摘要:
An adapter component capable of connecting to a connector component, and an adapter execution unit for accepting an execution request from an EAI system to initiate the adapter component are provided as an adapter program. With these components, data outputted from the EAI system is received as input, and converted into a format available for the connector component. The converted data is outputted to the connector component.
摘要:
A method of associating two components in an object-oriented includes generating a component information management table. A first component refers to a second component deployed in a component execution module, the first component including component information on the second component. The management table includes the component information and a physical component name of the second component. The component information includes an external interface name and description of the second component. The physical component name of the second component is retrieved from the component information management table using the component information stored in the first component. The physical component name of the second component obtained from the retrieving step is associated with a logical component name stored in the first component.
摘要:
A prediction method for predicting a computer-resource usage amount with the use of a service call relation to be extracted from a business process definition. A resource allocation method includes, before adding a new business process to the system, steps of calculating the computer-resource predicted usage amount by using a computer-resource usage amount prediction step and of allocating a computer, as a new service execution computer, to a service execution computer whose computer-resource predicted usage amount has exceeded a predetermined value, the computer being different from the service execution computer.
摘要:
A prediction method for predicting a computer-resource usage amount with the use of a service call relation to be extracted from a business process definition. A resource allocation method includes, before adding a new business process to the system, steps of calculating the computer-resource predicted usage amount by using a computer-resource usage amount prediction step and of allocating a computer, as a new service execution computer, to a service execution computer whose computer-resource predicted usage amount has exceeded a predetermined value, the computer being different from the service execution computer.
摘要:
It is checked, by referring to a deployment descriptor and type information of a component, whether the calling convention to be used by a caller component is the same as the calling convention to be used by a callee component, and if different, a class and an object of a proxy for performing a calling convention transformation process is generated.
摘要:
A furnace to flame-resistantly treat a precursor fiber strand by sending hot air to a heat treatment chamber through a hot air blowing nozzle in a direction parallel to a running direction of the strand is provided. The hot air passes through a porous plate and a rectifying member satisfying the following conditions: (1) A/B≧4.0; (2) 0.15≦α≦0.35; (3) 0≦B−d≦20; and (4) 80% or more of the area of one opening of the porous plate when facing surfaces of the porous plate and the rectifying member overlap is included in one opening of the rectifying member, where A is the rectifying member hot air passage distance (mm), B is a horizontal maximum distance (mm) of one opening of the rectifying member, α is a rate of hole area of the porous plate, and d is the porous plate equivalent diameter (mm).
摘要:
A loom, containing a first and second fill yarn-holding conveyor rods which are disposed at left and right sides of an opening formed by multiple side-by-side warp yarns that run in one direction at a prescribed speed and are repeatedly inserted into the opening toward center of a weaving width and withdrawn, a single fill yarn conveyor selectively gripped by the ends of the first or second fill yarn-holding conveyor rod, a first and second rod operating units which cause the first and the second fill yarn-holding conveyor rods to be inserted into the opening in a synchronized state and to be withdrawn from the opening, and a first and second fill yarn conveyor gripping and releasing units which are fixed to opposite ends of the first and the second fill yarn-holding conveyor rods and alternately repeat operations of gripping, releasing, and delivering the fill yarn conveyor.
摘要:
The loom comprises: a first and a second fill yarn-holding conveyor rods (14,15), which are disposed to the left and the right of an opening formed by multiple side-by-side warp yarns (Wa) that run in one direction at a prescribed speed and which rods are repeatedly and simultaneously inserted into the opening toward the center of the weaving width and withdrawn; and a single fill yarn conveyor (16) that is selectively gripped by the ends of the rods that face same and is alternately held and conveyed by the first or second fill yarn-holding conveyor rod (14,15). By operating a first and a second rod-operating units (19,20), a first and a second gripping/releasing parts (17,18) are operated via the first and the second fill yarn-holding conveyor rods (14,15) to alternately transfer the fill yarn conveyor (16) at the center of the weaving width, and after the transfer, are shuttled between the entrance of the opening and the center of the weaving width. The invention reliably separates the warp yarns and makes possible increased rates of fill yarn insertion using a linear motor or the like without raising a nap on the precursor fibers configuring the fiber bundles.
摘要:
Switching process at the occurrence of a path trouble is performed more quickly to reduce the number of packet discards during a traffic transition from a currently used system path to a standby system path within a section to be protected. An OLT (210-W) refers to the DBA information of a PON section and, if receiving no CCM frame at a timing at which the same should be received, then determines that some trouble has occurred on the path (S801) and transmits, to an OAM-compliant NE (200-Z), an application-for-switching frame (1501) to notify the OAM-compliant NE (200-Z) of the abnormal condition. The OAM-compliant NE (200-Z) monitors the occurrence of the trouble within the PON section nearly in real time, starts a switching process (S802) and generates and transmits a standby-system delivery request (321) (S302, S803). An OAM-compliant NE (200-A) switches the communication path to the standby-system passing through an OLT (210-P).
摘要:
A copper-clad laminate is composed of a copper foil and an aromatic polyimide film placed thereon, in which the copper foil is bonded to the polyimide film at a bonding strength of ≧500 N/m and the polyimide film shows a light transmittance of ≧40% for a light of wavelength of 600 nm and a haze of ≧30% [the light transmittance and haze are values measured after the copper foil is removed by etching].