Method and apparatus to optimize generator start delay and runtime following outage
    1.
    发明授权
    Method and apparatus to optimize generator start delay and runtime following outage 有权
    优化发电机启动延迟和运行中断后的方法和装置

    公开(公告)号:US09563217B2

    公开(公告)日:2017-02-07

    申请号:US14108490

    申请日:2013-12-17

    CPC classification number: G05F1/66 G05B15/02 H02J9/061 H02J2003/003 Y04S10/54

    Abstract: A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, and automatically determine a generator initial start and restart time delay based at least on a prediction of when an electrical system within the facility needs to be cycled.

    Abstract translation: 用于向设施提供备用电力的系统包括发电机和被配置为确定到设施的电力是否已被中断的控制器,并且至少基于对电气的何时的预测来自动确定发电机初始启动和重新启动时间延迟 设施内的系统需要循环使用。

    METHOD AND APPARATUS TO OPTIMIZE GENERATOR START DELAY AND RUNTIME FOLLOWING OUTAGE
    2.
    发明申请
    METHOD AND APPARATUS TO OPTIMIZE GENERATOR START DELAY AND RUNTIME FOLLOWING OUTAGE 有权
    优化发电机起动延时和运行时间的方法和装置

    公开(公告)号:US20150168975A1

    公开(公告)日:2015-06-18

    申请号:US14108490

    申请日:2013-12-17

    CPC classification number: G05F1/66 G05B15/02 H02J9/061 H02J2003/003 Y04S10/54

    Abstract: A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, and automatically determine a generator initial start and restart time delay based at least on a prediction of when an electrical system within the facility needs to be cycled.

    Abstract translation: 用于向设施提供备用电力的系统包括发电机和被配置为确定到设施的电力是否已被中断的控制器,并且至少基于对电气的何时的预测来自动确定发电机初始启动和重新启动时间延迟 设施内的系统需要循环使用。

    Power system including a load panel protecting a facility from a broken or missing neutral of a split phase electrical distribution configuration
    4.
    发明授权
    Power system including a load panel protecting a facility from a broken or missing neutral of a split phase electrical distribution configuration 有权
    电力系统包括一个负载面板,用于保护设备免受分相电气配置的中断或断线

    公开(公告)号:US09577423B2

    公开(公告)日:2017-02-21

    申请号:US14035188

    申请日:2013-09-24

    CPC classification number: H02H3/325 G01R31/025 H02H3/338 H02H5/105

    Abstract: A power system is for a facility. The power system includes a load panel powered from a split phase electrical distribution configuration having a first line, a second line and a neutral. A two-pole circuit interrupter in the load panel receives power from the first line, the second line and the neutral, and protects an unbalanced load. The two-pole circuit interrupter is structured to trip open or open responsive to an input. A circuit in the load panel is structured to determine that the neutral is broken or missing and responsively output to the input to cause the two-pole circuit interrupter to trip open or open.

    Abstract translation: 电力系统用于设施。 电力系统包括由具有第一线,第二线和中线的分相配电构造供电的负载面板。 负载面板上的两极断路器从第一线路,第二线路和空档接收电力,并保护不平衡负载。 双极电路断路器被构造为响应于输入而断开或断开。 负载面板中的电路被构造成确定空档断开或丢失,并且响应地输出到输入端,以使两极断路器跳闸打开或断开。

    ACTIVE ENGINE COOL DOWN TIME DELAY FOR AUTOMATIC TRANSFER SWITCH CONTROLLERS
    6.
    发明申请
    ACTIVE ENGINE COOL DOWN TIME DELAY FOR AUTOMATIC TRANSFER SWITCH CONTROLLERS 有权
    主动发动机冷却时间延迟用于自动转换开关控制器

    公开(公告)号:US20150171662A1

    公开(公告)日:2015-06-18

    申请号:US14108546

    申请日:2013-12-17

    CPC classification number: H02J9/061 G05B13/021 H02H7/04 H02J9/066 Y10T307/615

    Abstract: A system for providing backup power to a facility includes a generator and a controller. The controller is configured to operate the generator until a condition is met, determine a load history that occurs while operating the generator until the condition is met, determine a cool-down time based on the determined load history, and run the generator to the point when the condition is met and in an unloaded condition for the cool-down time.

    Abstract translation: 用于向设施提供备用电力的系统包括发电机和控制器。 控制器被配置为在满足条件之前操作发电机,确定在运行发电机时发生的负载历史,直到满足条件,基于确定的负载历史确定冷却时间,并将发电机运行到点 当满足条件并处于冷却时间的卸载状态。

    METHOD AND APPARATUS TO CHANGE GENERATOR START DELAY AND RUNTIME FOLLOWING OUTAGE
    7.
    发明申请
    METHOD AND APPARATUS TO CHANGE GENERATOR START DELAY AND RUNTIME FOLLOWING OUTAGE 有权
    发电机起动延时和后续运行的方法和装置

    公开(公告)号:US20150168976A1

    公开(公告)日:2015-06-18

    申请号:US14108645

    申请日:2013-12-17

    Abstract: A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, determine a mode of operation based on a type of occupancy currently within the facility, and if electrical power has been interrupted, then operate the generator based on the determined mode.

    Abstract translation: 用于向设施提供备用电力的系统包括发电机和被配置为确定设备的电力是否已被中断的控制器,基于当前在设施内的占用类型来确定操作模式,以及如果电力具有 被中断,然后根据确定的模式操作发电机。

Patent Agency Ranking