PROCESS SCHEDULING SYSTEM, METHOD, AND PROGRAM
    91.
    发明申请
    PROCESS SCHEDULING SYSTEM, METHOD, AND PROGRAM 有权
    过程调度系统,方法和程序

    公开(公告)号:US20120078407A1

    公开(公告)日:2012-03-29

    申请号:US13320406

    申请日:2010-05-06

    Abstract: System, method and computer program product for combined scheduling of two different slab sequences by a rational technique. A two-dimensional grid graph having a direct slab sequence as a first dimension and an inventory slab sequence as a second dimension is prepared by processing of a computer as a data structure represented on a memory or a hard disk drive of the computer. A processing program of the computer generates two child nodes corresponding to a direct slab and an inventory slab, in each node of the two-dimensional graph according to a predetermined algorithm. By defining an appropriate weighting function, the processing program of the computer weights edges between nodes in the two-dimensional grid graph. After forming the weighted graph on a storage device of the computer such as the memory or the hard disk drive, the processing program of the computer calculates a path from a start point to an end point as a shortest path search problem.

    Abstract translation: 通过合理的技术对两种不同板块序列进行组合调度的系统,方法和计算机程序产品。 通过将计算机作为在计算机的存储器或硬盘驱动器上表示的数据结构的处理来制备具有作为第一维的直接平板序列和作为第二维的库存板序列的二维网格图。 计算机的处理程序根据预定算法在二维图形的每个节点中生成对应于直接平板和库存板块的两个子节点。 通过定义适当的加权函数,计算机的处理程序在二维网格图中的节点之间加权边缘。 在诸如存储器或硬盘驱动器的计算机的存储设备上形成加权图之后,计算机的处理程序计算从起始点到终点的路径作为最短路径搜索问题。

    APPARATUS FOR CONTINUOUS STRIP CASTING
    92.
    发明申请
    APPARATUS FOR CONTINUOUS STRIP CASTING 有权
    连续条纹铸造设备

    公开(公告)号:US20110253336A1

    公开(公告)日:2011-10-20

    申请号:US13170394

    申请日:2011-06-28

    CPC classification number: B22D11/0622 B21B1/463 B22D11/1206 B22D11/14

    Abstract: An apparatus for continuously casting thin strip includes a caster having a pair of casting rolls having a nip there between capable of delivering cast strip downwardly from the nip and an first enclosure capable of forming a protective atmosphere into which the strip can be formed in loop to extend over a plurality of rollers into pinch rolls with the strip having a strain of less than 0.4%, which may be provided by a plurality of rollers at entry of the strip into the pinch rolls to carry the strip into the pinch rolls, with at least a first entry roller having a diameter between 200 and 650 millimeters and being below a majority of other rollers.

    Abstract translation: 用于连续铸造薄带的装置包括具有一对铸辊的脚轮,其具有能够从压区向下输送铸造带的第一外壳和能够形成环状的保护气氛的第一外壳 在多个辊子上延伸到夹送辊中,带材具有小于0.4%的应变,其可以由条带进入夹送辊中的多个辊子提供,以将带材带入夹送辊中,其中在 至少一个直径在200和650毫米之间并且低于其它辊的大部分的第一进入辊。

    Method for continuous casting of steel and electromagnetic stirrer to be used therefor
    93.
    发明授权
    Method for continuous casting of steel and electromagnetic stirrer to be used therefor 有权
    用于连续铸造钢和电磁搅拌器的方法

    公开(公告)号:US08033319B2

    公开(公告)日:2011-10-11

    申请号:US12913290

    申请日:2010-10-27

    CPC classification number: B22D11/122 B22D11/115 B22D11/1206

    Abstract: Disclosed is a continuous casting in which an electromagnetic stirrer is installed upstream, in the casting direction, of the reduction rolling position of a slab, and in which a slab with a liquid core is reduced in thickness, wherein by imparting a collision flow forming-type stirring and a uni-directional alternating flow forming-type stirring, molten steel with concentrated segregation elements is stirred and diffused in a width-wise direction of slab, whereby a slab stabilized in center segregation qualities can be produced over long-time casting operation. Since the stirring flowing pattern is selectively imparted by means of the same electromagnetic stirrer, it is effective to decrease facility and equipment costs, improve maintainability, and extensively cope with various casting conditions. The continuous casting method stably ensures excellent center segregation qualities over a long time in casting of high-strength steel with high crack susceptibility or steel grade for extremely thick plate product.

