-
公开(公告)号:US10824138B2
公开(公告)日:2020-11-03
申请号:US16258137
申请日:2019-01-25
Applicant: EBARA CORPORATION
Inventor: Koji Nonobe , Takashi Mitsuya , Ryuya Koizumi , Kunio Oishi
IPC: G05B19/418 , G05B19/4155
Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.
-
公开(公告)号:US20210011462A1
公开(公告)日:2021-01-14
申请号:US17036189
申请日:2020-09-29
Applicant: EBARA CORPORATION
Inventor: Koji Nonobe , Takashi Mitsuya , Ryuya Koizumi , Kunio Oishi
IPC: G05B19/4155 , H01L21/677 , G05B19/418 , H01L21/67
Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.
-
公开(公告)号:US11099546B2
公开(公告)日:2021-08-24
申请号:US17036189
申请日:2020-09-29
Applicant: EBARA CORPORATION
Inventor: Koji Nonobe , Takashi Mitsuya , Ryuya Koizumi , Kunio Oishi
IPC: H01L21/677 , G05B19/418 , G05B19/4155 , H01L21/67
Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.
-
公开(公告)号:US10824135B2
公开(公告)日:2020-11-03
申请号:US15868753
申请日:2018-01-11
Applicant: EBARA CORPORATION
Inventor: Koji Nonobe , Takashi Mitsuya , Ryuya Koizumi , Kunio Oishi
IPC: G05B19/4155 , H01L21/677 , G05B19/418 , H01L21/67
Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.
-
-
-