摘要:
A device and system for controlling fluid flow into a wellbore tubular may include a flow path in a production control device and at least one in-flow control element along the flow path. A media in the in-flow control element adjusts a cross-sectional flow area of the flow path by interacting with water. The media may be an inorganic solid, a water swellable polymer, or ion exchange resin beads. A method for controlling a fluid flow into a wellbore tubular may include conveying the fluid via a flow path from the formation into a flow bore of the wellbore; and adjusting a cross-sectional flow area of at least a portion of the flow path using a media that interacts with water. The method may include calibrating the media to permit a predetermined amount of flow across the media after interacts with water.
摘要:
A device and system for controlling fluid flow into a wellbore tubular may include a flow path in a production control device and at least one in-flow control element along the flow path. A media in the in-flow control element adjusts a cross-sectional flow area of the flow path by interacting with water. The media may be an inorganic solid, a water swellable polymer, or ion exchange resin beads. A method for controlling a fluid flow into a wellbore tubular may include conveying the fluid via a flow path from the formation into a flow bore of the wellbore; and adjusting a cross-sectional flow area of at least a portion of the flow path using a media that interacts with water. The method may include calibrating the media to permit a predetermined amount of flow across the media after interacts with water.
摘要:
A sand-filtering screen-making technique and screen are disclosed, which involves an initial assembly of the sand-filtering screen over an underlying coarse screen. The sand-filtering screen has a mechanical, longitudinal overlap-type joint. End caps are fitted over the filtering screen which has already been preassembled to the underlying coarse screen. The assembly is then mechanically forced through a die to compress the end caps onto the assembled filtering screen and underlying coarse screen. That subassembly is then assembled onto a base pipe and secured. An outer shroud can then be secured to the underlying base pipe, overlaying the filtering screen. The ends of the subassembly comprising the filtering screen and the underlying coarse screen are sealed against the support pipe by a packing gland arrangement at both ends.
摘要:
A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.
摘要:
A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.
摘要:
Systems and methods for increasing fluid flow characteristics within a hydrocarbon production tubing string within a wellbore. An expansion member is passed through the interior flowbore of one or more production tubing string members. The expansion member smoothes the interior surface of the flowbore and may radially expand the interior surface of the flowbore.
摘要:
One or more valves can be run into a string to land near associated ports in the string for injection or/and production service. When multiple valves are installed they can be initially configured to balance flow into or from a zone. The position of each valve can be altered without removal from the string preferably by a wireline shifting tool. One or more valves can also be removed and replaced when worn preferably using a wireline run tool. The valves can come with an integral sand control feature to facilitate production. Sensors to monitor well conditions and to transmit data to the surface can also be incorporated into the valve module.
摘要:
An apparatus for use in a wellbore is disclosed that in one non-limiting embodiment includes a tubular having an inside and an outside, a sensor on the outside of the tubular that provides a sensor signal in response to a strain induced in the tubular, and a processor that provides a signal responsive to the sensor signal to operate a device in the wellbore.
摘要:
A completion tubular is placed in position adjacent the zone or zones to be fractured and produced. It features preferably sliding sleeve valves one series of which can be put in the wide open position after run in for gravel packing and fracturing zones one at a time or in any desired order. These valves are then closed and another series of valves can be opened wide but with a screen material juxtaposed in the flow passage to selectively produce from one or more fractured zones. An annular path behind the gravel is provided by an offset screen to promote flow to the screened production port. The path can be a closed annulus that comes short of the production port or goes over it. For short runs an exterior screen or shroud is eliminated for a sliding sleeve with multiple screened ports that can be opened in tandem.
摘要:
An apparatus for screening earth formation components includes: a base pipe configured to allow the passage of formation fluid therethrough; and a foam layer disposed radially outwardly of the base pipe and configured to allow the passage of formation fluid therethrough and minimize the passage of formation solids therethrough, the foam layer including a plurality of hollow structures forming windows therebetween. A method of manufacturing an apparatus for screening earth formation components is also disclosed.