-
公开(公告)号:US11668750B2
公开(公告)日:2023-06-06
申请号:US17478736
申请日:2021-09-17
Applicant: NVIDIA Corporation
Inventor: Sailendra Chadalavada , Venkat Abilash Reddy Nerallapally , Jaison Daniel Kurien , Bonita Bhaskaran , Milind Sonawane , Shantanu Sarangi , Purnabha Majumder
IPC: G01R31/3177 , G06F9/38 , G06F1/10 , G01R31/28 , G06F11/22 , G06F15/78 , G01R31/317 , G01R31/319 , G06F1/324 , G01R31/3185 , G06F1/3237 , G06F115/10
CPC classification number: G01R31/3177 , G01R31/2851 , G01R31/31725 , G01R31/31727 , G01R31/31922 , G01R31/318594 , G06F1/10 , G06F1/324 , G06F1/3237 , G06F9/3885 , G06F11/2242 , G06F15/7864 , G06F2115/10
Abstract: During functional/normal operation of an integrated circuit including multiple independent processing elements, a selected independent processing element is taken offline and the functionality of the selected independent processing element is then tested while the remaining independent processing elements continue functional operation. To minimize voltage drops resulting from current fluctuations produced by the testing of the processing element, clocks used to synchronize operations within each partition of a processing element are staggered. This varies the toggle rate within each partition of the processing element during the testing of the processing core, thereby reducing the resulting voltage drop. This may also improve test quality within an automated test equipment (ATE) environment.
-
公开(公告)号:US20230089800A1
公开(公告)日:2023-03-23
申请号:US17478736
申请日:2021-09-17
Applicant: NVIDIA Corporation
Inventor: Sailendra Chadalavada , Venkat Abilash Reddy Nerallapally , Jaison Daniel Kurien , Bonita Bhaskaran , Milind Sonawane , Shantanu Sarangi , Purnabha Majumder
IPC: G01R31/3177
Abstract: During functional/normal operation of an integrated circuit including multiple independent processing elements, a selected independent processing element is taken offline and the functionality of the selected independent processing element is then tested while the remaining independent processing elements continue functional operation. To minimize voltage drops resulting from current fluctuations produced by the testing of the processing element, clocks used to synchronize operations within each partition of a processing element are staggered. This varies the toggle rate within each partition of the processing element during the testing of the processing core, thereby reducing the resulting voltage drop. This may also improve test quality within an automated test equipment (ATE) environment.
-