摘要:
In one embodiment, this invention presents a foaming additive that comprises at least one amidopropyl betaine having the formula: R—CONHCH2CH2CH2N+(CH3)2CH2COO−wherein R is a capryloyl, a capryl, an octyl, a decyl, a cococyl radical, or a mixture thereof. This foaming additive may be utilized in foamed treatment fluids, and those foamed treatment fluids may be utilized in fracturing and sand control treatments in subterranean operations. Associated methods also are presented herein.
摘要:
Foamed completion fluids and methods of completing subterranean zones penetrated by well bores are disclosed. A method of completing a subterranean zone penetrated by a well bore comprises the steps of providing or preparing a foamed completion fluid comprising water, one or more salts, a gas and a capryl/capramidopropylbetaine surfactant foaming agent, introducing the foamed treating fluid into the subterranean zone, and then carrying out a completion operation in the subterranean zone.
摘要:
A subterranean zone surrounding a well bore is fractured with a fracturing fluid. Micro proppant of 200 mesh or smaller is pumped into far field fractures of the subterranean zone and props the far field fractures open.
摘要:
In one embodiment, the present invention provides a silicone-tackifier matrix composition that comprises at least one silicone polymer component, at least one tackifying agent, and at least one curing agent and/or at least one cross linking agent.
摘要:
The present invention includes methods and compositions that include a resin composition comprising from about 5% to about 30% phenol, from about 40% to about 70% phenol formaldehyde, from about 10 to about 40% furfuryl alcohol, from about 0.1% to about 3% of a silane coupling agent, and from about 1% to about 15% of a surfactant and methods of using of that resin in controlling particulate flowback from a subterranean formation.
摘要:
Methods for stabilizing portions of a subterranean formation that comprise unconsolidated particulates. In one embodiment, the methods of the present invention comprise: providing a consolidating agent; introducing the consolidating agent into an unconsolidated portion of a subterranean formation through a dynamic diversion tool; and allowing the consolidating agent to at least partially consolidate the unconsolidated portion of the subterranean formation.
摘要:
Methods of stabilizing unconsolidated portions of a subterranean formation are provided. In one embodiment, the methods comprise: creating or enhancing at least two slots in an unconsolidated portion of a subterranean formation along a well bore, wherein the slots are positioned about 180 degrees from each other along the inner surface of the well bore; introducing a consolidating agent into the slots in the unconsolidated portion of the subterranean formation; and creating or enhancing at least one fracture in a portion of the subterranean formation.
摘要:
The present invention provides cement compositions that include degradable materials, and methods of using such compositions in subterranean cementing operations. An example of a method of the present invention includes: providing a cement composition that includes a hydraulic cement, and a degradable material; placing the cement composition in a subterranean formation; allowing the cement composition to set therein; and allowing the degradable material to degrade. Another example of a method of the present invention is a method of enhancing the mechanical properties of a cement composition including adding a degradable material to the cement composition and allowing the degradable material to degrade.
摘要:
The present invention relates to improved methods for drilling well bores penetrating producing zones while controlling formation particulates. Some embodiments of the present invention provide methods of drilling a well bore into a subterranean formation comprising the steps of providing a drilling composition comprising a drilling fluid and a consolidating material; and, using the drilling composition while drilling the well bore and allowing the consolidating material in the drilling composition to penetrate into the walls of the well bore.
摘要:
Methods that comprise: providing a carrier fluid comprising a delayed breaker; providing a plurality of proppant aggregates comprising a binder fluid and a filler material; suspending the plurality of proppant aggregates in the carrier fluid; introducing the carrier fluid into the subterranean formation at or above a pressure sufficient to create or enhance at least one fracture, the carrier fluid comprising the plurality of proppant aggregates suspended therein; allowing the carrier fluid to break so as to reduce the viscosity of the carrier fluid; and recovering at least a portion of the carrier fluid from the at least one fracture wherein at least a substantial portion of the plurality of proppant aggregates remains in the at least one fracture so as to create a high porosity propped fracture.