摘要:
Embodiments of the present disclosure include systems and a method. In one embodiment, a system is provided. The system includes a risk calculation system configured to calculate a risk based on a static input and a dynamic input, and a decision support system configured to use the risk to derive a decision. The system also includes a plant control system configured to update operations of a plant based on the decision, wherein the decision predicts future plant conditions.
摘要:
Embodiments of the present disclosure include systems and a method. In one embodiment, a system is provided. The system includes a risk calculation system configured to calculate a risk based on a static input and a dynamic input, and a decision support system configured to use the risk to derive a decision. The system also includes a plant control system configured to update operations of a plant based on the decision, wherein the decision predicts future plant conditions.
摘要:
A method and system of testing an overspeed protection system of a turbomachine. The method and system may include providing an overspeed protection system on a turbomachine that may have a single or multiple shafts; determining whether the speed the shaft or shaft(s) exceeds a shutdown value; changing an overspeed trip value of the turbomachine; and determining whether the overspeed protection system would operate to trip the turbomachine.
摘要:
Embodiments of the present invention have the technical effect of automatically testing an overspeed protection system of a powerplant machine comprising a shaft and integrated with a safety control system. An embodiment of the present invention may automatically test the overspeed protection system while the powerplant machine is in the process of shutting down. Another embodiment of the present invention may automatically test the overspeed protection system of the powerplant machine by adjusting the speed of a shaft while operating at full-speed-no-load.
摘要:
Embodiments of the present invention have the technical effect of determining when to test an overspeed protection system of a powerplant machine. As described herein, embodiments of the present invention may be applied to a wide variety of powerplant machines, each comprising a shaft. After determining that test of the overspeed protection system should be performed, embodiments of the present invention may allow for a variety of methods to test the overspeed protection system.
摘要:
Embodiments of the present invention have the technical effect of automatically testing an overspeed protection system of a powerplant machine comprising a shaft and integrated with a safety control system. An embodiment of the present invention may automatically test the overspeed protection system while the powerplant machine is in the process of shutting down. Another embodiment of the present invention may automatically test the overspeed protection system of the powerplant machine by adjusting the speed of a shaft while operating at full-speed-no-load.
摘要:
Embodiments of the present invention have the technical effect of automatically testing an overspeed protection system of a powerplant machine comprising at least one shaft. An embodiment of the present invention may automatically test the overspeed protection system while the powerplant machine is decelerating from full-speed-no-load (FSNL). Another embodiment of the present invention may automatically test the overspeed protection system of the powerplant machine while the powerplant machine is accelerating to FSNL.
摘要:
Embodiments of the present invention have the technical effect of automatically testing an overspeed protection system associated with multiple powerplant machines of a powerplant. An embodiment of the present invention may automatically test the overspeed protection system while at least one of the powerplant machines is in the process of shutting down. Another embodiment of the present invention may automatically test the overspeed protection system by adjusting the speed of a shaft while at least one of the powerplant machines operates at full-speed-no-load.
摘要:
Embodiments of the present invention have the technical effect of determining when to test an overspeed protection system of a powerplant machine. As described herein, embodiments of the present invention may be applied to a wide variety of powerplant machines, each comprising a shaft. After determining that test of the overspeed protection system should be performed, embodiments of the present invention may allow for a variety of methods to test the overspeed protection system.
摘要:
Embodiments of the present invention have the technical effect of automatically testing an overspeed protection system of a powerplant machine comprising at least one shaft. An embodiment of the present invention may automatically test the overspeed protection system while the powerplant machine is decelerating from full-speed-no-load (FSNL). Another embodiment of the present invention may automatically test the overspeed protection system of the powerplant machine while the powerplant machine is accelerating to FSNL.