-
公开(公告)号:US20230383743A1
公开(公告)日:2023-11-30
申请号:US17826984
申请日:2022-05-27
IPC分类号: F04B53/10
CPC分类号: F04B53/1075 , F04B53/1087
摘要: A valve for a displacement pump includes a valve body having an annular strikeface and defining an annular receptacle, and an annular seal received in the receptacle of the valve body, the seal including an annular contact surface, wherein the seal defines a cumulative displacement ratio of (i) at least one of at most 0.20 at a location that is spaced 40% from an inner diameter (ID) of the contact surface of the seal moving towards an outer diameter (OD) of the contact surface, (ii) at most 0.35 at a location that is spaced 55% from the ID of the contact surface moving towards the OD of the contact surface, and (iii) at most 0.45 at a location that is spaced 65% from the ID of the contact surface moving towards the OD of the contact surface.
-
公开(公告)号:US20230374866A1
公开(公告)日:2023-11-23
申请号:US18199668
申请日:2023-05-19
IPC分类号: E21B10/43
CPC分类号: E21B10/43
摘要: A cutter element for a fixed cutter drill bit configured to drill a borehole in a subterranean formation includes a base having a central axis, a first end, a second end, and a radially outer cylindrical surface extending axially from the first end to the second end. In addition, the cutter element includes a cutting layer fixably mounted to the first end of the base. The cutting layer includes a stepped cutting face distal the base and a radially outer cylindrical surface extending axially from the cutting face to the radially outer cylindrical surface of the base. The radially outer cylindrical surface of the cutting layer is contiguous with the radially outer cylindrical surface of the base. The stepped cutting face includes a first step, a second step axially spaced from the first step, and a riser axially positioned between the first step and the second step. The first step is axially positioned between the riser and the base.
-
公开(公告)号:US11814911B2
公开(公告)日:2023-11-14
申请号:US17305299
申请日:2021-07-02
发明人: Christopher J. Saunders , Neil West
摘要: A guide mechanism may include a first jaw and a second jaw pivotably coupled to the first jaw. The jaws may include a guide having a bottom pocket for seating arrangement on a box end of a first tubular and a top funnel for laterally guiding a pin end of a second tubular into the box end. The guide mechanism may also include a linkage system secured to the first and second jaws to control pivoting motion of the jaws. The guide mechanism may also include a bias mechanism coupled to the linkage system and configured to impart a biasing force on the jaws via the linkage system. The biasing force may be adapted to resist opening of the jaws such that opening of the jaws occurs when a lateral force is applied to the guide mechanism that overcomes the biasing force.
-
14.
公开(公告)号:US20230349283A1
公开(公告)日:2023-11-02
申请号:US17735033
申请日:2022-05-02
摘要: A method for drilling a wellbore includes providing a mud motor connected to a downhole end of a drillstring, wherein a bend adjustment assembly of the mud motor is provided in a first configuration, pumping a drilling fluid at a drilling flowrate from a supply pump into the drillstring whereby a drill bit coupled to the drillstring is rotated to drill into the earthen formation, receiving by a drilling controller an actuation command instructing the drilling controller to shift the bend adjustment assembly from the first configuration to a second configuration, and operating by the drilling controller at least one of the supply pump to provide an actuation drilling fluid flowrate stored in a storage device of the drilling controller, and a rotary system to provide an actuation drillstring rotational speed stored in the storage device
-
公开(公告)号:US11754048B2
公开(公告)日:2023-09-12
申请号:US17212578
申请日:2021-03-25
CPC分类号: F03D13/20 , B66C23/185 , E04H12/342
摘要: Tower erection systems and methods utilizing a load-sharing support member (LS support member) are disclosed. The LS support member can have a first end coupled to a crane tower and a second end configured to repeatably couple to the upper-most tower section of a partially assembled tower stack during assembly. During lifting, a portion of the vertical load is transferred to the partially assembled tower stack.
-
公开(公告)号:US20230279728A1
公开(公告)日:2023-09-07
申请号:US18138895
申请日:2023-04-25
摘要: A downhole motor for directional drilling includes a driveshaft assembly including a driveshaft housing and a driveshaft rotatably disposed within the driveshaft housing, a bearing assembly including a bearing housing and a bearing mandrel rotatably disposed within the bearing housing, wherein the bearing mandrel is configured to couple with a drill bit, a bend adjustment assembly configured to adjust a bend setting of the downhole motor, a lock piston including an unlocked position, and a locked position configured to lock the bend setting of the bend adjustment assembly, one or more hydraulic pumps configured to actuate the lock piston into the unlocked position to unlock the bend adjustment assembly, and an electronics package configured to indicate the bend setting of the bend adjustment assembly.
-
公开(公告)号:US20230258046A1
公开(公告)日:2023-08-17
申请号:US18005321
申请日:2021-06-29
发明人: Andrew Ian McKenzie
CPC分类号: E21B19/155 , E21B19/20
摘要: A horizontal pipe storing and stand building system may include a pipe rack and a horizontal stand building system arranged adjacent to the pipe rack and configured to receive tubulars from the pipe rack and construct pipe stands in a horizontal orientation. The system may also include a delivery system arranged adjacent the horizontal stand building system and opposite the pipe rack. The delivery system may be configured to receive horizontally arranged pipe stands from the horizontal stand building system and deliver them to a drill rig.
-
公开(公告)号:US20230085777A1
公开(公告)日:2023-03-23
申请号:US17950294
申请日:2022-09-22
摘要: A drilling fluid conditioning system for a well system includes a return conduit configured to receive drilling fluid recirculated from a wellbore of the well system, a drilling fluid pre-chilling system in fluid communication with and downstream from the return conduit, wherein the drilling fluid pre-chilling system includes a cooler configured to transfer heat from the drilling fluid to a heat sink, and a solids control system in fluid communication with and downstream from the drilling fluid pre-chilling system, wherein the solids control system is configured to separate at least some solids from the drilling fluid.
-
公开(公告)号:US11603730B2
公开(公告)日:2023-03-14
申请号:US17264211
申请日:2019-07-31
IPC分类号: E21B33/06
摘要: A blowout preventer including a housing including a central passage and a first aperture, and a first ram assembly slidably disposed in the first aperture, wherein the first ram assembly includes a ram block and an actuator configured to rotate the ram block when the ram block is disposed in the first aperture of the housing.
-
公开(公告)号:US20230059338A1
公开(公告)日:2023-02-23
申请号:US17891445
申请日:2022-08-19
摘要: A system includes a wellbore that extends from a surface into a subterranean formation. In addition, the system includes a power generation assembly including a fluid circuit that is in fluid communication with the wellbore wherein the power generation assembly is configured to generate electricity in response to a flow of a working fluid through the fluid circuit. Further, the system includes a bubble pump positioned within the wellbore that is configured to circulate the working fluid between the fluid circuit of the power generation assembly and the wellbore via a thermosiphon effect.
-
-
-
-
-
-
-
-
-