System and method to reduce human activity damage-induced power outage

    公开(公告)号:US10460403B2

    公开(公告)日:2019-10-29

    申请号:US14730234

    申请日:2015-06-04

    Abstract: A method for predicting and managing an occurrence of a power outage resulting from human activity, the method comprising the steps of: obtaining at least one short-term notification of a planned human activity event; generating a corrected human activity notification as a function of the short-term notification and data corresponding to power grid information, geographical information relating to the power grid and customers utilizing the power grid, power grid customer information, and/or historical information corresponding to prior power outages resulting from human activity events; generating an outage probability as a function of the corrected human activity notification and trained predictive modeling data; generating an optimization model as a function of the outage probability; and initiating at least one action for mitigating the occurrence of the power outage resulting from human activity as a function of the optimization model.

    Performing automatic map reduce job optimization using a resource supply-demand based approach

    公开(公告)号:US10013289B2

    公开(公告)日:2018-07-03

    申请号:US15140830

    申请日:2016-04-28

    CPC classification number: G06F9/5055 G06F9/5066

    Abstract: Determining optimum values for Map Reduce parameters by identifying parameters that affect performance of a Map Reduce job, determining a relationship between each of the identified parameters and a maximization of resource utilization for a plurality of computing resources configured for executing the Map Reduce job, representing a workflow based upon supply-demand relationships among the plurality of computing resources, modeling an execution cost as a function of the plurality of identified parameters, formulating a non-linear programming problem to minimize the execution cost, reformulating the non-linear programming problem as a linear programming problem, and solving the linear programming problem to determine a combination of parameter values for the plurality of identified parameters that minimizes the execution cost for the Map Reduce job.

    Optimized asset maintenance and replacement schedule

    公开(公告)号:US09959515B2

    公开(公告)日:2018-05-01

    申请号:US14796704

    申请日:2015-07-10

    CPC classification number: G06Q10/06312 G01M99/008 G06Q10/20 Y02P90/86

    Abstract: There are provided a system, a method and a computer program product for generating an optimal preventive maintenance/replacement schedule for a set of assets. The method includes receiving data regarding an asset, said data including a failure rate function of said asset, a cost of preventative maintenance (PM) of said asset, a cost of an asset failure, and a cost of replacing an asset. An optimal number K of preventative maintenance time intervals tk and an indication of a possible replacement is computed and stored for each asset by minimizing a mean cost-rate value function with respect to an electrical age of the asset. A first PM schedule is formed without consideration of labor and budget resource constraints. The method further generates a second maintenance schedule for a system of assets by minimizing a deviation from the optimal PM time intervals subject to the labor and budget resource constraints.

    Parallel technique for computing problem functions in solving optimal power flow
    16.
    发明授权
    Parallel technique for computing problem functions in solving optimal power flow 有权
    用于计算问题函数的并行技术来解决最优潮流

    公开(公告)号:US09552007B2

    公开(公告)日:2017-01-24

    申请号:US14134351

    申请日:2013-12-19

    CPC classification number: G05F1/66 G05B2219/35215 G06F7/60 G06Q50/06

    Abstract: An exemplary method includes solving on a computing system an optimal power flow formulation for a plurality of generators in a power system. The solving includes computing using multi-threaded parallelism a plurality of constraints for the formulation, computing using multi-threaded parallelism a plurality of Jacobian functions of the constraints, and computing using multi-threaded parallelism a Hessian of Lagrangian functions. The method further includes outputting results of the solving, wherein the results comprise values of generation levels for the plurality of generators. Apparatus and program products are also disclosed.

    Abstract translation: 一种示例性方法包括在计算系统上求解用于电力系统中的多个发电机的最优功率流公式。 解决方案包括使用多线程并行化来计算多个约束,用于制定,使用多线程并行化计算约束的多个雅可比函数,以及使用多线程并行度计算拉格朗日函数的Hessian。 该方法还包括输出求解的结果,其中结果包括多个发生器的产生电平的值。 还公开了装置和程序产品。

    Transformer Phase Permutation Causing More Uniform Transformer Phase Aging and general switching network suitable for same
    17.
    发明申请
    Transformer Phase Permutation Causing More Uniform Transformer Phase Aging and general switching network suitable for same 审中-公开
    变压器相位排列导致更均匀的变压器相位老化和通用开关网络适用

    公开(公告)号:US20150247886A1

    公开(公告)日:2015-09-03

    申请号:US14193448

    申请日:2014-02-28

    Abstract: A method includes determining whether transformer phases should be permuted. The method includes, responsive to a determination that the transformer phases should be permuted, permuting the transformer phases, based on historical aging information of transformer input phases, to cause transformer input phases with higher ages to be connected to transformer output phases with lower output loads and transformer input phases with lower ages to be connected to transformer output phases with higher output loads. Multiple apparatus and program products are also disclosed.

    Abstract translation: 一种方法包括确定变压器相应是否被置换。 该方法包括响应于根据变压器输入相的历史老化信息确定变压器相应被置换的变压器相位,以使具有较高年龄的变压器输入相连接到具有较低输出负载的变压器输出相位 和较低年龄的变压器输入相连接到具有较高输出负载的变压器输出相。 还公开了多种设备和程序产品。