摘要:
Technical solutions are described to for assigning a team to resolve a defect during a manufacturing process. The method includes identifying a root cause of a defect from a root cause database by generating a reference code. The method also includes generating a defect score based on characteristics of the defect and the root cause, and identifying a set of solutions for the defect based on the defect score. The method also includes selecting a first solution from the set of solutions to implement and determining a candidate skill for the implementation. The method also includes identifying, from an employee database, a candidate employee that has the candidate skill and assigning the candidate employee to the team to resolve the defect.
摘要:
Technical solutions are described to for assigning a team to resolve a defect during a manufacturing process. The method includes identifying a root cause of a defect from a root cause database by generating a reference code. The method also includes generating a defect score based on characteristics of the defect and the root cause, and identifying a set of solutions for the defect based on the defect score. The method also includes selecting a first solution from the set of solutions to implement and determining a candidate skill for the implementation. The method also includes identifying, from an employee database, a candidate employee that has the candidate skill and assigning the candidate employee to the team to resolve the defect.
摘要:
Embodiments of the invention relate to an attribute based approach for assessment ergonomic risks, and applying the assessment to reduce the identified ergonomic risks. Ergonomic risks scores are calculated for risk type, operator, and workplace areas. Risks levels are minimized through mitigation strategies and effectiveness and ease of implementation. An operator is assigned or re-allocated to a designated workplace area based on consideration of both workload and ergonomic risk.
摘要:
A method for enabling enhanced decision-making when shipping parts between sites within an organization includes receiving a plurality of orders to deliver parts from a first site to a second site. The method determines a shipping option for shipping the parts from the first site to the second site and, for each of the orders, a transportation risk associated with the shipping option. The transportation risk varies in accordance with a probability that the shipping option will result in a delay, and an amount of revenue that will be affected as a result of the delay. The transportation risk for each of the orders is displayed in a matrix. The method further enables a user to modify the shipping option to adjust the position of each transportation risk within the matrix. A corresponding apparatus and computer program product are also disclosed.
摘要:
A method, data processing system and computer program product for managing inventory used in a manufacturing operation to manufacture a product. The method includes a processor communicating with at least one database containing manufacturing operation data. Several inventory locations and components are identified within the manufacturing operation data. A current component inventory and space data, historical component usage data and a demand forecast are retrieved. A statistical analysis is performed upon the current component inventory and space data, the historical component usage data and the demand forecast to obtain a target inventory level range for each of the components at each of the inventory locations. An inventory level control chart is generated, based on the statistical analysis, for selected components associated with at least one inventory location.
摘要:
A component testing plan considers both distinguishable components and undistinguishable components for each of the distinguishable components. In addition to distinguishable and undistinguishable components, inputs to the system include a level of customer demand, using component-based demand forecasting, and what test types are to be performed. The system then determines a set of combinatorial test options for each of the test types and a cycle time for each combinatorial test option. The system then cognitively develops a component testing plan including a listing of combinatorial test(s) of the set of combinatorial test options for each test type to be performed and how many times to perform each combinatorial test(s) on a testing machine with a known capacity in order to minimize a total cycle time for all of the test types and a number of the testing machine needed; and implementing the component testing plan on a set of test components on a production line.
摘要:
A set of channel inputs corresponding to an order is received. A subset of the set is transformed, using a transformation rule, into a set of strategic transformed inputs. A total impact value and an integrated risk likelihood value corresponding to the order are computed. The integrated risk likelihood value and the total impact value of the order are output, to a shipping system, relative to a second integrated risk likelihood value and a second total impact value of a second completed order from a second channel, as a comparison of a first risk associated with the completed order relative to a second risk associated with the second completed order at a shipping dock. The shipping dock is shared by the order processing channel and the second order processing channel. When the first risk being higher than the second risk, the order is selected for shipping using the shipping system.
摘要:
Embodiments of the invention relate to inventory and resource sharing for sustaining a build-to-order supply chain. A multi-objective optimization model is formulated to identify an optimal strategy that is adaptive and responsive to customer demand to maintain and meet orders in the supply chain while mitigating demand and supply risks.