-
公开(公告)号:US3970021A
公开(公告)日:1976-07-20
申请号:US485722
申请日:1974-07-03
CPC分类号: D05B33/02 , A41H42/00 , A41H43/0207 , D05B41/00 , D05B33/006 , D05D2207/02 , D05D2207/04 , D05D2303/02 , D05D2303/20 , D05D2305/04 , D05D2305/12 , D05D2305/14 , Y10T83/446 , Y10T83/4529 , Y10T83/543
摘要: A series of shirt cuff pattern parts are placed in overlying relationship on a web of lining material and a conveyor belt engages the upper surfaces of the web of lining material and the pattern parts and holds the layers of material together as they are moved through a sewing machine. The overlying side edge of each of the pattern parts is folded down under an edge of the web of lining material, and the sewing machine sews through the folds. A predetermined range of lengths of the connected together series of partially completed shirt cuffs is continuously accumulated from the sewing machine, and are continually fed from the accumulation to a cutter, and are separated by cutting the web of lining material adjacent the trailing edge of a pattern part so that each partially completed shirt cuff is formed with a short length of the web of lining material protruding from the shirt cuff panel pattern part, and the pattern parts are stacked.
摘要翻译: 一系列衬衫袖口图案部分以衬垫材料的网状物叠放在一起,并且输送带与衬里材料的腹板和图案部分的上表面接合,并且当它们移动穿过缝纫时将各层材料保持在一起 机。 每个图案部分的覆盖侧边缘在衬里材料幅材的边缘下折叠,并且缝纫机缝合折痕。 所连接的部分完成的衬衫袖口的连接在一起的长度的预定范围从缝纫机连续地积聚,并且从积累连续地供给到切割器,并且通过切割与邻近的后缘的衬垫材料的网 使得每个部分完成的衬衫袖口形成有从衬衫袖口图案部分突出的衬里材料幅材的短长度,并且图案部分被堆叠。
-
公开(公告)号:US4324087A
公开(公告)日:1982-04-13
申请号:US135104
申请日:1980-03-28
摘要: Tubular bag material is threaded downwardly between spaced support members. A garment support assembly is inserted into the tubular bag material at a level below the support members and then moved upwardly between the support members and rests on the support members. A garment is hung from the hook at the lower end of a downwardly projecting support rod extending from the garment support assembly and the tubular bag material is pulled downwardly by an operator about the garment. A bag cutting and sealing means moves into contact with the tubular bag material about the support rod to form the upper end of the bag about the garment and to cut the formed bag away from the tubular bag material. The operator then pulls the formed bag away from the tubular bag material down onto the garment.
摘要翻译: 管状袋材料在间隔开的支撑构件之间向下螺纹连接。 衣服支撑组件在支撑构件下方的水平面处插入管状袋材料中,然后在支撑构件之间向上移动并搁置在支撑构件上。 衣服从在从衣服支撑组件延伸的向下突出的支撑杆的下端处的钩上悬挂,并且管状袋材料被操作者围绕衣服向下拉动。 袋切割和密封装置围绕支撑杆移动与管状袋材料接触,以围绕衣服形成袋的上端,并将形成的袋子切割成管状袋材料。 然后,操作者将形成的袋子从管状袋材料拉出到衣服上。
-
公开(公告)号:US4227470A
公开(公告)日:1980-10-14
申请号:US942431
申请日:1978-09-14
CPC分类号: D05B37/02
摘要: A placket forming system comprises a double needle sewing machine with a cutter which cuts between the lines of stitching and a positioning apparatus including mechanically movable arms with gripping surfaces which operate in conjunction with the sewing machine and cutter apparatus. The positioning apparatus grips a work piece such as a shirt front placket assembly at the sewing machine work surface after the work piece has been sewn and cut and moves the work piece a predetermined distance along the work surface to a proper position under a cutting blade, and the cutting blade is actuated to make a crow's foot cut in the work piece at the end of the line of stitching in the work piece.