    Abstract translation: 公开了一种连续铸造,其中电磁搅拌器沿铸造方向安装在板坯的压下轧制位置的上游,并且其中具有液芯的板坯的厚度减小,其中通过使冲击流形成 - 单向搅拌和单向交替流动式搅拌,具有浓缩偏析元素的钢水在板坯的宽度方向上搅拌扩散,由此可以通过长时间的铸造操作生产稳定中心偏析品质的板坯 。 由于通过相同的电磁搅拌器选择性地施加搅拌流动模式,因此降低设备成本和提高维护性以及广泛地应对各种铸造条件是有效的。 连续铸造方法在极高的板材产品的高裂纹敏感性或钢级的高强度钢的铸造中,长时间稳定地确保优异的中心偏析性。

    METHOD AND DEVICE FOR POSITIONING AT LEAST ONE ROLL SEGMENT OF A STRAND GUIDING UNIT AGAINST A STRAND

    公开(公告)号:US20110214835A1

    公开(公告)日:2011-09-08

    申请号:US13107771

    申请日:2011-05-13

    CPC classification number: B22D11/1206 B22D11/16 B22D11/208

    Abstract: A method for adjusting a roll segment of a strand guide of a slab-casting installation against a strand, wherein the roll segment has an upper and a lower roll support that each have an adjusting element for adjusting the two roll supports relative to each other. The method includes individual control of the individual adjusting elements, wherein the actual profile of the strand, including the heights of the right and left lateral edges of the strand, is detected and compared with a set profile that includes a predetermined set height, which is the same for the right and left lateral edges, and the individual adjusting elements of the roll segment are individually controlled based on the control deviation that results from the comparison so that the actual profile is adapted to the set profile, including equalization of the heights of the right and left lateral edges of the strand.

    Method and device for manufacturing a metal strip by means of continuous casting and rolling
    95.
    发明授权
    Method and device for manufacturing a metal strip by means of continuous casting and rolling 失效
    通过连续铸造和轧制制造金属带的方法和装置

    公开(公告)号:US08011418B2

    公开(公告)日:2011-09-06

    申请号:US12733271

    申请日:2008-08-21

    Abstract: A method of manufacturing a metal strip includes casting a slab (3) or preliminary strip (3′) in a casting machine (2) and subsequently rolling the cast slab (3) or preliminary strip (3′) in at least one rolling train (4, 5) in a first operating mode with the at least one rolling train being connected with the casting machine for continuously manufacturing the metal strip, and in a second operating mode removing the cast slab (3) or preliminary strip (3′) from the main transport line (6) with a shuttle system arranged between the casting machine (2) and the at least one rolling train (4, 5), storing the removed slab (3) or preliminary strip (3′), and subsequently transporting the removed slab (3) or preliminary strip back into the main transport line, with the removed slab (3) or preliminary strip (3′) being heated to a desired temperature or maintained at a desired temperature prior to the transport back into the main transport line (6) for discontinuously manufacturing the metal strip.

