Power plant
    91.
    发明授权
    Power plant 失效
    发电厂

    公开(公告)号:US08695347B2

    公开(公告)日:2014-04-15

    申请号:US13146672

    申请日:2010-01-19

    IPC分类号: F01K7/34 F01K13/02

    CPC分类号: F01K7/38 F01K7/44 F22D1/32

    摘要: A boiling water nuclear power plant supplies steam from a reactor to high-pressure and low-pressure turbines. Feed water generated by condensing steam in a condenser is heated by low-pressure and high-pressure feed water heaters and supplied to the reactor. The steam discharged from the low-pressure turbine is compressed by a steam compressor and supplied to one of the low-pressure feed water heaters to heat feed water. The steam extracted from the low-pressure turbine is supplied to the low-pressure feed water heater. When power required for the steam compressor is Q1, heat energy supplied from the steam compressor is Q3, a coefficient of performance of the steam compressor is COP (=Q3/Q1), and a thermal efficiency of the boiling water nuclear power plant is η, the steam compression apparatus is connected to a position in a main steam system and to the feed water heater so as to satisfy COP−1/η>0.

    摘要翻译: 沸水核电站从反应堆向高压和低压涡轮机供应蒸汽。 通过在冷凝器中冷凝蒸汽产生的给水由低压和高压给水加热器加热并供应到反应器。 从低压涡轮机排出的蒸汽被蒸汽压缩机压缩并供给至一个低压给水加热器以加热供水。 从低压涡轮机提取的蒸汽被供给到低压给水加热器。 当蒸汽压缩机所需的功率为Q1时,从蒸汽压缩机供应的热能为Q3,蒸汽压缩机的性能系数为COP(= Q3 / Q1),沸水核电站的热效率为 蒸汽压缩装置连接到主蒸汽系统和给水加热器中的位置,以满足COP-1 /&e> 0。

    Display control apparatus and method, and program
    92.
    发明授权
    Display control apparatus and method, and program 有权
    显示控制装置及方法及程序

    公开(公告)号:US08228285B2

    公开(公告)日:2012-07-24

    申请号:US12452087

    申请日:2009-04-16

    IPC分类号: G09G3/36

    摘要: The present invention relates to a display control apparatus and method, and a program which make it possible to suppress deterioration in the image quality of an image.A backlight luminance calculating section (121) finds the backlight luminance of light to be radiated by a backlight, on the basis of the image signal of an image. A subtraction section (142) finds the difference between the backlight luminance from the backlight luminance calculating section (121), and a backlight luminance from an addition section (141). A multiplication section (143) multiplies the found difference by a cyclic coefficient indicating the degree of contribution of the difference to correction of the backlight luminance, obtaining a correction value. The addition section (141) adds the correction value to the backlight luminance to correct the backlight luminance. Also, from the image signal and the backlight luminance, a division section (124) calculates the transmittance of light in a liquid crystal panel that displays an image by transmitting light from the backlight. The present invention can be applied to a liquid crystal display apparatus.

    摘要翻译: 显示控制装置和方法技术领域本发明涉及可以抑制图像的图像质量劣化的显示控制装置和方法以及程序。 背光源亮度计算部(121)根据图像的图像信号,求出背光照射的光的背光亮度。 减法部(142)从背光源亮度计算部(121)求出背光亮度与来自加法部(141)的背光亮度的差。 乘法部(143)将所发现的差乘以表示差异的贡献度与背光亮度的校正的循环系数,得到校正值。 加法部分(141)将校正值与背光亮度相加以校正背光亮度。 此外,从图像信号和背光源亮度,分割部(124)通过透过来自背光的光来计算显示图像的液晶面板中的光的透射率。 本发明可以应用于液晶显示装置。

    Power Plant
    93.
    发明申请
    Power Plant 失效
    发电厂

    公开(公告)号:US20110283704A1

    公开(公告)日:2011-11-24

    申请号:US13146672

    申请日:2010-01-19

    IPC分类号: F01K19/02

    CPC分类号: F01K7/38 F01K7/44 F22D1/32

    摘要: A boiling water nuclear power plant supplies steam from a reactor to high-pressure and low-pressure turbines. Water (feed water) generated by condensing steam in a condenser is heated by low-pressure and high-pressure feed water heaters and supplied to the reactor. The steam discharged from the low-pressure turbine is compressed by a steam compression apparatus (a heat pump) and supplied to one of the low-pressure feed water heaters to heat feed water. The steam extracted from the low-pressure turbine is also supplied to the low-pressure feed water heater. When power required for the steam compression apparatus is Q1, heat energy supplied from the steam compression apparatus is Q3, a coefficient of performance of the steam compression apparatus is COP )(=Q3/Q1), and a thermal efficiency of the boiling water nuclear power plant is η, the steam compression apparatus is connected to a position in a main steam system and to the feed water heater so as to satisfy COP−1/η>0. This power plant can improve the thermal efficiency of the plant in power uprating.

