RESILIENT OPTIMIZATION AND CONTROL FOR DISTRIBUTED SYSTEMS
    1.
    发明申请
    RESILIENT OPTIMIZATION AND CONTROL FOR DISTRIBUTED SYSTEMS 审中-公开
    分布式系统的灵活优化和控制

    公开(公告)号:US20150301882A1

    公开(公告)日:2015-10-22

    申请号:US14440906

    申请日:2013-11-13

    申请人: Linxia LIAO Kun JI

    发明人: Linxia Liao Kun Ji

    IPC分类号: G06F11/07

    摘要: A method for controlling a system including a plurality of subsystems, includes receiving operational data from the plurality of subsystems of the system (S21). A future condition of each of the plurality of subsystems is estimated from the received operational data (S22). A control strategy for delaying a need for system maintenance is generated based on the estimated future condition of each of the plurality of subsystems (S23). An operation of the system is controlled based on the generated control strategy (S24).

    摘要翻译: 一种用于控制包括多个子系统的系统的方法,包括从系统的多个子系统接收操作数据(S21)。 根据接收到的操作数据来估计多个子系统中的每一个的未来状况(S22)。 基于多个子系统中的每一个的估计未来状况,生成用于延迟系统维护需求的控制策略(S23)。 基于生成的控制策略来控制系统的操作(S24)。

    Resilient optimization and control for distributed systems

    公开(公告)号:US10146611B2

    公开(公告)日:2018-12-04

    申请号:US14440906

    申请日:2013-11-13

    申请人: Linxia Liao Kun Ji

    发明人: Linxia Liao Kun Ji

    IPC分类号: G06F11/07 G05B19/418

    摘要: A method for controlling a system including a plurality of subsystems, includes receiving operational data from the plurality of subsystems of the system (S21). A future condition of each of the plurality of subsystems is estimated from the received operational data (S22). A control strategy for delaying a need for system maintenance is generated based on the estimated future condition of each of the plurality of subsystems (S23). An operation of the system is controlled based on the generated control strategy (S24).

    System and method for fault prognostics enhanced MPC framework
    3.
    发明授权
    System and method for fault prognostics enhanced MPC framework 有权
    故障预测的系统和方法增强了MPC框架

    公开(公告)号:US09134713B2

    公开(公告)日:2015-09-15

    申请号:US13469137

    申请日:2012-05-11

    申请人: Kun Ji Zhen Song

    发明人: Kun Ji Zhen Song

    IPC分类号: G05B13/04 G05B23/02

    CPC分类号: G05B13/048 G05B23/0297

    摘要: A model predictive control (MPC) framework is enhanced to provide prognostic information and fault tolerant control strategies. A system fault is calculated based on predicted values and is used to generate an internal reference trajectory to which the system is controlled using MPC. If the system fault exceeds a threshold maximum, then the MPC control model is either tuned or reconfigured depending on whether the fault is external or internal.

    摘要翻译: 增强了模型预测控制(MPC)框架,以提供预后信息和容错控制策略。 系统故障是根据预测值计算的,用于生成使用MPC控制系统的内部参考轨迹。 如果系统故障超过阈值最大值,则根据故障是外部还是内部,调整或重新配置MPC控制模型。

    SYSTEM AND METHOD FOR VERIFICATION AND VALIDATION OF REDUNDANCY SOFTWARE IN PLC SYSTEMS
    4.
    发明申请
    SYSTEM AND METHOD FOR VERIFICATION AND VALIDATION OF REDUNDANCY SOFTWARE IN PLC SYSTEMS 审中-公开
    PLC系统中冗余软件验证和验证的系统与方法

    公开(公告)号:US20120246612A1

    公开(公告)日:2012-09-27

    申请号:US13415897

    申请日:2012-03-09

    申请人: Kun Ji Zhen Song

    发明人: Kun Ji Zhen Song

    IPC分类号: G06F9/44

    CPC分类号: G06F11/3664 G06F8/35

    摘要: Formal methods are instituted to verify and validate the finite state machine (FSM) of PLC redundancy software. The method and system is implemented through each phase in the lifecycle of the redundancy software; that is, the requirement phase, design phase, implementation phase and, finally, integration phase (including system integration). At each step along the way, the verification and validation process uses tools such as a checklist-based review and inspection, a requirement traceability analysis, formal verification (model checking) and the like to ensure that the created redundancy software is error-free and will perform as intended when implemented in the redundant PLC system.

