Flow verification system and flow verification method
    3.
    发明授权
    Flow verification system and flow verification method 有权
    流验证系统和流验证方法

    公开(公告)号:US07904257B2

    公开(公告)日:2011-03-08

    申请号:US12219287

    申请日:2008-07-18

    CPC classification number: G01F1/34 G05D7/0635

    Abstract: A flow verification system is adapted to verify flow characteristics just after a flow control device starts flow control by verifying a flow rate in a gas piping system which includes a first cutoff valve, the flow control device installed downstream from the first cutoff valve, and a pressure sensor for measuring pressure downstream from the flow control device, flow verification is made based on the pressure measured by the pressure sensor. The flow verification system also includes a benchmark storage device for storing a benchmark which is calculated by integrating the pressure values measured by the pressure sensor during a normal flow control operation, and an abnormality detection device for detecting an abnormal flow of process gas.

    Abstract translation: 流量验证系统适于在流量控制装置通过验证气体管道系统中的流量之后验证流量特性,该气体管道系统包括第一截止阀,安装在第一截止阀下游的流量控制装置和 压力传感器,用于测量流量控制装置下游的压力,根据压力传感器测量的压力进行流量验证。 流量验证系统还包括:基准存储装置,用于存储在通常的流量控制动作期间积分由压力传感器测定的压力值而计算的基准;以及异常检测装置,用于检测处理气体的异常流量。

    Flow verification system and flow verification method
    4.
    发明申请
    Flow verification system and flow verification method 有权
    流验证系统和流验证方法

    公开(公告)号:US20090063059A1

    公开(公告)日:2009-03-05

    申请号:US12219287

    申请日:2008-07-18

    CPC classification number: G01F1/34 G05D7/0635

    Abstract: A flow verification system is adapted to verify flow characteristics just after a flow control device starts flow control by verifying a flow rate in a gas piping system which includes a first cutoff valve, the flow control device installed downstream from the first cutoff valve, and a pressure sensor for measuring pressure downstream from the flow control device, flow verification is made based on the pressure measured by the pressure sensor. The flow verification system further comprising a benchmark storage device for storing a benchmark which is calculated by integrating the pressure values measured by the pressure sensor during a normal flow control operation, and an abnormality detection device for detecting an abnormal flow of process gas by integrating the pressure values measured by the pressure sensor to calculate a pressure integrated value and comparing the pressure integrated value with the benchmark when the process gas is supplied to the flow control device through the first cutoff valve, controlled in a flow rate by the flow control device, and supplied to the pressure sensor.

    Abstract translation: 流量验证系统适于在流量控制装置通过验证气体管道系统中的流量之后验证流量特性,该气体管道系统包括第一截止阀,安装在第一截止阀下游的流量控制装置和 压力传感器,用于测量流量控制装置下游的压力,根据压力传感器测量的压力进行流量验证。 该流量验证系统进一步包括基准存储装置,用于存储在通常的流量控制操作期间积分由压力传感器测量的压力值而计算出的基准;以及异常检测装置,用于通过将处理气体的异常流量积分 由所述压力传感器测量的压力值,以计算压力积分值,并且当通过所述流量控制装置以流量控制所述处理气体通过所述第一截流阀供应到所述流量控制装置时,将所述压力积分值与所述基准进行比较, 并提供给压力传感器。

    Fluid flow distribution and supply unit and flow distribution control program
    5.
    发明申请
    Fluid flow distribution and supply unit and flow distribution control program 审中-公开
    流体流量分配和供应单元和流量分配控制程序

    公开(公告)号:US20090095364A1

    公开(公告)日:2009-04-16

    申请号:US12230928

    申请日:2008-09-08

    CPC classification number: C23C16/45523 C23C16/45561 Y10T137/877

    Abstract: A fluid flow distribution and supply unit for distributing and supplying a fluid is adapted to immediately control a flow rate of a fluid to be distributed and promptly output the fluid at a predetermined flow distribution ratio. The fluid flow distribution and supply unit comprises a flow rate control device for controlling a flow rate of the fluid and a plurality of on/off valves connected to a secondary side of the flow rate control device. The on/off valves are duty controlled to open and close by determining one cycle corresponding to an operation period of the on/off valves and time-dividing the one cycle at the flow distribution ratio.

