-
公开(公告)号:US20180212951A1
公开(公告)日:2018-07-26
申请号:US15744515
申请日:2015-09-04
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Alan Goodrum , Suhas Shivanna , David Koenen , Patrick Schoeller
CPC classification number: H04L63/0823 , H04L63/0428 , H04L63/083 , H04L67/141
Abstract: An example device includes a processor coupled to a network and a memory coupled to the processor. The memory includes computer code for causing the processor to establish a secure connection between a manageability application and an interconnect device, the interconnect device being in communication with a newly connected networked device; and securely communicate, from the manageability application to the interconnect device, temporary login information for the networked device.
-
公开(公告)号:US10749858B2
公开(公告)日:2020-08-18
申请号:US15744515
申请日:2015-09-04
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Alan Goodrum , Suhas Shivanna , David Koenen , Patrick Schoeller
Abstract: An example device includes a processor coupled to a network and a memory coupled to the processor. The memory includes computer code for causing the processor to establish a secure connection between a manageability application and an interconnect device, the interconnect device being in communication with a newly connected networked device; and securely communicate, from the manageability application to the interconnect device, temporary login information for the networked device.
-
公开(公告)号:US11366673B1
公开(公告)日:2022-06-21
申请号:US17183751
申请日:2021-02-24
Applicant: Hewlett Packard Enterprise Development LP
Inventor: Patrick Schoeller , David Heinrich , Scott Faasse
IPC: G06F9/44 , G06F1/32 , G06F9/4401 , G06F1/3296 , G06F1/3287
Abstract: Example implementations relate to system and method of managing transitioning of a computing system to a power-on state from a standby-power state. The computing system includes a manageability controller, an initialization controller, an auxiliary device, and a processor. In such examples, the manageability controller may first determine an initialization status of the auxiliary device from a data corresponding to the auxiliary device, when the computing system is transitioning from the standby-power state to the power-on state. In one or more examples, the initialization status may include the auxiliary device in an initialized stage or a non-initialized stage. Later, the manageability controller may direct the initialization controller to delay the transitioning of the computing system from the standby-power state to the power-on state, in response to determining that the initialization status of the auxiliary device is in the non-initialized stage.
-
公开(公告)号:US10317985B2
公开(公告)日:2019-06-11
申请号:US15108654
申请日:2014-01-29
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Charles W. Cochran , Patrick Schoeller
IPC: G06F1/26 , G06F1/28 , G06F1/30 , G06F1/32 , H02J9/06 , G06F11/20 , G06F9/4401 , G06F1/3296
Abstract: Examples for shutdown of computing devices (202) are described In an example, a shutdown event based on a shutdown criterion may be detected The shutdown criterion may be based on available power of an auxiliary power supply unit (304, 312) In response to detection of the shutdown event, a shutdown trigger to initiate shutdown of a computing device (202) powered by the auxiliary power supply unit (304, 312) may be generated. Further, the shutdown trigger may be provided to a remote management processor (218) of the computing device (202). The shutdown trigger may be provided based on port data (214), which indicates an outlet path from the auxiliary power supply unit (304, 312) to the at least one computing device.
-
-
-