    Abstract translation: 一种制造金属条的方法包括在铸造机(2)中铸造板坯(3)或初步条带(3'),随后在至少一个轧制列车中轧制铸造板坯(3)或预制钢带(3') (4,5),其中所述至少一个轧制系统与所述铸造机连接以连续地制造所述金属带,并且在第二操作模式中,移除所述铸造板(3)或预备条(3'), 从主输送管线(6)与布置在铸造机(2)和至少一个轧制列车(4,5)之间的梭系统,存储所取出的板坯(3)或初步条带(3'),随后 将移除的板坯(3)或初步带材运送回主输送线路中,将被移除的板坯(3)或初步条带(3')加热至所需温度或保持在所需温度,然后再运回 主要运输线(6)不连续制造 金属条。

    Process and a plant for the production of metal strip
    96.
    发明授权
    Process and a plant for the production of metal strip 有权
    工艺和生产金属带的工厂

    公开(公告)号:US07954539B2

    公开(公告)日:2011-06-07

    申请号:US12450290

    申请日:2008-03-20

    Abstract: A process and an ultracompact plant for the endless production of hot rolled steel strip comprising an ingot mold (15) that produces a very thin slab, having narrow sides with thickness in the range between 40 and 55 mm and a central swelling, at a speed in the range between 4 and 16 m/min. Such a slab, which displays a core in which the steel is still liquid, is passed through a vertical pre-rolling device (16) that reduces the thickness of the slab and flattens it. The solidified slab may thus be subjected to a first mild rolling by a conveyor (17) and, by forming a free curve, takes a horizontal position where it is subjected to a first surface descaling, a first rolling, a heating in an inductor (23), a second surface descaling and a series of reductions in a rolling mill (30) formed by at least two stands, by maintaining its temperature along the mill above the recrystallization point Ar3. Downstream of the rolling mill (30) there are provided a roller runway with cooling showers, a flying shear (33) for cutting to length the strip produced, pinch rolls and at least two spinning wheels (34) for the formation of coils of the hot rolled strip.

    Abstract translation: 一种用于无限制生产热轧钢带的方法和一种超紧凑型工厂,包括铸锭模具(15),其制造非常薄的板坯,其厚度在40和55mm之间的窄边和中心膨胀 在4和16米/分钟之间的范围内。 这种显示钢仍然是液体的芯的板坯通过垂直的预轧装置(16),从而减小了板坯的厚度并使其平坦化。 因此,凝固的板坯可以通过输送机(17)进行第一次轻度轧制,并且通过形成自由曲线取水平位置,在其中进行第一表面除鳞,第一轧制,电感器中的加热 23),由至少两个支架形成的轧机(30)的第二表面除鳞和一系列减少,通过将其沿着轧机的温度保持在再结晶点Ar3上方。 在轧机(30)的下游设置有具有冷却淋浴器的滚轮跑道,用于切割所生产的带材的卷轴剪切(33),夹送辊和至少两个旋转轮(34),用于形成 热轧带钢。

    PROCESS AND APPARATUS FOR A COMBINED CASTING AND ROLLING INSTALLATION
    97.
    发明申请
    PROCESS AND APPARATUS FOR A COMBINED CASTING AND ROLLING INSTALLATION 有权
    组合铸造和轧制安装的工艺和装置

    公开(公告)号:US20110056649A1

    公开(公告)日:2011-03-10

    申请号:US12936218

    申请日:2009-03-04

    Abstract: A method and an apparatus for producing hot-rolled products in a combined casting-rolling installation. A method and a combined casting-rolling installation with which an uninterrupted continuous casting process can be maintained not only when there is a planned interruption to production but also when there is an unplanned interruption to production, occurring for example in a heating zone, a finishing mill train, a cooling zone or a storage device. This method steps are carried out to bridge an interruption in production in the part of the installation that is downstream of the cutting-up and delivering device (6): a) cutting off a strand portion (21) of the continuously produced preliminary material (3) by means of a first shears (9); b) raising the tail part of the strand portion (21) from the roller table (4) by means of a raising device (11); c) breaking up the preliminary material (3) passing the first shears (9) into pieces of scrap (19) by means of the first shears (9)into pieces of scrap (19) by means of the first shears (9), delivering the pieces of scrap (19) and removing the strand portion (21) unit the operational readiness of the combined casting-rolling installation is restored.