    摘要翻译: 沸水核电站从反应堆向高压和低压涡轮机供应蒸汽。 通过冷凝器中的蒸汽冷凝而产生的水(给水)由低压和高压给水加热器加热并供给反应器。 从低压涡轮机排出的蒸汽被蒸汽压缩装置(热泵)压缩,供给到一个低压给水加热器,以加热供水。 从低压涡轮机提取的蒸汽也被供给到低压给水加热器。 当蒸汽压缩装置所需的功率为Q1时,从蒸汽压缩装置供给的热能为Q3,蒸汽压缩装置的性能系数为COP)(= Q3 / Q1),沸水核的热效率 动力装置,蒸汽压缩装置连接到主蒸汽系统和给水加热器中的位置,以满足COP-1 /&e>> 0。 该发电厂可以提高电厂升压的热效率。

    DISPLAY CONTROL APPARATUS AND METHOD, AND PROGRAM
    95.
    发明申请
    DISPLAY CONTROL APPARATUS AND METHOD, AND PROGRAM 有权
    显示控制装置及方法及程序

    公开(公告)号:US20100134527A1

    公开(公告)日:2010-06-03

    申请号:US12452336

    申请日:2009-05-08

    IPC分类号: G09G5/10

    摘要: The present invention relates to a display control apparatus and method, and a program which make it possible to prevent deterioration in image quality due to insufficient luminance of light from a backlight.A backlight luminance calculating section (121) finds the backlight luminance of light to be radiated by a backlight, on the basis of the image signal of a display image. A moving image determining section (122) determines whether or not the display image is a moving image on the basis of the image signal. A correction value calculating section (123) increases the last correction value by a predetermined value to obtain a new correction value when the display image is a moving image, and decreases the last correction value by a predetermined value to obtain a new correction value when the display image is a still image. An addition section (124) adds the correction value to the backlight luminance to correct the backlight luminance. The present invention can be applied to a liquid crystal display apparatus.

    摘要翻译: 显示控制装置和方法技术领域本发明涉及一种能够防止来自背光源的光的亮度不足导致的图像质量劣化的显示控制装置和方法。 基于显示图像的图像信号,背光源亮度计算部(121)根据背光来求出要照射的光的背光亮度。 运动图像确定部分(122)基于图像信号确定显示图像是否是运动图像。 校正值计算部分(123)将最后一个校正值增加预定值,以便当显示图像是运动图像时获得新的校正值,并且将最后校正值减小预定值以获得新的校正值,当 显示图像是静止图像。 加法部分(124)将校正值与背光亮度相加以校正背光亮度。 本发明可以应用于液晶显示装置。

    DISPLAY CONTROL APPARATUS AND METHOD, AND PROGRAM
    96.
    发明申请
    DISPLAY CONTROL APPARATUS AND METHOD, AND PROGRAM 有权
    显示控制装置及方法及程序

    公开(公告)号:US20100127964A1

    公开(公告)日:2010-05-27

    申请号:US12452087

    申请日:2009-04-16

    IPC分类号: G09G3/36

    摘要: The present invention relates to a display control apparatus and method, and a program which make it possible to suppress deterioration in the image quality of an image.A backlight luminance calculating section (121) finds the backlight luminance of light to be radiated by a backlight, on the basis of the image signal of an image. A subtraction section (142) finds the difference between the backlight luminance from the backlight luminance calculating section (121), and a backlight luminance from an addition section (141). A multiplication section (143) multiplies the found difference by a cyclic coefficient indicating the degree of contribution of the difference to correction of the backlight luminance, obtaining a correction value. The addition section (141) adds the correction value to the backlight luminance to correct the backlight luminance. Also, from the image signal and the backlight luminance, a division section (124) calculates the transmittance of light in a liquid crystal panel that displays an image by transmitting light from the backlight. The present invention can be applied to a liquid crystal display apparatus.