摘要翻译: 衣架成型系统包括具有在缝合线之间切割的切割器的双针缝纫机和包括与缝纫机和切割装置一起操作的夹持表面的机械可移动臂的定位装置。 定位装置在工件被缝合和切割之后,在缝纫机工作表面处抓住诸如衬衫前衣架组件的工件,并将工件沿工件表面移动预定距离到切割刀片下方的适当位置, 并且切割刀片被致动以在工件中的缝合线的末端使乌鸦的脚在工件中切割。
-
公开(公告)号:US4356744A
公开(公告)日:1982-11-02
申请号:US160853
申请日:1980-06-19
CPC分类号: B26D7/18 , A41D27/26 , B26D1/09 , B26D7/0675 , B26F1/00 , B26F2210/16 , Y10S83/953 , Y10T83/0453 , Y10T83/0467 , Y10T83/0476 , Y10T83/2044 , Y10T83/2066 , Y10T83/2194 , Y10T83/6542
摘要: Dome-shaped shoulder pad discs are placed in face-to-face overlying relationship and loaded in segmented carriers of a surface conveyor system. Each carrier moves its shoulder pad discs to a first station where the material is cut between the segments of the carrier and formed into a leading stack of shoulder pads, a following stack of shoulder pads, and an intermediate stack of waste material. The carrier is moved to a second station where the intermediate stack of waste material is pushed downwardly between the segments of the carrier and ejected. The leading segment of the carrier is moved to a third station where the leading stack of shoulder pads is picked from the leading segment of the carrier and moved to a stacker, and then the following segment of the carrier is moved to the third station where its stack of shoulder pads is picked from the following segment of the carrier and moved to the stacker. The stacker forms the shoulder pads in a vertical stack.
摘要翻译: 圆顶形的肩垫盘以面对面的覆盖关系放置,并装载在表面传送系统的分段载体中。 每个载体将其肩垫盘移动到第一工位,其中材料在载体的段之间切割并形成为前排的肩垫,下一叠肩垫和中间的废料堆叠。 载体移动到第二站,在第二站处,废料的中间堆叠在载体的段之间向下推动并被排出。 载体的前导段被移动到第三站,在该第三站处,从载体的引导段拾取前排堆叠的肩垫并移动到堆垛机,然后将载体的随后段移动到第三站,其中 从载体的下一个部分拾取一堆肩垫,并移动到堆垛机。 堆叠器在垂直堆叠中形成肩垫。
-
公开(公告)号:US4112860A
公开(公告)日:1978-09-12
申请号:US548968
申请日:1975-02-11
CPC分类号: D05B33/02 , D05B33/006 , D05D2207/02 , D05D2303/02 , D05D2303/20 , D05D2305/04 , D05D2305/12 , D05D2305/14 , Y10T83/533
摘要: A series of shirt cuff pattern parts are placed in spaced apart relationship on a web of lining material and a conveyor belt system engages and holds the layers of material together as they are moved through a folder and a sewing machine. The movement terminates automatically if the space between the pattern part last received by the system and the pattern part next to be fed to the system is too great or too small. The connected together series of partially completed shirt cuffs is continuously accumulated from the sewing machine on a reel, and the reel is subsequently moved to another work station where the connected series of partially completed shirt cuffs is fed to a cutter on a demand basis. The web of lining material is cut adjacent the trailing edge of the leading pattern part, and when an operator removes the separated partially completed shirt cuff from the connected series for further processing, the feeding and cutting steps are repeated.
-
公开(公告)号:US4082589A
公开(公告)日:1978-04-04
申请号:US766240
申请日:1977-02-07
IPC分类号: B65H45/101 , D06H3/00 , B65H19/22 , B65H19/26
CPC分类号: D06H3/00 , B65H45/101 , Y10T156/1018
摘要: Sheet material is moved along its length from a supply to a take-up spool and the material is inspected as it is moved. A garment pattern image is projected on and is moved with the material. The operator determines where the material is to be cut either from the length accumulated on the take-up spool or from the image projected on the material, and if a flaw in the material is detected, the operator determines if the flaw should be removed by identifying the pattern part in the garment from the image projected on the material where the flaw will appear. If the flaw is to be removed, the operator cuts the flaw out and splices the cut ends of material together at splice marks in the image projected on the material. The spools loaded with sheet material with this procedure are loaded in a creel, and the ends of the sheets of material from the spools in the creel are aligned in a vertically stacked arrangement and moved to a cutting apparatus where the garment pattern is cut in the stacked sheets of material.
-
公开(公告)号:US4176566A
公开(公告)日:1979-12-04
申请号:US887061
申请日:1978-03-16
IPC分类号: B65H45/101 , D06H3/00 , B26D7/00 , D06H7/00
CPC分类号: B65H45/101 , D06H3/00 , B26D2007/206 , Y10T83/0476 , Y10T83/4539 , Y10T83/462 , Y10T83/4632 , Y10T83/828 , Y10T83/851 , Y10T83/902
摘要: Sheet material is moved along its length from a supply to a take-up spool and the material is inspected as it is moved. A garment pattern image is projected on and is moved with the material. The operator determines where the material is to be cut either from the length accumulated on the take-up spool or from the image projected on the material, and if a flaw in the material is detected, the operator determines if the flaw should be removed by identifying the pattern part in the garment from the image projected on the material where the flaw will appear. If the flaw is to be removed, the operator cuts the flaw out and splices the cut ends of material together at splice marks in the image projected on the material. The spools loaded with sheet material with this procedure are loaded in a creel, and the ends of the sheets of material from the spools in the creel are aligned in a vertically stacked arrangement and moved to a cutting apparatus where the garment pattern is cut in the stacked sheets of material.
