Method and system for using renewable energy sources
    1.
    发明授权
    Method and system for using renewable energy sources 有权
    使用可再生能源的方法和系统

    公开(公告)号:US09543764B2

    公开(公告)日:2017-01-10

    申请号:US12628624

    申请日:2009-12-01

    Applicant: Dirk Adam

    Inventor: Dirk Adam

    Abstract: Method for using renewable energy sources, comprising at least one remote energy generation plant, which is operated by a renewable energy source, a remote control unit at the location of the at least one remote energy generation plant, which controls the operation thereof, and a central control unit, the method comprising the following steps: a) Producing a proposed schedule, in which for a future time period presettings for the operation of the at least one remote energy generation plant are established, and transmitting the proposed schedule to the central control unit via a computer network, b) Producing a schedule based on the proposed schedule, c) Transmitting the schedule from the central control unit to the remote control unit via a computer network, d) Automatic control of the at least one remote energy generation plant by the remote control unit according to the schedule.

    Abstract translation: 所述方法涉及生成建议的池日程表,以及为远程能源发电站(10)的操作建立将来的时间段预设定。 所提出的池日程表通过计算机网络(22)发送到中央控制单元(24),例如。 广域网。 该时间表通过计算机网络从中央控制单元发送到远程控制单元(36)。 遥控单元根据时间表自动控制远程发电厂。 还包括用于使用可再生能源操作远程能量发电厂的系统的独立权利要求,其包括中央控制单元。

    Method and system for using renewable energy sources
    2.
    发明申请
    Method and system for using renewable energy sources 审中-公开
    使用可再生能源的方法和系统

    公开(公告)号:US20100236253A1

    公开(公告)日:2010-09-23

    申请号:US12613910

    申请日:2009-11-06

    Applicant: Dirk ADAM

    Inventor: Dirk ADAM

    Abstract: Method for using renewable energy sources comprising at least one remote energy generation plant which may be operated by a renewable energy source, a production measurement unit at the location of the at least one remote energy generation plant which measures the production of the at least one remote energy generation plant, a central control unit, the method comprising the following steps: a) producing a production forecast for the production of the at least one remote energy generation plant in a future time period, b) transmitting the production forecast to the central control unit via a computer network, c) operating the remote energy generation plant and measuring the production using the production measurement unit, d) comparing the measured production with the production forecast, e) notifying an operator of the at least one energy generation plant, if the measured production deviates from the production forecast beyond a predetermined level.

    Abstract translation: 用于使用可再生能源的方法,所述可再生能源包括可由可再生能源操作的至少一个远程能量发生设备,所述至少一个远程能量发生设备的位置处的生产测量单元测量所述至少一个远程 能源发电厂,中央控制单元,该方法包括以下步骤:a)在未来的时间段内生产至少一个远程能源发电厂的生产预测,b)将生产预测传送到中央控制 通过计算机网络单元; c)使用所述生产测量单元操作所述远程能量发生设备并测量所述生产; d)将所测量的生产与所述生产预测进行比较; e)通知所述至少一个能量发电站的运营商,如果 测量的产量偏离预期水平的生产预测。

    Method and System for Using Renewable Energy Sources
    3.
    发明申请
    Method and System for Using Renewable Energy Sources 有权
    使用可再生能源的方法与系统

    公开(公告)号:US20100161147A1

    公开(公告)日:2010-06-24

    申请号:US12628624

    申请日:2009-12-01

    Applicant: Dirk ADAM

    Inventor: Dirk ADAM

    Abstract: Method for using renewable energy sources, comprising at least one remote energy generation plant, which is operated by a renewable energy source, a remote control unit at the location of the at least one remote energy generation plant, which controls the operation thereof, and a central control unit, the method comprising the following steps: a) Producing a proposed schedule, in which for a future time period presettings for the operation of the at least one remote energy generation plant are established, and transmitting the proposed schedule to the central control unit via a computer network, b) Producing a schedule based on the proposed schedule, c) Transmitting the schedule from the central control unit to the remote control unit via a computer network, d) Automatic control of the at least one remote energy generation plant by the remote control unit according to the schedule.

    Abstract translation: 用于使用可再生能源的方法,包括由可再生能源操作的至少一个远程能量发生设备,在所述至少一个远程能量发生设备的位置处的遥控单元,其控制其操作;以及 中央控制单元,该方法包括以下步骤:a)制定提出的时间表,其中在未来时间段内建立至少一个远程能量发电厂的操作预设,并将所提出的时间表传送到中央控制 通过计算机网络单元; b)根据所提出的时间表生成调度表; c)通过计算机网络将中央控制单元的调度传输给遥控单元; d)至少一个远程能量发电站的自动控制 由遥控器按照时间表。

    Hybrid installation with a biogas installation
    4.
    发明申请
    Hybrid installation with a biogas installation 有权
    混合安装与沼气安装

    公开(公告)号:US20100148585A1

    公开(公告)日:2010-06-17

    申请号:US12594306

    申请日:2008-03-28

    Abstract: A hybrid installation for providing electric energy from regenerative energy sources, comprising a biogas installation that provides electric energy, and at least one additional energy converter, which provides electric energy and whose releasable power is depending of external influence factors, of the wind supply and/or the sun irradiation in particular, wherein the electric energy of the biogas installation and the electric energy of the at least one additional energy converter are fed into a common mains grid, characterised in that the biogas installation features a gas turbine with an electric generator which is operated by the biogas produced in the biogas installation, and whose waste heat can be supplied to the biogas installation via a heat exchanger.

    Abstract translation: 一种用于从再生能源提供电能的混合装置,包括提供电能的沼气装置和至少一个额外的能量转换器,其提供电能并且其释放能量取决于外部影响因素,风力发电和/ 或特别是太阳照射,其中将沼气装置的电能和至少一个附加能量转换器的电能馈送到公共电网中,其特征在于,所述沼气装置具有带有发电机的燃气轮机, 由沼气装置生产的沼气运行,其废热可通过热交换器供给沼气装置。

    Hybrid installation with a biogas installation
    5.
    发明授权
    Hybrid installation with a biogas installation 有权
    混合安装与沼气安装

    公开(公告)号:US08373305B2

    公开(公告)日:2013-02-12

    申请号:US12594306

    申请日:2008-03-28

    Abstract: A hybrid installation for providing electric energy from regenerative energy sources, comprising a biogas installation that provides electric energy, and at least one additional energy converter, which provides electric energy and whose releasable power is depending of external influence factors, of the wind supply and/or the sun irradiation in particular, wherein the electric energy of the biogas installation and the electric energy of the at least one additional energy converter are fed into a common mains grid, characterized in that the biogas installation features a gas turbine with an electric generator which is operated by the biogas produced in the biogas installation, and whose waste heat can be supplied to the biogas installation via a heat exchanger.

    Abstract translation: 一种用于从再生能源提供电能的混合装置,包括提供电能的沼气装置和至少一个额外的能量转换器,其提供电能并且其释放能量取决于外部影响因素,风力发电和/ 或特别是太阳照射,其中将沼气装置的电能和至少一个附加能量转换器的电能馈送到公共电网中,其特征在于,所述沼气装置具有带有发电机的燃气轮机, 由沼气装置生产的沼气运行,其废热可通过热交换器供给沼气装置。