    摘要翻译: 显示控制装置和方法技术领域本发明涉及可以抑制图像的图像质量劣化的显示控制装置和方法以及程序。 背光源亮度计算部(121)根据图像的图像信号,求出背光照射的光的背光亮度。 减法部(142)从背光源亮度计算部(121)求出背光亮度与来自加法部(141)的背光亮度的差。 乘法部(143)将所发现的差乘以表示差异的贡献度与背光亮度的校正的循环系数,得到校正值。 加法部分(141)将校正值与背光亮度相加以校正背光亮度。 此外,从图像信号和背光源亮度,分割部(124)通过透过来自背光的光来计算显示图像的液晶面板中的光的透射率。 本发明可以应用于液晶显示装置。

    Reformed-Fuel-Burning Gas Turbine System and Method of Operating the Same
    98.
    发明申请
    Reformed-Fuel-Burning Gas Turbine System and Method of Operating the Same 有权
    改革燃油燃气轮机系统及其运行方法

    公开(公告)号:US20070283701A1

    公开(公告)日:2007-12-13

    申请号:US11760144

    申请日:2007-06-08

    IPC分类号: F02C6/18

    摘要: The present invention provides a reformed-fuel-burning gas turbine system that constantly generates good-quality reformed fuel even when heavy fuel has a different composition. The reformed-fuel-burning gas turbine system according to the present invention comprises a heavy oil heater; a water heater; a reformer vessel for mixing high-temperature, high-pressure water with high-temperature, high-pressure heavy oil to cause a hydrothermal reaction and producing reformed fuel from heavy oil; and a gas turbine which operates on the reformed fuel. The reformed-fuel-burning gas turbine system according to the present invention further comprises a detector for detecting the static dielectric constants or solubility of high-temperature, high-pressure heavy oil heated by the heavy oil heater and high-temperature, high-pressure water heated by the water heater; a first temperature regulating valve for adjusting the thermal dose of the heavy oil heater; a second temperature regulating valve for adjusting the thermal dose of the water heater; and a control device for adjusting the first temperature regulating valve and the second temperature regulating valve in accordance with the static dielectric constants or solubility of the heavy oil and water, which are detected by the detector, in order to control the static dielectric constants or solubility of the high-temperature, high-pressure heavy oil and high-temperature, high-pressure water, which are to be supplied to the reformer vessel.

    摘要翻译: 本发明提供了一种重燃燃料燃气轮机系统,其即使在重型燃料具有不同组成的情况下,也不断地生产优质改质燃料。 根据本发明的改质燃料燃烧燃气轮机系统包括重油加热器; 一个热水器 用于将高温高压水与高温高压重油混合的重整器容器进行水热反应并从重油中产生重整燃料; 以及在重整燃料上操作的燃气轮机。 根据本发明的重燃燃料燃气轮机系统还包括检测器,用于检测由重油加热器加热的高温高压重油的静态介电常数或溶解度,以及高温高压 热水器加热水; 用于调节重油加热器的热剂量的第一温度调节阀; 第二温度调节阀,用于调节热水器的热剂量; 以及用于根据由检测器检测的重油和水的静态介电常数或溶解度来调节第一温度调节阀和第二温度调节阀的控制装置,以便控制静态介电常数或溶解度 的高温高压重油和高温高压水,供给重整器容器。

    Thermoplastic polyurethane molding and manufacturing method thereof
    100.
    发明申请
    Thermoplastic polyurethane molding and manufacturing method thereof 审中-公开
    热塑性聚氨酯成型及其制造方法

    公开(公告)号:US20070093631A1

    公开(公告)日:2007-04-26

    申请号:US10559343

    申请日:2004-04-19

    IPC分类号: C08G18/00

    CPC分类号: C08G18/00

    摘要: The thermoplastic polyurethane molding of the present invention is obtained by melting, molding, cooling and solidifying, subsequently heating to a temperature T1 (specifically, 180 to 190° C) that is not more than flow starting temperature Tm and not less than glass transition point Tg and cooling down quickly to a temperature T2 (Tm>T1>T2>Tg, specifically, 160 to 165° C.). In dynamic viscoelasticity measurement, the difference between the temperature at which LogE′ turns 4.5 MPa and the peak temperature of tan δ is 190 to 225° C.

    摘要翻译: 本发明的热塑性聚氨酯成型体通过熔融,成型,冷却固化,随后加热至不高于流动起始温度Tm且不小于玻璃化转变温度的温度T 1(具体地,180至190℃) 点Tg并快速冷却至温度T 2(Tm> T 1> T 2> Tg,具体地,160至165℃)。 在动态粘弹性测量中,LogE'变为4.5MPa的温度与tanδ的峰值温度之差为190〜225℃。