    摘要翻译: 建立正式的方法来验证和验证PLC冗余软件的有限状态机(FSM)。 该方法和系统通过冗余软件生命周期中的每个阶段实现; 即需求阶段,设计阶段,实施阶段,最后是整合阶段(包括系统集成)。 在此过程的每个步骤中,验证和验证过程都使用诸如基于清单的检查和检查,需求可追溯性分析,形式验证(模型检查)等工具,以确保创建的冗余软件无错误, 将在冗余PLC系统中实现时按照要求执行。

    System and method of energy management control

    公开(公告)号:US10095207B2

    公开(公告)日:2018-10-09

    申请号:US13763870

    申请日:2013-02-11

    申请人: Kun Ji Yan Lu Zhen Song

    发明人: Kun Ji Yan Lu Zhen Song

    摘要: A method of controlling energy consumption in a building includes receiving occupancy data including at least one of occupant request data and occupant schedule data, receiving weather data including at least one of current weather measurement data and weather forecast data, generating an output control signal based on the occupancy data and the weather data, and transmitting the output control signal to a building automation system (BAS) of the building. The occupant request data includes a current request, and the occupant schedule data includes a predicted occupant schedule. The output control signal adjusts a building control device in a zone in the building.

    SYSTEM AND METHOD FOR FAULT PROGNOSTICS ENHANCED MPC FRAMEWORK
    6.
    发明申请
    SYSTEM AND METHOD FOR FAULT PROGNOSTICS ENHANCED MPC FRAMEWORK 有权
    用于故障预处理的系统和方法增强MPC框架

    公开(公告)号:US20130304235A1

    公开(公告)日:2013-11-14

    申请号:US13469137

    申请日:2012-05-11

    申请人: Kun Ji Zhen Song

    发明人: Kun Ji Zhen Song

    IPC分类号: G05B13/04

    CPC分类号: G05B13/048 G05B23/0297

    摘要: A model predictive control (MPC) framework is enhanced to provide prognostic information and fault tolerant control strategies. A system fault is calculated based on predicted values and is used to generate an internal reference trajectory to which the system is controlled using MPC. If the system fault exceeds a threshold maximum, then the MPC control model is either tuned or reconfigured depending on whether the fault is external or internal.

    摘要翻译: 增强了模型预测控制(MPC)框架,以提供预后信息和容错控制策略。 系统故障是根据预测值计算的,用于生成使用MPC控制系统的内部参考轨迹。 如果系统故障超过阈值最大值,则根据故障是外部还是内部,调整或重新配置MPC控制模型。

    CLOUD ENABLED BUILDING AUTOMATION SYSTEM
    7.
    发明申请
    CLOUD ENABLED BUILDING AUTOMATION SYSTEM 有权
    云可建筑自动化系统

    公开(公告)号:US20130274940A1

    公开(公告)日:2013-10-17

    申请号:US13916871

    申请日:2013-06-13

    IPC分类号: G05B19/02

    摘要: A method of controlling energy consumption in a building. The method includes receiving occupant request data comprising a plurality of requests, wherein each of the plurality of requests corresponds to one of a plurality of zones in the building wherein the occupant request data is received via a cloud computing resource. The method also includes receiving weather data comprising at least one of current weather measurement data and weather forecast data wherein the weather data is received via a cloud computing resource. In addition, a facility management rule is received via a cloud computing resource. Further, the method includes generating a plurality of output control signals via cloud computing resource, wherein each of the plurality of output control signals is based on one of a plurality of requests and predicted occupant schedules, energy price data and the facility management rule. The control signals are generated by using simulation-based model predictive control method to determine a set of optimized control signals based on optimized energy use or optimized energy cost. The optimized control signals are transmitted to controllers.

