APPARATUS AND METHODS FOR CONNECTOR TORQUE SLEEVE

    公开(公告)号:US20210308845A1

    公开(公告)日:2021-10-07

    申请号:US17353473

    申请日:2021-06-21

    Abstract: A torque sleeve for a connector includes a slip ring, a torque ring, a torque spring, and an outer shell. The slip ring includes at least one axial movement inhibiting structure, and a plurality of first teeth having a first sawtooth pattern disposed in an axial direction of the torque sleeve. The torque ring includes at least one radial movement inhibiting structure, and a plurality of second teeth having a second sawtooth pattern disposed in an axial direction of the torque sleeve facing the plurality of first teeth. The torque spring is configured to apply a spring force against the torque ring to encourage movement of the torque ring toward the slip ring. The outer shell is configured to house the slip ring, the torque ring, and the torque spring within the torque sleeve.

    SYSTEMS AND METHODS FOR LATENCY REDUCTION USING MAP STAGGERING

    公开(公告)号:US20210410167A1

    公开(公告)日:2021-12-30

    申请号:US17473572

    申请日:2021-09-13

    Abstract: A scheduling unit is provided for managing upstream message allocation in a communication network. The scheduling unit includes a processor configured to determine (i) a number of channels communicating in one direction stream of the communication network, and (ii) a MAP interval duration of the communication network. The scheduling unit further includes a media access control (MAC) domain configured to (i) calculate a staggered allocation start time for each separate channel of the number of channels, and (ii) assign a different allocation start time, within the MAP interval duration, to each separate channel.

    APPARATUS AND METHODS FOR CONNECTOR TORQUE SLEEVE

    公开(公告)号:US20190224821A1

    公开(公告)日:2019-07-25

    申请号:US16257040

    申请日:2019-01-24

    Abstract: A torque sleeve for a connector includes a slip ring, a torque ring, a torque spring, and an outer shell. The slip ring includes at least one axial movement inhibiting structure, and a plurality of first teeth having a first sawtooth pattern disposed in an axial direction of the torque sleeve. The torque ring includes at least one radial movement inhibiting structure, and a plurality of second teeth having a second sawtooth pattern disposed in an axial direction of the torque sleeve facing the plurality of first teeth. The torque spring is configured to apply a spring force against the torque ring to encourage movement of the torque ring toward the slip ring. The outer shell is configured to house the slip ring, the torque ring, and the torque spring within the torque sleeve.

    Connector torque sleeve
    4.
    外观设计

    公开(公告)号:USD1021811S1

    公开(公告)日:2024-04-09

    申请号:US29840199

    申请日:2022-05-26

    Abstract: FIG. 1 is a top perspective view of a connector torque sleeve showing our new design.
    FIG. 2 is a bottom perspective view thereof.
    FIG. 3 is a front view thereof.
    FIG. 4 is a back view thereof.
    FIG. 5 is a right side view thereof.
    FIG. 6 is a left side view thereof.
    FIG. 7 is a top view thereof.
    FIG. 8 is a bottom view thereof; and,
    FIG. 9 is a perspective view thereof.
    The broken lines shown in the Figures show portions of the connector torque sleeve that form no part of the claimed design.

    SYSTEMS AND METHODS FOR LATENCY REDUCTION USING MAP STAGGERING

    公开(公告)号:US20190069311A1

    公开(公告)日:2019-02-28

    申请号:US16116775

    申请日:2018-08-29

    Abstract: A scheduling unit is provided for managing upstream message allocation in a communication network. The scheduling unit includes a processor configured to determine (i) a number of channels communicating in one direction stream of the communication network, and (ii) a MAP interval duration of the communication network. The scheduling unit further includes a media access control (MAC) domain configured to (i) calculate a staggered allocation start time for each separate channel of the number of channels, and (ii) assign a different allocation start time, within the MAP interval duration, to each separate channel.

    Connector torque sleeve
    7.
    外观设计

    公开(公告)号:USD1040113S1

    公开(公告)日:2024-08-27

    申请号:US29840189

    申请日:2022-05-26

    Abstract: FIG. 1 is a front exploded view of a connector torque sleeve showing our new design. with the back view being a mirror thereof.
    FIG. 2 is an isometric view thereof with the connector torque sleeve in a first position.
    FIG. 3 is an isometric view thereof with the connector torque sleeve in a second position; and,
    FIG. 4 is a front cross-sectional view thereof with the connector torque sleeve in the first position.
    The broken lines shown in the Figures show portions of the connector torque sleeve that form no part of the claimed design. The broken line arrows shown in FIG. 2 are for annotation purposes only to identify the cross-sectional view and form no part of the claimed design. The brackets shown in the FIG. 1 and FIG. 4 views indicate an association of the elements of the exploded views, with the brackets forming no part of the claimed design.

Patent Agency Ranking