    Abstract translation: 用于分配和供应流体的流体流动分配和供应单元适于立即控制要分配的流体的流量并且以预定的流量分配比迅速地输出流体。 流体流量分配和供给单元包括用于控制流体的流量的流量控制装置和连接到流量控制装置的次级侧的多个开/关阀。 通过确定与开/关阀的操作周期相对应的一个周期并且以流量分配比时间分割一个周期,开/关阀被负责控制以打开和关闭。

    Purge gas unit and purge gas supply integrated unit
    6.
    发明申请
    Purge gas unit and purge gas supply integrated unit 有权
    吹扫气体单元和吹扫气供应集成单元

    公开(公告)号:US20080069702A1

    公开(公告)日:2008-03-20

    申请号:US11822387

    申请日:2007-07-05

    CPC classification number: F16K27/003 F15B13/0821 Y10T137/87885

    Abstract: To provide a purge gas unit and a purge gas supply integrated unit having a smaller foot space, the purge gas unit comprises an input block for input of purge gas into the purge gas unit, the input block including a purge passage formed through the input block to provide an opening in a side surface of the input block and an input passage formed branching off from the purge passage; an output block for output of the purge gas from the purge gas unit; a communication block connected to the input block and the output block to provide communication between the input block and the output block.

    Abstract translation: 为了提供具有较小足部空间的净化气体单元和净化气体供应集成单元,净化气体单元包括用于将吹扫气体输入到净化气体单元中的输入块,输入块包括通过输入块形成的净化通道 以在输入块的侧面提供开口,以及从吹扫通道分支形成的输入通道; 用于从净化气体单元输出净化气体的输出块; 连接到输入块和输出块的通信块,以提供输入块和输出块之间的通信。

    Purge gas unit and purge gas supply integrated unit
    7.
    发明授权
    Purge gas unit and purge gas supply integrated unit 有权
    吹扫气体单元和吹扫气供应集成单元

    公开(公告)号:US07874316B2

    公开(公告)日:2011-01-25

    申请号:US11822387

    申请日:2007-07-05

    CPC classification number: F16K27/003 F15B13/0821 Y10T137/87885

    Abstract: To provide a purge gas unit and a purge gas supply integrated unit having a smaller foot space, the purge gas unit comprises an input block for input of purge gas into the purge gas unit, the input block including a purge passage formed through the input block to provide an opening in a side surface of the input block and an input passage formed branching off from the purge passage; an output block for output of the purge gas from the purge gas unit; a communication block connected to the input block and the output block to provide communication between the input block and the output block.

    Abstract translation: 为了提供具有较小足部空间的净化气体单元和净化气体供应集成单元,净化气体单元包括用于将吹扫气体输入到净化气体单元中的输入块,输入块包括通过输入块形成的净化通道 以在输入块的侧面提供开口,以及从吹扫通道分支形成的输入通道; 用于从净化气体单元输出净化气体的输出块; 连接到输入块和输出块的通信块,以提供输入块和输出块之间的通信。

    Gas supply unit
    8.
    发明申请
    Gas supply unit 审中-公开
    供气单元

    公开(公告)号:US20080223455A1

    公开(公告)日:2008-09-18

    申请号:US12073786

    申请日:2008-03-10

    Abstract: To provide a gas supply unit capable of stabilizing a gas supply amount, the gas supply unit includes a mass flow controller, a first fluid control valve connected to the mass flow controller, a second fluid control valve connected in parallel to the first fluid control valve, and a third fluid control valve placed on a secondary side of the second fluid control valve. An opening degree of the third fluid control valve is adjusted based on a pressure difference between secondary pressure of the first fluid control valve and secondary pressure of the second fluid control valve.

    Abstract translation: 为了提供能够稳定气体供给量的气体供给单元,气体供给单元包括质量流量控制器,与质量流量控制器连接的第一流体控制阀,与第一流体控制阀并联连接的第二流体控制阀 以及设置在第二流体控制阀的次级侧上的第三流体控制阀。 基于第一流体控制阀的二次压力与第二流体控制阀的二次压力之间的压力差来调整第三流体控制阀的开度。