    摘要翻译: 一种控制建筑物能耗的方法。 该方法包括接收包括多个请求的乘员请求数据,其中多个请求中的每一个对应于建筑物中的多个区域中的一个,其中通过云计算资源接收乘员请求数据。 该方法还包括接收包括当前天气测量数据和天气预报数据中的至少一个的天气数据,其中通过云计算资源接收天气数据。 此外,通过云计算资源接收设施管理规则。 此外,该方法包括通过云计算资源生成多个输出控制信号,其中多个输出控制信号中的每一个基于多个请求和预测的乘客计划,能量价格数据和设施管理规则中的一个。 通过使用基于模拟的模型预测控制方法来生成控制信号,以基于优化的能量使用或优化的能量成本确定一组优化的控制信号。 优化的控制信号传输到控制器。

    Systems and methods for control over unreliable networks
    8.
    发明授权
    Systems and methods for control over unreliable networks 有权
    控制不可靠网络的系统和方法

    公开(公告)号:US07826910B2

    公开(公告)日:2010-11-02

    申请号:US12032897

    申请日:2008-02-18

    申请人: Kun Ji Ayman Fawaz

    发明人: Kun Ji Ayman Fawaz

    摘要: A method and system may operate to receive a first data from a sensor of a controlled device via a wireless network at a first time, transmit the first data to a controller system, receive a second data from the sensor of the controlled device via the wireless network at a second time, transmit the second data to the controller system, determine that a third data has not been received prior to a predetermined time period, or that the third data has been received prior to the predetermined time period and the third data is outside of a determined range of values, calculate a fourth data based on the first data and the second data, and transmit the fourth data to the controller system at a third time.

    摘要翻译: 方法和系统可以操作以在第一时间经由无线网络从受控设备的传感器接收第一数据,将第一数据发送到控制器系统,经由无线接收来自受控设备的传感器的第二数据 将第二数据发送到控制器系统,确定在预定时间段之前没有接收到第三数据,或者在预定时间段之前已经接收到第三数据,并且第三数据是 在确定的值范围之外,基于第一数据和第二数据计算第四数据,并且在第三时间将第四数据发送到控制器系统。

    Cloud enabled building automation system
    10.
    发明授权
    Cloud enabled building automation system 有权
    支持云的楼宇自动化系统

    公开(公告)号:US09535411B2

    公开(公告)日:2017-01-03

    申请号:US13916871

    申请日:2013-06-13

    IPC分类号: G05B19/02 G05B15/02 G06Q50/06

    摘要: A method of controlling energy consumption in a building. The method includes receiving occupant request data including a plurality of requests, wherein each of the plurality of requests corresponds to one of a plurality of zones in the building wherein the occupant request data is received via a cloud computing resource. The method also includes receiving weather data including at least one of current weather measurement data and weather forecast data wherein the weather data is received via a cloud computing resource. In addition, a facility management rule is received via a cloud computing resource. Further, the method includes generating a plurality of output control signals via cloud computing resource, wherein each of the plurality of output control signals is based on one of a plurality of requests and predicted occupant schedules, energy price data and the facility management rule. The control signals are generated by using simulation-based model predictive control method to determine a set of optimized control signals based on optimized energy use or optimized energy cost. The optimized control signals are transmitted to controllers.

    摘要翻译: 一种控制建筑物能耗的方法。 该方法包括接收包括多个请求的乘员请求数据,其中多个请求中的每一个对应于建筑物中的多个区域中的一个,其中乘客请求数据经由云计算资源被接收。 该方法还包括接收包括当前天气测量数据和天气预报数据中的至少一个的天气数据,其中通过云计算资源接收天气数据。 此外,通过云计算资源接收设施管理规则。 此外,该方法包括通过云计算资源生成多个输出控制信号,其中多个输出控制信号中的每一个基于多个请求和预测的乘客计划,能量价格数据和设施管理规则中的一个。 通过使用基于模拟的模型预测控制方法来生成控制信号,以基于优化的能量使用或优化的能量成本确定一组优化的控制信号。 优化的控制信号传输到控制器。