MULTI-LAYER INLET DIFFUSER FOR A TERMINAL UNIT

    公开(公告)号:US20210239354A1

    公开(公告)日:2021-08-05

    申请号:US16836765

    申请日:2020-03-31

    Abstract: A terminal unit of a heating, ventilation, and/or air conditioning (HVAC) system includes a fan configured to provide an airflow through the HVAC unit by drawing the airflow into a fan inlet and expelling the airflow out of a fan outlet. The terminal unit also includes an inlet diffuser disposed upstream of the fan inlet relative to a direction of the airflow, wherein the inlet diffuser includes a first layer of perforated metal and a second layer of perforated metal disposed between the first layer of perforated metal and the fan inlet.

    Foam substructure for a heat exchanger

    公开(公告)号:US11073293B2

    公开(公告)日:2021-07-27

    申请号:US16267081

    申请日:2019-02-04

    Abstract: A heat exchanger system includes a heat exchanger coil, a base of a foam structure including a clamp with a first arm and a second arm, where the first arm and the second arm are configured to exert a clamping force against the heat exchanger coil, and a vertical member of the foam substructure coupled to the base and abutting a cover of the heat exchanger system, where the base and the vertical member are configured to block air flowing through the heat exchanger from flowing into a void between the heat exchanger coil and the cover.

    SYSTEMS AND METHODS FOR DYNAMIC RISK ANALYSIS

    公开(公告)号:US20210216928A1

    公开(公告)日:2021-07-15

    申请号:US17147328

    申请日:2021-01-12

    Abstract: A risk management system includes one or more computer-readable storage media having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform natural language processing to categorize threats to assets and perform correlated risk analyses for threats. The instructions cause the one or more processors generate risk scores for assets using threat data and one or more asset risk profiles reflecting characteristics of the assets, the risk scores weighted based on impact weights of threats. Furthermore, the instructions cause one or more processors to generate a plurality of graphic user interfaces including one or more of a map providing visual representations of the assets, locations of the assets, asset risk scores, and threats to assets, a forecast of asset risk scores, an asset summary, an asset risk profile editor, and a consolidated view of rank ordered assets and threats.

    Building radar-camera surveillance system

    公开(公告)号:US11061132B2

    公开(公告)日:2021-07-13

    申请号:US16415762

    申请日:2019-05-17

    Abstract: A building radar-camera system includes a camera configured to capture one or images, the one or more images including first locations within the one or more images of one or more points on a world-plane and a radar system configured to capture radar data indicating second locations on the world-plane of the one or more points. The system includes one or more processing circuits configured to receive a correspondence between the first locations and the second locations of the one or more points, generate a sphere-to-plane homography, the sphere-to-plane homography translating between points captured by the camera modeled on a unit-sphere and the world-plane based on the correspondence between the first locations and the second locations, and translate one or more additional points captured by the camera or captured by the radar system between the unit-sphere and the world-plane based on the sphere-to-plane homography.

    CENTRAL PLANT CONTROL SYSTEM WITH MULTI-LEVEL NON-GRANULAR ASSET ALLOCATION

    公开(公告)号:US20210208547A1

    公开(公告)日:2021-07-08

    申请号:US17205215

    申请日:2021-03-18

    Abstract: A method for controlling equipment includes grouping a plurality of granular assets to form one or more general assets and generating models of the general assets based on the granular assets that form the general assets. Each model corresponds to a general asset and defines a relationship between resources produced by the general asset and resources consumed by the general asset. The method includes performing a first control process using the models of the general assets to determine a first allocation of resources among the general assets. The first allocation defines amounts of the resources to be consumed, produced, or stored by each of the general assets. The method includes operating the equipment to consume, produce, or store the resources in accordance with the first allocation.

Patent Agency Ranking