CONTROL APPARATUS, CONTROL METHOD AND PROGRAM

    公开(公告)号:US20230244225A1

    公开(公告)日:2023-08-03

    申请号:US17919023

    申请日:2021-03-12

    CPC classification number: G05D1/0022 B60W60/005 H04L67/12

    Abstract: A control device for controlling a moving body in a system of monitoring the moving body from a remote location via a network includes a policy database configured to store policy information for controlling the moving body, a policy information calculation unit configured to calculate policy information indicating details of control according to a quality of the network on the basis of surrounding conditions of the moving body and to store the policy information in the policy database, and a control execution unit configured to acquire the quality of the network and to execute control corresponding to the quality of the network with reference to the policy information.

    VIRTUAL WORLD CONSTRUCTION SYSTEM AND METHOD

    公开(公告)号:US20220027116A1

    公开(公告)日:2022-01-27

    申请号:US17264010

    申请日:2019-08-01

    Abstract: Provided is a virtual world construction system that does not impair consistency between virtual worlds and places only small loads on terminals. A client application 10 that is implemented on a user terminal, a plurality of server applications 20 that are implemented on servers, and a proxy 30 that is located on a communication path between the user terminal and the servers and relays operation information and video information are provided. The proxy 30 includes a motion duplication unit 31 that transmits operation information to the plurality of servers by duplicating the operation information, and a video integration/rendering control unit 32 that transmits timing information regarding rendering timing to the plurality of servers, and transmits video information received from at least one of the servers, to the user terminals. A rendering processing unit/video processing unit 23 of each of the servers performs rendering processing and video information transmission processing based on the timing information received from the proxy 30.

    CONTROL APPARATUS, CONTROL SYSTEM, CONTROL METHOD, AND PROGRAM

    公开(公告)号:US20240391472A1

    公开(公告)日:2024-11-28

    申请号:US18692030

    申请日:2021-09-22

    Abstract: Provided is a control apparatus that controls a data acquisition cycle of a sensor of a mobile device in a control system including the mobile device and a mobile device control apparatus that controls the mobile device by analyzing data periodically acquired by the sensor, the control apparatus including: acquisition means for acquiring a speed of the mobile device; and determination means for determining the data acquisition cycle to be set for the sensor, based on the speed and a maximum data acquisition cycle of the sensor to satisfy an allowable reaction distance in the mobile device.

    RESOURCE ALLOCATION APPARATUS, RESOURCE ALLOCATION METHOD AND RESOURCE ALLOCATION PROGRAM

    公开(公告)号:US20220255878A1

    公开(公告)日:2022-08-11

    申请号:US17629079

    申请日:2019-07-23

    Abstract: A resource allocation device 2 includes: a course estimation unit 23 that estimates a course of each mobile terminal 5 based on network information about a location of a mobile terminal 5 acquired from a network device 4, and estimates a probability that each mobile terminal 5 is located in each area at time of prediction; a determination unit 24 that calculates, for each area, the number of mobile terminals 5 in the area using the probability and determines whether the maximum value of an overcommit ratio for each area calculated based on the number of mobile terminals 5 in the area exceeds an upper limit; and an execution unit 25 that executes the allocation or release of resources to an MEC server group 3 located in each area when the maximum value of the overcommit ratio is equal to or less than the upper limit, and refrains from executing the allocation or release of the resources to the MEC server group 3 when the maximum value of the overcommit ratio exceeds the upper limit.

    VIDEO MANAGEMENT APPARATUS, VIDEO MANAGEMENT METHOD AND PROGRAM

    公开(公告)号:US20210400239A1

    公开(公告)日:2021-12-23

    申请号:US17288025

    申请日:2019-10-10

    Abstract: A video management apparatus includes a storage processing unit configured to store, in a storage unit, video data received through a network, a determination unit configured to determine whether or not video data groups stored in the storage unit are analyzed based on a first period of time indicating a period of time until a free capacity becomes insufficient in the storage unit and a second period of time indicating a maximum analysis time required for analysis of the video data groups, a first calculation unit configured to analyze the video data groups to calculate a predetermined statistic in a case where it is determined that the video data groups are analyzed, and a deletion unit configured to delete the analyzed video data groups.

    ROUTE CALCULATION METHOD, ROUTE CALCULATION DEVICE, AND PROGRAM

    公开(公告)号:US20210006486A1

    公开(公告)日:2021-01-07

    申请号:US16969234

    申请日:2019-02-13

    Abstract: A computer executes a first determination procedure determining a first link which at least partially overlaps a disaster area representing a range reached by an influence of a predetermined disaster, among links constituting a network, a second determination procedure determining a second link which at least partially overlaps a road area representing a range of a road width of a predetermined road used to recover from the disaster, among the links constituting the network, a route search procedure searching for a plurality of routes from a start point node to an end point node constituting the network, a grouping procedure grouping the plurality of routes searched for by the route search procedure into groups depending on a first parameter value that is based on the first link included in the routes, a computing procedure computing, for each of the plurality of routes searched for by the route search procedure, a second parameter value that is based on the first link and the second link included in the routes, and a selecting procedure selecting a predetermined number of routes among one or more routes grouped into the same group on the basis of the second parameter value computed by the computing procedure for each of the groups grouped by the grouping procedure.

Patent Agency Ranking