    Abstract translation: 一种用于在组合式轧制设备中生产热轧产品的方法和设备。 一种方法和组合的铸造轧制装置,不仅在生产计划中断时也可以维持不间断的连续铸造工艺,而且当存在例如在加热区域中发生的计划外的生产中断时, 磨坊,冷却区或存储设备。 执行该方法步骤以弥补在切割和传送装置(6)下游的安装部分中的生产中断:a)切断连续生产的预备材料的股线部分(21) 3)通过第一剪(9); b)通过升高装置(11)从辊台(4)上升股线部分(21)的尾部; c)通过第一剪切机(9)将通过第一剪切机(9)将第一剪切机(9)通过废料(19)的碎片(19)分解成碎片(19)的初步材料(3) 输送废料块(19)并取出股线部分(21),可以恢复组合式轧制设备的操作准备。

    METHOD FOR CONTINUOUS CASTING OF STEEL AND ELECTROMAGNETIC STIRRER TO BE USED THEREFOR
    98.
    发明申请
    METHOD FOR CONTINUOUS CASTING OF STEEL AND ELECTROMAGNETIC STIRRER TO BE USED THEREFOR 有权
    连续铸造钢和电磁搅拌器的方法

    公开(公告)号:US20110036533A1

    公开(公告)日:2011-02-17

    申请号:US12913290

    申请日:2010-10-27

    CPC classification number: B22D11/122 B22D11/115 B22D11/1206

    Abstract: Disclosed is a continuous casting in which an electromagnetic stirrer is installed upstream, in the casting direction, of the reduction rolling position of a slab, and in which a slab with a liquid core is reduced in thickness, wherein by imparting a collision flow forming-type stirring and a uni-directional alternating flow forming-type stirring, molten steel with concentrated segregation elements is stirred and diffused in a width-wise direction of slab, whereby a slab stabilized in center segregation qualities can be produced over long-time casting operation. Since the stirring flowing pattern is selectively imparted by means of the same electromagnetic stirrer, it is effective to decrease facility and equipment costs, improve maintainability, and extensively cope with various casting conditions. The continuous casting method stably ensures excellent center segregation qualities over a long time in casting of high-strength steel with high crack susceptibility or steel grade for extremely thick plate product.

    Abstract translation: 公开了一种连续铸造,其中电磁搅拌器沿铸造方向安装在板坯的压下轧制位置的上游,并且其中具有液芯的板坯的厚度减小,其中通过使冲击流形成 - 单向搅拌和单向交替流动式搅拌,具有浓缩偏析元素的钢水在板坯的宽度方向上搅拌扩散,由此可以通过长时间的铸造操作生产稳定中心偏析品质的板坯 。 由于通过相同的电磁搅拌器选择性地施加搅拌流动模式,因此降低设备成本和提高维护性以及广泛地应对各种铸造条件是有效的。 连续铸造方法在极高的板材产品的高裂纹敏感性或钢级的高强度钢的铸造中,长时间稳定地确保优异的中心偏析性。

    Method of production of steel for welded structures excellent in low temperature toughness of weld heat affected zone
    99.
    发明授权
    Method of production of steel for welded structures excellent in low temperature toughness of weld heat affected zone 有权
    用于焊接结构的钢的生产方法焊接热影响区的低温韧性优异

    公开(公告)号:US07857917B2

    公开(公告)日:2010-12-28

    申请号:US11632735

    申请日:2005-07-21

    Abstract: The present invention provides a high strength thick steel plate for marine structures superior in weldability and low temperature toughness of the HAZ, which is able to be produced at a low cost without use of a complicated method of production, and a method of production of the same, that is, steel for welded structures excellent in low temperature toughness of the weld heat affected zone and a method of production of the same characterized by casting molten steel containing, by mass %, C: 0.03 to 0.12%, Si: 0.05 to 0.30%, Mn: 1.2 to 3.0%, P: 0.015% or less, S: 0.001 to 0.015%, Cu+Ni: 0.10% or less, Al: 0.001 to 0.050%, Ti: 0.005 to 0.030%, Nb: 0.005 to 0.10%, and N: 0.0025 to 0.0060% by the continuous casting method, making the cooling rate from near the solidification point to 800° C. in the secondary cooling at that time 0.06 to 0.6° C./s, hot rolling the obtained slab, and cooling it from a temperature of 800° C. or more.

