公开(公告)号:US10590620B2
公开(公告)日:2020-03-17
申请号:US15577089
申请日:2016-05-25
申请人: Innogy SE
发明人: Daniel Bartminn , Benjamin Matlock
摘要: The invention relates to a method for constructing a foundation for a tower structure, comprising at least one structure-side connection profile in the form of a pipe segment. The method has the steps of providing a foundation pile with a diameter which differs from the diameter of the pipe segment, vibrating and/or ramming the foundation pile into a supporting substratum, aligning and fixing the pipe segment coaxially and concentrically to the foundation pile introduced into the substratum such that an annular space is formed between the pipe segment and the foundation pile, and filling the annular space with a curable casting compound.
-
公开(公告)号:US10260480B2
公开(公告)日:2019-04-16
申请号:US15553963
申请日:2016-02-23
摘要: A wind power installation foundation having a cylindrical central unit, a plurality of steel carriers which are arranged radially around the central unit and which respectively have a first and a second end, and a plurality of foundation piles. The first ends of the steel carriers are fixed to the central unit so that the second ends of the steel carriers are in the form of free ends. The second free ends of the steel carriers are respectively placed on one of the foundation piles.
-
公开(公告)号:US09416512B2
公开(公告)日:2016-08-16
申请号:US14820478
申请日:2015-08-06
发明人: Paul W. Suver
IPC分类号: E02D7/18 , E02D7/22 , E02D7/26 , E02D5/52 , E02D11/00 , E02D5/34 , E02D5/50 , E02D5/56 , E02D5/66 , E02D5/20 , E02D5/32 , E02D7/06 , E02D5/28
CPC分类号: E02D5/526 , E02D5/20 , E02D5/285 , E02D5/32 , E02D5/34 , E02D5/50 , E02D5/56 , E02D5/665 , E02D7/06 , E02D7/18 , E02D7/22 , E02D7/26 , E02D11/00
摘要: Apparatus and methods for the installation of pipe pilings into the ground for use as structural building foundations, geothermal piles, or both, are disclosed. In addition to specialized fittings for pipe pile assemblies, the inventions include specialized drive mechanisms used in conjunction with rotary or vibratory motors. Methods of installing pipe pilings are further improved with the disclosure of methods of adding grout or similar materials during or after installation of the piles.
摘要翻译: 公开了用于将管桩安装到地面中用作结构建筑基础,地热桩或两者的装置和方法。 除了用于管桩组件的专用配件之外,本发明还包括与旋转或振动电动机一起使用的专用驱动机构。 安装管桩的方法进一步改进,在安装桩期间或之后,公开了添加灌浆或类似材料的方法。
-
公开(公告)号:US3939664A
公开(公告)日:1976-02-24
申请号:US485705
申请日:1974-07-03
IPC分类号: E02D3/12 , E02D5/10 , E02D5/28 , E02D5/32 , E02D5/50 , E02D5/54 , E02D5/80 , E02D15/00 , E02D23/16 , E02D5/22
摘要: A large diameter tubular pile for bedding into a borehole has an auxiliary tube extending inside it and a series of axially spaced apart holes through its wall which communicate with the interior of the auxiliary tube through discharge pipes which are arranged to allow flow only from the auxiliary tube to outside the pile. The pile is bedded in a borehole by first inserting the pile and then introducing into the auxiliary tube an injection pipe having a pair of axially spaced apart plugs which seal against the inner wall of the auxiliary tube. The injection pipe is located so that the plugs seal on opposite sides of an opening into a discharge pipe, and grout under pressure is forced from the injection pipe through the discharge pipe into the borehole around the pile. This procedure may be repeated for the other discharge pipes.
摘要翻译: 用于床上用于钻孔的大直径管状桩具有在其内部延伸的辅助管和穿过其壁的一系列轴向间隔开的孔,其通过排出管与辅助管的内部连通,排出管仅允许从辅助 管到堆的外面。 通过首先插入桩然后将桩插入到辅助管中,注入管具有一对轴向间隔开的塞子,该塞子密封在辅助管的内壁上。 注射管的位置使得塞子在开口的相对侧密封到排放管中,并且在压力下的灌浆被迫从注射管通过排出管进入桩周围的钻孔中。 对于其他排放管,可以重复该过程。
-
公开(公告)号:US3875752A
公开(公告)日:1975-04-08
申请号:US25616372
申请日:1972-05-23
申请人: MERJAN STANLEY
发明人: MERJAN STANLEY
摘要: A concrete pile fitted with a special slightly tapered concrete tip of larger area. The tip has a central stub with an open socket for receiving a stem.
-
公开(公告)号:US3842608A
公开(公告)日:1974-10-22
申请号:US31004972
申请日:1972-11-28
申请人: TURZILLO L
发明人: TURZILLO L
摘要: Method of installing a preformed load-bearing pile in an earth situs, utilizing core of predetermined length and having screwlike ridge means externally along the length thereof. Pile core drilled into earth while supplying fluid jetting medium through said passage means to mix with drilled earth and to facilitate upward movement of earth, until pile cavity of requisite depth formed. Pile core further rotated in place while pumping fluid, self-hardenable, cementitious material through passage means, to urge cementitious material along said screw means, thereby to enlarge girth of pile cavity and form generally tubular body about the pile core. Tubular body sets and hardens with loadbearing pile core anchored therein, as composite pile body of correspondingly increased load-bearing capacity.
-
公开(公告)号:US3832859A
公开(公告)日:1974-09-03
申请号:US4391770
申请日:1970-06-05
申请人: KANJANAVANIT R
发明人: KANJANAVANIT R
摘要: A hollow core pile has a cap on the lower end enclosing the lower ends of hinged spread feet. When the pile has been driven to depth, a rod or plunger is extended down the hollow core of the pile and is impacted to drive the cap down clear of the lower ends of the feet. The pile is then driven further so that the inclined ends of the spread feet engage the edges of the cap which forces them outwardly into the spread position.
摘要翻译: 中空芯桩在下端具有盖,其包围铰链传播脚的下端。 当桩已经被驱动到深度时,杆或柱塞向下延伸到堆的中空芯并且被冲击以将盖向下驱动以远离脚的下端。 然后进一步驱动该桩,使得扩展的脚的倾斜端部接合盖的边缘,这迫使它们向外进入展开位置。
-
公开(公告)号:US3512365A
公开(公告)日:1970-05-19
申请号:US3512365D
申请日:1968-01-19
申请人: LUDWIG MULLER
发明人: MULLER LUDWIG
-
-
公开(公告)号:US1792333A
公开(公告)日:1931-02-10
申请号:US25573128
申请日:1928-02-20
申请人: SHOJIRO TAKECHI
发明人: SHOJIRO TAKECHI
CPC分类号: E02D5/50 , B43L13/004
-
-
-
-
-
-
-
-
-