-
公开(公告)号:US20210348490A1
公开(公告)日:2021-11-11
申请号:US17282586
申请日:2019-10-03
Applicant: Schlumberger Technology Corporation
Inventor: Robb Wheatley , Emmanuel Coste , Yves-Marie Subervie , Nam Tuan Nguyen , John MacDonald , Jonathan Wun Shiung Chong , Carlos Rocha , Matthew Worthington , Jeffery Anderson , Alex Bird , Christy Rubenstein , Ying Wang
Abstract: A method can include receiving time series data acquired during equipment operations at a plurality of natural resource sites; detecting operational events using the time series data; ranking the operational events; associating each of the operational events with a corresponding operational action; and outputting at least a portion of the ranked operational events, each with its corresponding operational action.
-
公开(公告)号:US20200208639A1
公开(公告)日:2020-07-02
申请号:US16609082
申请日:2018-04-18
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: David Milton Eslinger , Yves-Marie Clet Robert Subervie , Emmanuel Coste , Anna Danuta Sadowska , Leo Vincent Steenson
Abstract: A method for controlling an ESP-lifted well in an optimal fashion using the ESP speed and choke opening as actuators subject to operational constraints.
-
公开(公告)号:US09897710B2
公开(公告)日:2018-02-20
申请号:US13905131
申请日:2013-05-30
Applicant: Schlumberger Technology Corporation
Inventor: Julian Edward Kragh , Philip A. F. Christie , Emmanuel Coste , Nicolas Goujon , Clement Kostov
Abstract: A tool is described for seismic data collection which may have sensors mounted along its entire length to sample both geophysical signal and noise including at least one of acoustic noise, system noise, and noise resulting from the interaction between the two. Systems and methods for acquiring borehole seismic data are also described. In contrast to conventional systems which attempt to avoid introducing noise into the collected data stream, the present systems include a sufficient type, number, and spacing of sensors to intentionally sample at least one source of noise. The methods include operating a borehole seismic acquisition system to sample both a target signal and at least one source of noise and using a processor with machine-readable instructions for separating the noise from the signal.
-
14.
公开(公告)号:US20170101863A1
公开(公告)日:2017-04-13
申请号:US15315023
申请日:2015-06-30
Applicant: Schlumberger Technology Corporation
Inventor: Emmanuel Coste , Jeffery Anderson
CPC classification number: E21B47/0007 , E21B43/128 , E21B47/12 , E21B47/124 , F04D13/10 , F04D15/0088
Abstract: A method for monitoring an electric submersible pump. The method includes acquiring data indicative of surface measurements obtained while the pump is operating in a downhole environment, acquiring data indicative of downhole measurements obtained while the pump is operating in the downhole environment, storing the downhole data in the downhole environment, periodically transmitting the downhole data from the downhole environment to a remote computing device, and establishing a baseline signature profile based on a correlation of the surface data with the downhole data.
-
公开(公告)号:US20170089192A1
公开(公告)日:2017-03-30
申请号:US15312559
申请日:2015-05-22
Applicant: Schlumberger Technology Corporation
Inventor: Dudi Rendusara , Andrew Meredith , Emmanuel Coste , Leo Steenson , Albert Hoefel
CPC classification number: E21B47/0007 , E21B43/128 , E21B43/2406 , E21B47/12 , F04D13/10 , F04D15/0077 , F04D15/0088 , H02P27/08
Abstract: A method can include receiving sensor information from at least one sensor disposed in a downhole environment that includes an electric submersible pump operatively coupled to a power drive via a cable; receiving electrical information associated with transmission of power via the cable; and identifying a state of the electric submersible pump via an adaptive model of at least the cable and the electric submersible pump based at least in part on a portion of the sensor information and a portion of the electrical information.
-
16.