    Abstract translation: 本发明提供了一种用于HAZ的焊接性和低温韧性优异的船用结构的高强度厚钢板,其能够在不使用复杂的生产方法的情况下以低成本制造,以及制造方法 相同的是,焊接热影响区的低温韧性优异的焊接结构用钢及其制造方法,其特征在于,以质量%计含有C:0.03〜0.12%Si:0.05〜 0.30%,Mn:1.2〜3.0%,P:0.015%以下,S:0.001〜0.015%,Cu + Ni:0.10%以下,Al:0.001〜0.050%,Ti:0.005〜0.030%,Nb:0.005 至0.10%,N:0.0025〜0.0060%,使二次冷却时的冷却速度接近凝固点至800℃,时间为0.06〜0.6℃/秒,热轧 并从800℃以上的温度进行冷却。

    Method and Device for Cleaning Slabs, Thin Slabs, Profiled Elements, or Similar
    100.
    发明申请
    Method and Device for Cleaning Slabs, Thin Slabs, Profiled Elements, or Similar 审中-公开
    用于清洁板,薄板,异形元件或类似物的方法和装置

    公开(公告)号:US20090217945A1

    公开(公告)日:2009-09-03

    申请号:US12083040

    申请日:2006-09-20

    CPC classification number: B21B45/08 B21B45/04 B21B45/06 B22D11/1206

    Abstract: Disclosed is a method for removing loose scale and other foreign matter from the top and/or bottom face of a cast product (3), such as a slab, thin slab, profiled element, or similar, with the aid of flowable media which are sprayed onto the cast product (3) by means of a cleaning device (5) comprising at least one spraying apparatus (8, 9) that is disposed above the cast product (3) and at least one spraying apparatus (8, 9) that is arranged below the cast product (3). According to said method, the amount of media and/or the effective width and/or the pressure of the media is/are controlled separately and independently of time for each spraying apparatus (8, 9). The invention also relates to a device for removing loose scale and other foreign matter from the top and/or bottom face of a cast product (3) with the aid of flowable media which are sprayed onto the cast product (3) by means of a cleaning device (5) comprising at least one spraying apparatus (8, 9) located above the cast product (3) and at least one spraying apparatus (8, 9) located below the cast product (3). The spraying apparatuses (8, 9) and/or the nozzles (13) that are placed on the spraying apparatuses (8, 9) are configured so as to respond via a controller/a guiding system.

    Abstract translation: 公开了一种借助于可流动介质从铸造产品(3)的诸如板坯,薄板坯,异形元件等的顶面和/或底面去除松散的鳞屑和其它异物的方法, 通过清洁装置(5)喷洒到铸造产品(3)上,清洁装置(5)包括设置在铸造产品(3)上方的至少一个喷洒装置(8,9)和至少一个喷洒装置(8,9), 布置在铸造产品(3)的下方。 根据所述方法,介质的量和/或有效宽度和/或压力对于每个喷涂装置(8,9)分开控制,独立于时间。 本发明还涉及一种用于借助于可流动介质从铸造产品(3)的顶部和/或底面去除松散的鳞屑和其它异物的装置,其通过以下方式喷射到铸造产品(3)上: 清洁装置(5),其包括位于铸造产品(3)上方的至少一个喷涂装置(8,9)和位于铸造产品(3)下方的至少一个喷射装置(8,9)。 放置在喷雾装置(8,9)上的喷洒装置(8,9)和/或喷嘴(13)被配置成经由控制器/引导系统进行响应。

Patent Agency Ranking