Detection and quantification of isolation defects in cement
    12.
    发明授权
    Detection and quantification of isolation defects in cement 有权
    检测和定量水泥中的隔离缺陷

    公开(公告)号:US08919438B2

    公开(公告)日:2014-12-30

    申请号:US13277868

    申请日:2011-10-20

    IPC分类号: E21B47/00 E21B49/06

    CPC分类号: E21B47/0005 E21B49/06

    摘要: A method for evaluating wellbore integrity including introducing a drill to a surface of a casing encompassing an annulus, enclosing the drill in a housing hydraulically isolating the surface, drilling through the casing and into cement surrounding the casing, observing a pressure of the fluid, and using the pressure observation and a drill position to evaluate a presence of a defect and a location of the defect. Apparatus for evaluating wellbore integrity including a probe comprising a drill, wherein the probe is hydraulically isolated from the wellbore, a valve that encompasses the drill, a pressure gauge to measure the pressure of the fluid within the housing, a pressure gauge to measure the pressure in the system outside the housing, and equipment to compare the pressure measurements and the position of the drill and to evaluate a presence and a location of the defect.

    摘要翻译: 一种用于评估井眼完整性的方法,包括将钻孔引导到包围环形物的壳体的表面,将钻孔包围在液压地隔离表面的壳体中,钻穿套管并围绕套管观察流体的压力,以及 使用压力观察和钻头位置来评估缺陷的存在和缺陷的位置。 用于评估井眼完整性的装置,包括包括钻头的探针,其中探针与井眼液压隔离,包含钻头的阀,用于测量壳体内的流体压力的压力计,用于测量压力的压力计 在外壳外的系统中,以及比较压力测量和钻头位置并评估缺陷的存在和位置的设备。

    Tool and method for determining formation parameter
    14.
    发明授权
    Tool and method for determining formation parameter 失效
    确定地层参数的工具和方法

    公开(公告)号:US08720552B2

    公开(公告)日:2014-05-13

    申请号:US13252015

    申请日:2011-10-03

    IPC分类号: E21B43/12 E21B47/00

    摘要: An apparatus and method of measuring a parameter characteristic of a rock formation in an oil well is provided with a device for generating a sensing field within a volume of the rock formation and a device for causing a flow through the volume in the presence of the sensing field, further including sensors responsive to changes in the volume, wherein a sensor response is indicative of the amounts of fluid, particularly hydrocarbon and water saturations and irreducible hydrocarbon and water saturations. Measurements can be made before the flow affects the measuring volume and after onset of the flow through the measuring volume.

    摘要翻译: 在油井中测量岩层的参数特征的装置和方法设置有用于在岩体的体积内产生感测场的装置和用于在存在感测的情况下使流体流过体积的装置 进一步包括响应于体积变化的传感器,其中传感器响应指示流体的量,特别是烃和水饱和度以及不可约的碳氢化合物和水饱和度。 测量可以在流量影响测量体积之前和流过测量体积的开始之后进行。

    Methods for downhole sequestration of carbon dioxide
    17.
    发明授权
    Methods for downhole sequestration of carbon dioxide 有权
    井下封存二氧化碳的方法

    公开(公告)号:US07726402B2

    公开(公告)日:2010-06-01

    申请号:US12167512

    申请日:2008-07-03

    IPC分类号: B65G5/00

    CPC分类号: E21B41/0064 Y02C10/14

    摘要: Carbon dioxide is sequestered in a formation using a dual completion and injection method that reduces or eliminates upward leak rates of the sequestered carbon dioxide. The dual completion and injection method involves the injection of a benign fluid such as brine (water) into a permeable layer of the formation located above the sequestration layer and which is separated form the sequestration layer by a nearly impermeable layer. The water is preferably injected at the same time the carbon dioxide is injected.

    摘要翻译: 使用双重完井和注射方法将二氧化碳隔离在地层中,以减少或消除隔离二氧化碳的向上泄漏速率。 双重完井和注射方法包括将诸如盐水(水)的良性流体注入到位于隔离层上方的地层的可渗透层中,并且通过几乎不可渗透的层从隔离层分离。 优选在注入二氧化碳的同时注入水。

    SYSTEMS AND METHODS FOR DOWNHOLE SEQUESTRATION OF CARBON DIOXIDE
    19.
    发明申请
    SYSTEMS AND METHODS FOR DOWNHOLE SEQUESTRATION OF CARBON DIOXIDE 有权
    二氧化碳的下层序列的系统和方法

    公开(公告)号:US20100116511A1

    公开(公告)日:2010-05-13

    申请号:US12614829

    申请日:2009-11-09

    IPC分类号: E21B43/16

    摘要: Carbon dioxide is sequestered in a formation using dual or multiple completion and injection methods that reduce or eliminates upward leak rates of the sequestered carbon dioxide. The dual or multiple completion and injection method involves the injection of a benign fluid such as brine (water) into a permeable layer of the formation located above the sequestration layer and which is separated form the sequestration layer by a nearly impermeable layer. The water is injected at the same time the carbon dioxide is injected.

    摘要翻译: 使用双重或多次完井和注射方法将二氧化碳隔离在地层中,可减少或消除隔离二氧化碳的向上泄漏速率。 双重或多次完井和注射方法包括将诸如盐水(水)的良性流体注入到位于隔离层上方的地层的可渗透层中,并且通过几乎不可渗透的层从隔离层分离。 在注入二氧化碳的同时注入水。

    METHODS FOR DOWNHOLE SEQUESTRATION OF CARBON DIOXIDE
    20.
    发明申请
    METHODS FOR DOWNHOLE SEQUESTRATION OF CARBON DIOXIDE 有权
    碳二氧化物的井下排序方法

    公开(公告)号:US20100000737A1

    公开(公告)日:2010-01-07

    申请号:US12167512

    申请日:2008-07-03

    IPC分类号: E21B43/00 E21B43/11

    CPC分类号: E21B41/0064 Y02C10/14

    摘要: Carbon dioxide is sequestered in a formation using a dual completion and injection method that reduces or eliminates upward leak rates of the sequestered carbon dioxide. The dual completion and injection method involves the injection of a benign fluid such as brine (water) into a permeable layer of the formation located above the sequestration layer and which is separated form the sequestration layer by a nearly impermeable layer. The water is preferably injected at the same time the carbon dioxide is injected.

    摘要翻译: 使用双重完井和注射方法将二氧化碳隔离在地层中,以减少或消除隔离二氧化碳的向上泄漏速率。 双重完井和注射方法包括将诸如盐水(水)的良性流体注入到位于隔离层上方的地层的可渗透层中,并且通过几乎不可渗透的层从隔离层分离。 优选在注入二氧化碳的同时注入水。