-
公开(公告)号:US11757612B2
公开(公告)日:2023-09-12
申请号:US17452823
申请日:2021-10-29
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: David F. Heinrich , Gennadiy Rozenberg , Scott P. Faasse , Melvin K. Benedict
CPC classification number: H04L7/0037 , H04L7/0012
Abstract: A process includes a port of a bridge providing a reference clock signal to a first end of an interconnect extending between the first port and a network interface controller. The reference clock signal propagates over the interconnect to provide, at a second end of the interconnect, a delayed reference clock signal at the network interface controller. Pursuant to the process, the bridge senses a timing of the delayed reference clock signal. The process includes communicating management traffic between a network interface of a baseboard management controller and the network interface controller via the interconnect. The communication of the management traffic includes the port, responsive to the sensing of the timing of the delayed reference clock signal, synchronizing communication of data with the first end of the interconnect to the delayed reference clock signal.
-
公开(公告)号:US20230229132A1
公开(公告)日:2023-07-20
申请号:US17580398
申请日:2022-01-20
Applicant: Hewlett Packard Enterprise Development LP
Inventor: David F. Heinrich , Pranay Mahendra , Stephen Robert Jones , Gennadiy Rozenberg
IPC: G05B19/045 , G06F21/44 , G01R21/133
CPC classification number: G05B19/045 , G01R21/133 , G06F21/44 , G05B2219/25257
Abstract: A system is provided, which manages, by a microcontroller internal to a fan installed in a server, power data associated with the fan, wherein the fan includes two pins configured to communicate signals based on an inter-integrated circuit (I2C). During operation of the fan, the microcontroller measures a first and second amount of power consumed by the fan at a first and second time. The microcontroller transmits, via the two pins, the information to a system management entity which monitors and manages the server, wherein the system management entity controls a speed of the fan in response to receiving the measured power data and based on a net power comprising a difference between a total amount of power consumed by the server and an amount of power consumed by the fan.
-
公开(公告)号:US20230134197A1
公开(公告)日:2023-05-04
申请号:US17452823
申请日:2021-10-29
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: David F. Heinrich , Gennadiy Rozenberg , Scott P. Faasse , Melvin K. Benedict
IPC: H04L7/00
Abstract: A process includes a port of a bridge providing a reference clock signal to a first end of an interconnect extending between the first port and a network interface controller. The reference clock signal propagates over the interconnect to provide, at a second end of the interconnect, a delayed reference clock signal at the network interface controller. Pursuant to the process, the bridge senses a timing of the delayed reference clock signal. The process includes communicating management traffic between a network interface of a baseboard management controller and the network interface controller via the interconnect. The communication of the management traffic includes the port, responsive to the sensing of the timing of the delayed reference clock signal, synchronizing communication of data with the first end of the interconnect to the delayed reference clock signal.
-
公开(公告)号:US20220035956A1
公开(公告)日:2022-02-03
申请号:US16942941
申请日:2020-07-30
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Stephen R. Porter , Gennadiy Rozenberg , Yendri Karina Gonzalez Rodriguez , Luis Federico Li Chang , Jhovel Louie L. Lopez
Abstract: A technique includes an access controller of a programmable logic device providing password protection-based access to a memory of the programmable logic device. The programmable logic device initiates programming of the access controller with a password; and in response to the programmable logic device detecting a predetermined stimulus, the programmable logic device initiates communication of the password to the access controller to unlock access to the memory.
-
公开(公告)号:US20210319141A1
公开(公告)日:2021-10-14
申请号:US16844053
申请日:2020-04-09
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Gennadiy Rozenberg , Naysen Robertson , Jhovel Louie Lopez
IPC: G06F21/76 , H03K19/17728 , H04L9/32 , H03K19/1776 , G06F21/44
Abstract: A data processing system comprises a management processor, a programmable logic device (PLD) coupled to the management processor, and a machine-readable medium (MRM). The MRM comprises a PLD configuration image to configure the PLD with image-defined logic that comprises self-verification logic and an image-defined management interface to enable the management processor to communicate with the self-verification logic. The MRM also comprises a cryptographic signature based on the PLD configuration image. The MR also comprises PLD authentication instructions which, when executed by the management processor, cause the management processor to retrieve an address for the PLD configuration image from the PLD via the management interface, use the address to retrieve the PLD configuration image from the PLD via the management interface, retrieve the cryptographic signature from the PLD via the management interface, and use the cryptographic signature and a cryptographic key of a trusted entity to authenticate the PLD configuration image.
-
公开(公告)号:US11443074B2
公开(公告)日:2022-09-13
申请号:US16844053
申请日:2020-04-09
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Gennadiy Rozenberg , Naysen Robertson , Jhovel Louie Lopez
IPC: H04L9/32 , G06F11/22 , G06F15/78 , G06F21/76 , H03K19/17728 , G06F21/44 , H03K19/1776
Abstract: A data processing system comprises a management processor, a programmable logic device (PLD) coupled to the management processor, and a machine-readable medium (MRM). The MRM comprises a PLD configuration image to configure the PLD with image-defined logic that comprises self-verification logic and an image-defined management interface to enable the management processor to communicate with the self-verification logic. The MRM also comprises a cryptographic signature based on the PLD configuration image. The MR also comprises PLD authentication instructions which, when executed by the management processor, cause the management processor to retrieve an address for the PLD configuration image from the PLD via the management interface, use the address to retrieve the PLD configuration image from the PLD via the management interface, retrieve the cryptographic signature from the PLD via the management interface, and use the cryptographic signature and a cryptographic key of a trusted entity to authenticate the PLD configuration image.
-
公开(公告)号:US10698467B2
公开(公告)日:2020-06-30
申请号:US15912670
申请日:2018-03-06
Applicant: Hewlett Packard Enterprise Development LP
Inventor: Daniel Humphrey , Stewart Gavin Goodson, II , Mark Rivera , Gennadiy Rozenberg
Abstract: In some examples, an Emergency Power Off (EPO) device can be connected to a non-EPO port of a computing device, and the EPO device can provide an EPO signal via the non-EPO port to a manager connected to an energy storage device of the computing device, wherein the EPO signal comprises instructions to power off the energy storage device.
-
公开(公告)号:US20190278353A1
公开(公告)日:2019-09-12
申请号:US15912670
申请日:2018-03-06
Applicant: Hewlett Packard Enterprise Development LP
Inventor: Daniel Humphrey , Stewart Gavin Goodson, II , Mark Rivera , Gennadiy Rozenberg
Abstract: In some examples, an Emergency Power Off (EPO) device can be connected to a non-EPO port of a computing device, and the EPO device can provide an EPO signal via the non-EPO port to a manager connected to an energy storage device of the computing device, wherein the EPO signal comprises instructions to power off the energy storage device.
-
-
-
-
-
-
-