POST-TENSION TUBE FOUNDATION AND METHOD OF ASSEMBLING SAME

    公开(公告)号:US20200240099A1

    公开(公告)日:2020-07-30

    申请号:US16850864

    申请日:2020-04-16

    发明人: Hongbin Huo Bill Bong

    摘要: A post-tensioned tube foundation for supporting a structure subject to high upset forces is described herein. The post-tensioned tube foundation includes an outer CMP, an inner CMP, and a tubular concrete base positioned between the inner CMP and the outer CMP. The outer CMP includes an inner surface that defines a cavity extending between a first open end and an opposite second open end. The outer CMP is positioned within an excavated hole defined along a ground surface. The inner CMP is positioned within the cavity of the outer CMP such that an annular space is defined between the inner CMP and the outer CMP. The tubular concrete base is positioned within the annular space defined between the inner CMP and the outer CMP. A plurality of bracing beams extend radially outwardly from the tubular concrete base.

    Continuously Prestressed Concrete Pile Splice

    公开(公告)号:US20150267373A1

    公开(公告)日:2015-09-24

    申请号:US14729868

    申请日:2015-06-03

    摘要: A pile splice section for a spliced prestressed concrete pile includes a prestressed concrete element including a first end and a second end and a plurality of tendons that extend from the first end to the second end. A first end assembly at the first end of the prestressed concrete element includes a first plate coupled to the plurality of tendons. The first end assembly further includes a plurality of internally threaded fasteners embedded in the first end of the prestressed concrete element that are engagable via apertures extending through the first plate. A second end assembly at the second end of the prestressed concrete element includes a second metal plate coupled to the plurality of tendons. The second end assembly further includes a plurality of apertures extending through the second plate and accessible via pockets proximate the second end of the prestressed concrete element.

    Self-piloting compressible piling
    13.
    发明授权
    Self-piloting compressible piling 失效
    自导式可压桩

    公开(公告)号:US5505561A

    公开(公告)日:1996-04-09

    申请号:US184950

    申请日:1994-01-18

    CPC分类号: E02D5/523 E02D5/30 E02D5/58

    摘要: A self-piloting compressible piling is provided comprising a plurality of pre-formed pile sections having bores therethrough and adapted to be arranged in end-to-end relation such that the bores are concentrically collinear. An auger plate is positioned beneath the lowest of the sections and has an upper face and lower face. The lower face of the plate has a plurality of curved blades extending therefrom. The plate further has a flared bore concentrically collinear with the bores of the piling sections through its center such that the diameter of the hole is greater on the upper face than on the lower face. A tension-bearing cable having a collapsible lock-jaw mechanism secured to one end thereof is provided which is extendable from above the highest of the piling sections through the bores of the sections and the bore of the plate and engageable with the lower face of the plate for loading the sections and the plate in compression.

    摘要翻译: 提供了一种自引导可压缩桩,其包括多个预成形的桩段,其具有穿过其中的孔,并且适于以端对端关系布置,使得孔同心共线。 螺旋板位于最下面的部分下方,并具有上表面和下表面。 板的下表面具有从其延伸的多个弯曲刀片。 该板还具有与通过其中心的打桩部分的孔同心地共同的扩口孔,使得孔的直径在上表面上比在下表面上更大。 提供了具有固定在其一端上的可折叠锁定爪机构的拉力支承电缆,其可以从最高的打桩部分的上方延伸穿过该部分的孔和该板的孔,并可与 用于装载部件和压板的板。

    ANCHOR ASSEMBLY HAVING PRE-STRESSED MANDREL

    公开(公告)号:US20220412089A1

    公开(公告)日:2022-12-29

    申请号:US17504493

    申请日:2021-10-18

    摘要: Provided is an anchor assembly having a pre-stressed mandrel, which consists of an inner pre-stressed concrete mandrel and an outer cast-in-place anchoring slurry, wherein pre-stressed tendons are arranged inside the concrete mandrel and are prefabricated by a pretensioning method; the anchoring slurry wraps the pre-stressed concrete mandrel, and the cast-in-place anchoring slurry is formed by placing the pre-stressed concrete mandrel in a pile hole, and solidifying after primary grouting or secondary grouting. According to the anchor assembly, the pre-stress is not required to be tensioned and locked on site, so that the quality of the pre-stressed mandrel can be ensured, the on-site construction period can be greatly shortened, and the existing pre-stressed and common non-pre-stressed anchors can be replaced.