公开(公告)号:US20130343158A1
公开(公告)日:2013-12-26
申请号:US13905131
申请日:2013-05-30
Applicant: Schlumberger Technology Corporation
Inventor: Julian Edward Kragh , Philip A. F. Christie , Emmanuel Coste , Nicolas Goujon , Clement Kostov
Abstract: A tool is described for seismic data collection which may have sensors mounted along its entire length to sample both geophysical signal and noise including at least one of acoustic noise, system noise, and noise resulting from the interaction between the two. Systems and methods for acquiring borehole seismic data are also described. In contrast to conventional systems which attempt to avoid introducing noise into the collected data stream, the present systems include a sufficient type, number, and spacing of sensors to intentionally sample at least one source of noise. The methods include operating a borehole seismic acquisition system to sample both a target signal and at least one source of noise and using a processor with machine-readable instructions for separating the noise from the signal.
Abstract translation: 描述了一种用于地震数据采集的工具,其可以具有沿其整个长度安装的传感器,以对包括声学噪声,系统噪声和由两者之间的相互作用产生的噪声中的至少一个的地球物理信号和噪声进行采样。 还描述了用于采集井眼地震数据的系统和方法。 与尝试避免将噪声引入收集的数据流的常规系统相比,本系统包括有意采样至少一个噪声源的传感器的足够的类型,数量和间隔。 所述方法包括操作钻孔地震采集系统以对目标信号和至少一个噪声源采样,并且使用具有用于将噪声与信号分离的机器可读指令的处理器。
-
公开(公告)号:US20240352839A1
公开(公告)日:2024-10-24
申请号:US18620847
申请日:2024-03-28
Applicant: Schlumberger Technology Corporation
Inventor: Robb Wheatley , Emmanuel Coste , Yves-Marie Subervie , Nam Tuan Nguyen , John MacDonald , Jonathan Wun Shiung Chong , Carlos Rocha , Matthew Worthington , Jeffery Anderson , Jeffery Anderson , Alex Bird , Christy Rubenstein , Ying Wang
Abstract: A method can include receiving time series data acquired during equipment operations at a plurality of natural resource sites; detecting operational events using the time series data; ranking the operational events; associating each of the operational events with a corresponding operational action; and outputting at least a portion of the ranked operational events, each with its corresponding operational action.
-
公开(公告)号:US20240284077A1
公开(公告)日:2024-08-22
申请号:US18442278
申请日:2024-02-15
Applicant: Schlumberger Technology Corporation
Inventor: Julien Converset , Emmanuel Coste , Graeme Paterson
CPC classification number: H04Q9/00 , E21B41/00 , H04Q2209/823
Abstract: A system and method include receiving a drill plan and wellsite information associated with a well site that includes at least one of: surface information and downhole information. The system and method also include inputting the drill plan and the wellsite information into a machine learning model and determining at least one at least control command based on at least one of: the wellsite information and the drill plan. The system and method additionally include transmitting the at least one control command to a notification destination to change at least one operating parameter of at least one equipment at the wellsite.
-
公开(公告)号:US20210140290A1
公开(公告)日:2021-05-13
申请号:US16491856
申请日:2018-03-08
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: David Milton Eslinger , Emmanuel Coste , Jeffery P. Anderson
Abstract: A system includes a reception interface that receives sensor data of an artificial lift system disposed at least in part in a well; an analysis engine that, based at least in part on a portion of the sensor data, outputs values of state variables of the artificial lift system; and a transmitter interface that transmits information, based at least in part on a portion of the values of state variables, to a surface controller operatively coupled to the artificial lift system.
-
公开(公告)号:US10385857B2
公开(公告)日:2019-08-20
申请号:US15534608
申请日:2015-12-09
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Nam Nguyen , Yves-Marie Clet Robert Subervie , Emmanuel Coste
Abstract: A method for monitoring operation of an electric submersible pump. The method includes receiving data signals indicating values for a plurality of parameters regarding operation of the electric submersible pumping system; establishing, for at least some of the plurality of parameters, an associated reference signal; and detecting a deviation of one of the parameters from the reference signal associated with that parameter. As a result of the deviation having a rate of change below a predetermined threshold, the method includes updating the value of the reference signal to reflect the deviation. As a result of the deviation having a rate of change above the predetermined threshold, the method includes detecting an event and generating an indication of the event. The indication of the event further depends on a type of the parameter and a direction of the deviation from the reference signal.
-
-
-
-
-
-
-
-
-