摘要翻译: 片材沿其长度从供应部件移动到卷取卷轴,并且材料在被移动时被检查。 服装图案图像被投影在材料上并与材料一起移动。 操作人员根据卷绕卷轴上积聚的长度或投影在材料上的图像确定材料的切割位置,如果检测到材料缺陷,操作者确定是否应将该缺陷除去 从投射在缺陷出现的材料上的图像中识别服装中的图案部分。 如果要去除缺陷,操作员会将材料上的图像中的拼接痕拼接在一起,从而将材料的切割端切割出来并将其切割成拼接。 用该方法装载片状材料的卷轴被装入架子架中,并且来自筒子架中的卷轴的材料片的端部以垂直堆叠的布置排列并移动到切割装置,其中服装图案被切割在 堆叠的材料。
-
公开(公告)号:US4004477A
公开(公告)日:1977-01-25
申请号:US582723
申请日:1975-06-02
CPC分类号: D06H7/24 , Y10S83/938 , Y10T83/0448 , Y10T83/6542 , Y10T83/6587 , Y10T83/6633 , Y10T83/7176 , Y10T83/7189
摘要: Fabric cutting apparatus for accurately cutting over-cut pattern pieces, including a pair of band knives spaced apart a distance equal to the width of the pattern pieces, and a plurality of clamp members which hold a stack of the over-cut pattern pieces while a continuous conveying means carries the clamp members between the band knives for cutting.
摘要翻译: 用于精确切割过切割图案片的织物切割装置,包括间隔开等于图案片宽度的一对带刀,以及多个夹持构件,其夹持叠加的切割图案片, 连续输送装置将夹紧构件携带在用于切割的带刀之间。
-
公开(公告)号:US4478359A
公开(公告)日:1984-10-23
申请号:US165747
申请日:1980-07-03
摘要: As a strip of material is intermittently moved along its length from a reel, it is heated so as to remove its curl, it is cut into segments in the form of collar stays, and adhesive is applied to one surface of the collar stay segments. The individual collar stays are then moved laterally into alignment with spaced collar template elements, and then moved into overlying relationship with the pointed portions of the collar template elements, and a worker manually inserts a partially completed collar structure about the template elements. The worker presses the collar material against the adhesive on the collar stay and lifts both the collar and the collar stays from the templates, with the adhesive carrying the collar stays with the collar material. The collar stays are subsequently sewn into the collar with top stitching about the edge of the collar structure.
摘要翻译: 当材料条沿着其长度从卷轴间歇地移动时,它被加热以便去除它的卷曲,它被切成环状的形式的段,并且将粘合剂施加到套环保持段的一个表面上。 然后将单个衣领座横向移动成与间隔的衣领模板元件对准,然后移动到衣领模板元件的尖部的上部关系中,并且工作人员手动地插入围绕模板元件的部分完成的衣领结构。 工作人员将套环材料压靠在套环上的粘合剂上,并将套环和套环支架从模板提升,并且携带套环的粘合剂保持与套环材料。 随后将衣领停留在衣领上缝合,并围绕衣领结构的边缘进行顶部缝合。
-
公开(公告)号:US3979876A
公开(公告)日:1976-09-14
申请号:US581701
申请日:1975-05-28
CPC分类号: B65B7/2871 , B65B51/023
摘要: A carton sealer system moves a plurality of boxes with telescoping upper and lower sections along a horizontal conveyor path, and the top sections are lifted to expose the side walls of the bottom section. Adhesive is applied to the exposed side walls of the bottom sections, the top sections are urged downwardly to their fully closed positions, and the top wall of the top section is urged downwardly and the side walls are pressed inwardly to expel the air from the box and to seal the sections of the box together.
摘要翻译: 纸箱封口机系统沿着水平输送路径移动具有可伸缩的上部和下部的多个箱,并且顶部被提升以露出底部的侧壁。 将粘合剂施加到底部的暴露的侧壁上,顶部部分向下推动到其完全关闭位置,并且顶部的顶壁向下推动并且侧壁被向内按压以从箱体排出空气 并将箱子的部分密封在一起。
-
-
-
-
-
-
-
-
-