Scheduler, substrate processing apparatus, and substrate conveyance method

    公开(公告)号:US11099546B2

    公开(公告)日:2021-08-24

    申请号:US17036189

    申请日:2020-09-29

    Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.

    Scheduler, substrate processing apparatus, and substrate conveyance method

    公开(公告)号:US10824135B2

    公开(公告)日:2020-11-03

    申请号:US15868753

    申请日:2018-01-11

    Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.

    SCHEDULER, SUBSTRATE PROCESSING APPARATUS, AND SUBSTRATE CONVEYANCE METHOD

    公开(公告)号:US20210011462A1

    公开(公告)日:2021-01-14

    申请号:US17036189

    申请日:2020-09-29

    Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.

    Scheduler, substrate processing apparatus, and substrate conveyance method

    公开(公告)号:US10824138B2

    公开(公告)日:2020-11-03

    申请号:US16258137

    申请日:2019-01-25

    Abstract: A calculation amount and calculation time for a substrate conveyance schedule are reduced. A scheduler is provided which is incorporated in a control section of a substrate processing apparatus including a plurality of substrate processing sections that process a substrate, a conveyance section that conveys the substrate, and the control section that controls the conveyance section and the substrate processing sections, and calculates a substrate conveyance schedule. The scheduler includes: a modeling section that models processing conditions, processing time and constraints of the substrate processing apparatus into nodes and edges using a graph network theory, prepares a graph network, and calculates a longest route length to each node; and a calculation section that calculates the substrate conveyance schedule based on the longest route length.