epoxy can be omitted.
摘要:
The present invention includes a set of reinforcement and support devices for existing or new roof, ceiling and/or floor systems together with numerous variations that may be installed into existing buildings or new buildings to help prevent separation of wood or metal roof, ceiling and/or floor systems from the concrete, masonry or other types of walls supporting these systems in commercial, industrial and/or residential buildings. One embodiment includes a set of three brackets that are installed in a triangularly shaped arrangement along a side of a primary support beam and to the wall underneath a ledger, thus anchoring the support beam to the wall of the structure and stabilizing the roof, ceiling or floor it supports. Another embodiment includes a single integrated unit that attaches to the wall underneath the ledger and to an adjacent support board, thus anchoring the support board (and the system it supports) to the wall of the structure. Another embodiment includes an angle iron with predrilled holes that attaches through the ledger directly to the wall to reinforce the ledger and extend the area of horizontal support provided by the ledger. Other embodiments provide support structures that may be attached and arranged to provide specific structural support at designated locations, and/or to provide wall-to-wall structural support across the span of a roof, ceiling or floor. All embodiments may be adapted for use with ceilings, roofs or floors.
摘要:
A spring-loaded post extension for resilient support of ceiling grids during seismic events. The post extension includes a fixed cylindrical housing and a movable spring-biased assembly, axially coincident therewith. The housing is connected to the side of a fixed support post. The assembly includes a support tube extending partly within the lower end of the cylindrical housing. The bottom of the support tube is connected to a ceiling grid junction. A threaded rod has an upper portion extending above the upper end of the housing, and a lower portion extending through the housing to connect to the top of the support tube. An exterior spring fits over the upper portion of the rod, and an interior spring fits over the lower portion of the rod. Nuts on the rod provide means to tension both springs into slight compression, defining a spring-biased normal position for the support tube.
摘要:
A building structure having at least one storey including at least one column; at least one brace attached at one end to one side of at least one of the columns and at a second end to a fixed foundation surface; the brace attached to the at least one column at an incline; the at least one brace having a first portion and a second portion; wherein the at least one brace has a first in-use configuration in which the first portion is freely moveable with respect to the second portion such that a gap is formed in the brace preventing the transmission of force axially along the brace by preventing tensional forces from travelling axially along the brace, and a second in-use configuration in which the gap is closed by the first portion and the second portion being in contact to permit the transmission of forces axially along the brace; and wherein the second in-use configuration allows compressive forces to be transmitted along the brace such that the brace is activated when sufficient deformation occurs in the column in a direction that compresses the brace; and further comprising at least one damper functionally connected to one or both of the first and second portions and configured to provide damping as the at least one brace moves from the first in-use configuration to the second in-use configuration.
摘要:
A composite membrane of wood floor diaphragm for construction of new buildings and strengthening of existing buildings to provide improved load transfer capacity and enhanced resistance to gravity and lateral loads, such as earthquake and/or wind for buildings with wood floor framing. The aforementioned composite membrane is a system, comprised of four-way interlocking mosaic end grain parquet floor attached to a plywood subfloor beneath. A floor to floor sound blocking barrier that can operate in high eighty decibel and above range may preferably be installed under the subfloor.
摘要:
A method is provided for reinforcing concreted plates in the region of support elements with reinforcement elements, which are each composed of a longitudinally stable, bendable, strap-like base body with two loops. A bore is made in the concreted plate for each reinforcement element. The end region of the bore remote from the pressure-side surface of the concreted plate is drilled out and the one loop of the reinforcement element is pressed together and is led through the bore until this loop has reached the drilled-out hole and expands. The bore is filled with a mortar-type mass. The other loop of the reinforcement element is fixed with an anchor head, which supports itself on the pressure-side surface of the concreted plate.
摘要:
A method is provided for reinforcing concreted plates in the region of support elements with reinforcement elements, which are each composed of a longitudinally stable, bendable, strap-like base body with two loops. A bore is made in the concreted plate for each reinforcement element. The end region of the bore remote from the pressure-side surface of the concreted plate is drilled out and the one loop of the reinforcement element is pressed together and is led through the bore until this loop has reached the drilled-out hole and expands. The bore is filled with a mortar-type mass. The other loop of the reinforcement element is fixed with an anchor head, which supports itself on the pressure-side surface of the concreted plate.
摘要:
A method and system for covering industrial wood plank or wood block floors that can be installed quickly without creating a hazardous environment or hazardous wastes and without the necessity of removing installed equipment. Sand is swept over the wood to fill voids and cracks. Next metal lath is stapled to the wood. A first layer of epoxy is poured onto the metal lath. After this is dry, a second coat of finish epoxy, possibly colored as desired, can be installed on the first epoxy layer. When this dries, the job is done and operations can be restarted. The epoxy material used can be self-leveling for ease of application and the final floor is approximately level. In a particular embodiment, a layer of plastic can be placed over the floor before the lath is installed, and in another embodiment, the second layer of epoxy can be omitted.